Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-Engage:WP6-PY2-Roadmap"

From EGIWiki
Jump to navigation Jump to search
Line 51: Line 51:
Priority communities:  
Priority communities:  


*EPOS (ENVRIplus)
*<span style="line-height: 1.5em; font-size: 13.28px;">Euro-Argo (ENVRIplus) (Yin)</span>
*Euro-Argo (ENVRIplus)  
*ICOS (ENVRIplus) (Diego)
*ICOS (ENVRIplus)  
*EuroBioImaging (INDIGO) (Yin)
*EuroBioImaging (INDIGO)  
*ENES (INDIGO) (?)
*ENES (INDIGO)  
*EMSO (Diego)
*EMSO


Other communities:<br>  
Other communities:<br>  


*BigDataEurope H2020 project: &nbsp;
*BigDataEurope H2020 project (Enol)
*Some VRE projects (Gergely)
*...KM3Net?
*...KM3Net?


Line 139: Line 139:
|  
|  
|  
|  
*3 community pilots are implemented: AAI, Computing, Data management (Deliverable in M24)
*3 community pilots are implemented: AAI, Computing, Data management (Deliverable in M24)  
*Initial conclusions are drawn from the setup
*Initial conclusions are drawn from the setup  
**&nbsp;These conclusions will drive work in PY3, turning the pilots into production services.
**&nbsp;These conclusions will drive work in PY3, turning the pilots into production services.


Line 149: Line 149:
| Task 6.10, Disaster Mitigation  
| Task 6.10, Disaster Mitigation  
|  
|  
|  
| TBC: Implementation of the following case studies (with the use of grid services):<br>
*...
*Typhoon Haiyan (PH, TW)
*Tsunami cave in Lhong-Aceh Besar (ID, TW)
*Flooding 2014-15 (MY, TW)
*Flooding 2008 (Nepal, TW)
*Tsunami impact analysis in South China Sea (TW, PH)


|  
|  

Revision as of 14:59, 12 July 2016

EGI-Engage project: Main page WP1(NA1) WP3(JRA1) WP5(SA1) PMB Deliverables and Milestones Quality Plan Risk Plan Data Plan
Roles and
responsibilities
WP2(NA2) WP4(JRA2) WP6(SA2) AMB Software and services Metrics Project Office Procedures




This page is providing yearly activity plan for WP6 in PY2


Project month

Project Tasks

Work to be done

Goal 

(measurable)

Owner

(responsible person)

Comments
x Task 6.1, Training
  • Webinars and/of F2F events (with online user guide) about
    • ODP, DataHub (Lukasz+Diego, Matthew)
    • AAI (LIP)
    • GPGPU (Matthew+Giuseppe)
    • FedCloud API use (Giuseppe)
    • LToS (Giuseppe)
    • High-level platforms (Giuseppe, Yin-CommunityServices, Enol-CloudPlatforms/Orchestrators)
    • Security for RI managers, security user awareness (STFC, CERN, NIKHEF)
  • Continued coordination of the training infrastructure (and operation, but that's unfunded) (Gergely)
See in previous column
x Task 6.2, Tech. User Support

Priority communities:

  • Euro-Argo (ENVRIplus) (Yin)
  • ICOS (ENVRIplus) (Diego)
  • EuroBioImaging (INDIGO) (Yin)
  • ENES (INDIGO) (?)
  • EMSO (Diego)

Other communities:

  • BigDataEurope H2020 project (Enol)
  • Some VRE projects (Gergely)
  • ...KM3Net?
See in previous column
x Task 6.3, ELIXIR
  • 5 scientific use case (from M6.3) are running on the EGI FedCloud
  • Conculsions are drawn on the use of cloud federation for ELIXIR applications
  • The ELIXIR Compute Platform is operated as a service for ELIXIR users, integrating cloud, AAI, monitoring, GOCDB services from EGI (underpinned by an SLA)
CC leader
  • x
Task 6.4, BBMRI CC leader
x Task 6.5, MoBrain
  • GPGPU portals (with GROMACS and AMBER) are offered as production service
  • Cryo-EM is available for cloud deployment in any EGI cloud via AppDB
...
  • x
Task 6.6, DARIAH
  • E-infra service portfolio for A&H established (gLibrary, SEE, CDSTAR, WS-PGRADE)
  • Active user base - They are engaged with at community events, Webinars, pro-active outreach
x Task 6.7, LifeWatch
  • X LifeWatch applications are deployed in EGI. Application usage is monitored by...
  • Task forces:
    • MongoDB
    • GeoServer
    • R
    • Storage
    • AAI
    • Citizen Science
x Task 6.8, EISCAT_3D
  • Requirements for second portal version are collected in RT queue
  • EISCAT_3D Data Structure is defined (External activity but a dependency for the portal)
  • Second (computational) portal is in final stage of development (deliveraby in Month 28)
x Task 6.9, EPOS
  • 3 community pilots are implemented: AAI, Computing, Data management (Deliverable in M24)
  • Initial conclusions are drawn from the setup
    •  These conclusions will drive work in PY3, turning the pilots into production services.
x Task 6.10, Disaster Mitigation TBC: Implementation of the following case studies (with the use of grid services):
  • Typhoon Haiyan (PH, TW)
  • Tsunami cave in Lhong-Aceh Besar (ID, TW)
  • Flooding 2014-15 (MY, TW)
  • Flooding 2008 (Nepal, TW)
  • Tsunami impact analysis in South China Sea (TW, PH)