Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-Engage:WP6-PY1-Roadmap"

From EGIWiki
Jump to navigation Jump to search
 
(17 intermediate revisions by 2 users not shown)
Line 1: Line 1:
<p>&lt;img class="FCK__MWTemplate" src="https://wiki.egi.eu/w/extensions/FCKeditor/fckeditor/editor/images/spacer.gif" _fckfakelement="true" _fckrealelement="2" _fck_mw_template="true"&gt; &lt;img class="FCK__MWTemplate" src="https://wiki.egi.eu/w/extensions/FCKeditor/fckeditor/editor/images/spacer.gif" _fckfakelement="true" _fckrealelement="0" _fck_mw_template="true"&gt;
This page is providing yearly activity plan for WP6 in PY1:
</p><p><br />
</p><p>This page is providing yearly activity plan for WP6 in PY1<br />
</p><p><br />
</p><p><br />
</p>
<h2> YIN  </h2>
<table class="wikitable">


<tr>
*TASK SA2.1 Training
<th> Project month<br />
*TASK SA2.2 Technical User Support
</th>
*TASK SA2.3 ELIXIR (start in M6)  
<th>
*TASK SA2.4 BBMRI (start in M7)  
<p>Project Tasks
*TASK SA2.5 MoBrain
</p>
*TASK SA2.6 DARIAH
</th>
*TASK SA2.7 LifeWatch
<th>
*TASK SA2.8 EISCAT_3D
<p>Work to be done
*TASK SA2.9 EPOS
</p>
*TASK SA2.10 Disaster Mitigation
</th>
<th>
<p>Goal&#160;
</p><p>(measurable)
</p>
</th>
<th>
<p>Owner
</p><p>(reponsible person)
</p>
</th>
<th> Comments
</th></tr>
<tr>
<th> 2
</th>
<td> Task 6.8
</td>
<td> Scope the investigation plan, and get each party agree on the task force. Set up weekly meeting for discussion and progress monitoring.
</td>
<td> Reach agreement on task responsibilities of participating parties
</td>
<td> Yin Chen (EGI)
</td>
<td> Agreement was achieved by May
</td></tr>
<tr>
<th> 6
</th>
<td> Task 6.8
</td>
<td> Identify priority development components, draft the first version of Portal Design Specification<br />
</td>
<td> First version of the portal design specification to be delivered <br />
</td>
<td>Ingemar Haggstrom(EISCAT)/Yin Chen(EGI) <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 6
</th>
<td>Task 6.8
</td>
<td> Present the first version of design specification to EISCAT community and get feedback and approval<br />
</td>
<td>Present the first version of the design specification to EISCAT community, and get feedback and approval.<br />
</td>
<td>Ingemar Haggstrom(EISCAT)/Yin Chen(EGI)  <br />
</td>
<td>A presentation can be given at the EISCAT annual conference in Sep, to get feedback inputs from EISCAT scientific community <br />
</td></tr>
<tr>
<th> 10
</th>
<td>Task 6.8
</td>
<td> Develop the portal prototype based on the first version of the design specification.<br />
</td>
<td> Portal prototype to be delivered<br />
</td>
<td> Ake Sandgren(SNIC)<br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 12
</th>
<td>Task 6.8
</td>
<td>Based on the feedback from EISCAT community, identify priority development areas. Refine the first version of the design specification, adding new functional elements and to draft the second version of the design specification. Present the second version of design specification to EISCAT community and get feedback<br />
</td>
<td> Second version of the portal design specification to be delivered, feedback to be obtained from EISCAT community<br />
</td>
<td>Ingemar Haggstrom(EISCAT)/Yin Chen(EGI) <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 12
</th>
<td>Task 6.8
</td>
<td> Deliver the Portal prototype, and identify a few EISCAT users to test it. <br />
</td>
<td> Present the protal EISCAT community, and get feedback.<br />
</td>
<td> Ake Sandgren(SNIC)<br />
</td>
<td> <br />
</td></tr>
</table>
<p><br />
</p>
<h2> ENOL  </h2>
<table class="wikitable">


<tr>
<br>  
<th> Project month<br />
</th>
<th>
<p>Project Tasks
</p>
</th>
<th>
<p>Work to be done
</p>
</th>
<th>
<p>Goal&#160;
</p><p>(measurable)
</p>
</th>
<th>
<p>Owner
</p><p>(reponsible person)
</p>
</th>
<th> Comments
</th></tr>
<tr>
<th> 1
</th>
<td> Task 6.2
</td>
<td> Definition of the technical use cases support process
</td>
<td> Establishment of a procedure for handling use case support, RT queue for tracking use cases
</td>
<td> Gergely Sypos / Enol Fernandez
</td>
<td>
</td></tr>
<tr>
<th> X
</th>
<td> Task 6.2
</td>
<td> Pilot usage of EGI infrastructure by HBP
</td>
<td> XX
</td>
<td> XXX
</td>
<td>
</td></tr>
<tr>
<th> XX
</th>
<td> Task 6.2
</td>
<td> Pilot usage of EGI infrastructure by LOFAR/SKA
</td>
<td> XX
</td>
<td> XX
</td>
<td>
</td></tr>
<tr>
<th> 9
</th>
<td> Task 6.7
</td>
<td> Assisted pattern recognition tools integrated with EGI for citizen science
</td>
<td> XXX
</td>
<td> Jesús Marco/Fernando Aguilar
</td>
<td>
</td></tr>
<tr>
<th> 12
</th>
<td> Task 6.7
</td>
<td> Data flow handler and basic R tools to integrate and process data from Ecological Observatories on EGI
</td>
<td> XXX
</td>
<td> Jesús Marco/Fernando Aguilar)
</td>
<td>
</td></tr></table>
<p><br />
</p>
<h2> DIEGO  </h2>
<table class="wikitable">


<tr>
<br>  
<th> Project month<br />
</th>
<th>
<p>Project Tasks
</p>
</th>
<th>
<p>Work to be done
</p>
</th>
<th>
<p>Goal&#160;
</p><p>(measurable)
</p>
</th>
<th>
<p>Owner
</p><p>(reponsible person)
</p>
</th>
<th> Comments
</th></tr>
<tr>
<th> 12
</th>
<td> Task 6.9
</td>
<td> EPOS requirements analysis and outline of pilot use cases are agreed<br />
</td>
<td>
<ul><li>AAI requirements analysed and the EPOS AAI architecture envisaged.
</li><li>Basic multidisciplinary AAI use case defined: it deals with the discovery of heterogeneous data from the ICS-C portal
</li><li>An extended, single discipline, computational oriented use case defined<br />
</li></ul>
</td>
<td> Daniele Balio (EPOS/INGV), Diego Scardaci (EGI.eu/INFN)<br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 1
</th>
<td>
</td>
<td>
</td>
<td>
</td>
<td>
</td>
<td>
</td></tr>
<tr>
<th> 2
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 3
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 4
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 5
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 6
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 7
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 8
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 9
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 10
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 11
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr>
<tr>
<th> 12
</th>
<td>
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td>
<td> <br />
</td></tr></table>
<p><br />
</p>
<h2> GERGELY  </h2>
<table class="wikitable">


<tr>
<br>  
<th> Project month<br />
 
</th>
{| class="wikitable sortable"
<th>
|-
<p>Project Tasks  
! Project month<br>  
</p>
!
</th>
Project Tasks  
<th>
 
<p>Work to be done  
!
</p>
Work to be done  
</th>
 
<th>
!
<p>Goal&#160;  
Goal&nbsp;  
</p><p>(measurable)  
 
</p>
(measurable)  
</th>
 
<th>
!
<p>Owner  
Owner  
</p><p>(reponsible person)  
 
</p>
(reponsible person)  
</th>
 
<th> Comments
! Comments
</th></tr>
|-
<tr>
!
<th>
3  
<p>3  
 
</p>
|
</th>
Task 6.1  
<td>
 
<p>Task 6.1  
|
</p>
Define EGI's training plan for the 1st year of EGI-Engage  
</td>
 
<td>
|
<p>Define EGI's training plan for the 1st year of EGI-Engage  
M6.1 Joint training programme for the first project year (With EUDAT, PRACE, CCs, NGIs, UCB)  
</p>
 
</td>
|
<td>
Gergely Sipos  
<p>M6.1 Joint training programme for the first project year (With EUDAT, PRACE, CCs, NGIs, UCB)  
 
</p>
|
</td>
ACHIEVED. Document was delivered at the end of May: http://go.egi.eu/trainingplan  
<td>
 
<p>Gergely Sipos  
|-
</p>
!
</td>
5  
<td>
 
<p>Document was delivered at the end of May: http://go.egi.eu/trainingplan  
|
</p>
Task 6.1<span class="Apple-tab-span" style="white-space:pre"> </span>  
</td></tr>
 
<tr>
|
<th>
Setup training VO on the Federated Cloud  
<p>5  
 
</p>
Register training robot certificate, generate proxies for students and trainers  
</th>
 
<td>
Prepare training materials for 3.5 course (slides + hands-on exercises incl. VM images and datasets)&nbsp;  
<p>Task 6.1<span class="Apple-tab-span" style="white-space:pre"> </span>  
 
</p>
Test training material and setup by July 15, deliver courses in second part of July  
</td>
 
<td>
|
<p>Setup training VO on the Federated Cloud  
Deliver two courses on EGI Federated Cloud at 'Software Carpentry workshop' (SAP, UK) and HPCS (Amsterdam)  
</p><p>Register training robot certificate, generate proxies for students and trainers  
 
</p><p>Prepare training materials for 3.5 course (slides + hands-on exercises incl. VM images and datasets)&#160;  
|
</p><p>Test training material and setup by July 15, deliver courses in second part of July  
Gergely Sipos  
</p>
 
</td>
| ACHIEVED.
<td>
|-
<p>Deliver two courses on EGI Federated Cloud at 'Software Carpentry workshop' (SAP, UK) and HPCS (Amsterdam)  
!
</p>
10  
</td>
 
<td>
|
<p>Gergely Sipos  
Task 6.1  
</p>
 
</td>
|
<td>
Work with Resource providers of the training VO to identify suitable business model for continued provisioning of thevirtualised training e-infrastructure that can operate 24/7 to serve EGI-related courses and self-paced training needs.  
</td></tr>
 
<tr>
|
<th>
Suitable business model for continued operation of the training VO in EGI  
<p>10  
 
</p>
|
</th>
Gergely Sipos  
<td>
 
<p>Task 6.1  
|
</p>
Capacity is secured at least until the end of EGI-Engage.
</td>
 
<td>
|-
<p><span style="font-family: Calibri, sans-serif; font-size: 11pt; letter-spacing: 0.1pt; line-height: 115%;">Work with Resource providers of the training VO</span><span style="font-family: Calibri, sans-serif; font-size: 11pt; letter-spacing: 0.1pt; line-height: 115%;">&#160;to identify
!
suitable business model for continued provisioning of thevirtualised training
10  
e-infrastructure that can operate 24/7 to serve EGI-related courses and
 
self-paced training needs.</span>
|
</p>
Task 6.1  
</td>
 
<td>
|
<p>Suitable business model for continued operation of the training VO in EGI  
Prepare module based on the joint use case that has been identified and documented during the EGI-EUDAT meeting at the EGI Conference in Lisbon. (FedCloud, B2Find, B2Drop, B2Safe)  
</p>
 
</td>
|
<td>
Joint training module with EUDAT  
<p>Gergely Sipos  
 
</p>
|
</td>
Diego Scardaci  
<td>
 
<p><br />
|
</p>
<span style="font-size: 13.2799997329712px;">Ongoing, aiming at F2F delivery at the EGI Community Forum</span>  
</td></tr>
 
<tr>
|-
<th>
!
<p>10  
8  
</p>
 
</th>
|
<td>
Task 6.1  
<p>Task 6.1  
 
</p>
|
</td>
After the platform components are integrated and tested develop training for the NGI user support teams and EGI.eu staff on how to support long-tail users with the platform.&nbsp;  
<td>
 
<p><span style="font-family: Calibri, sans-serif; font-size: 14.6666669845581px; letter-spacing: 0.133333340287209px; line-height: 16.8666667938232px;">Prepare module based on the joint use case that has been identified and documented during the EGI-EUDAT meeting at the EGI Conference in Lisbon. (FedCloud, B2Find, B2Drop, B2Safe)</span>
|
</p>
Training module on the 'EGI long tail of science' platform  
</td>
 
<td>
|
<p>Joint training module with EUDAT&#160;
Diego Scardaci, Peter Solagna  
</p>
 
</td>
|
<td>
Ongoing, aiming at F2F delivery at the EGI Community Forum  
<p>Diego Scardaci  
 
</p>
|-
</td>
!
<td>
8  
<p><span style="font-size: 13.2799997329712px;">F2F delivery at the EGI Community Forum?</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&#160;</span>  
 
</p>
|
</td></tr>
Task 6.1  
<tr>
 
<th>
|
<p>8  
<span>A module about security policy, procedures and
</p>
</th>
<td>
<p>Task 6.1  
</p>
</td>
<td>
<p>After the platform components are integrated and tested develop training for the NGI user support teams and EGI.eu staff on how to support long-tail users with the platform.&#160;  
</p>
</td>
<td>
<p>Training module on the 'EGI&#160;long tail of science' platform  
</p>
</td>
<td>
<p>Diego Scardaci, Peter Solagna  
</p>
</td>
<td>
<p>F2F delivery at the EGI Community Forum?
</p>
</td></tr>
<tr>
<th>
<p>8  
</p>
</th>
<td>
<p>Task 6.1  
</p>
</td>
<td>
<p><span>A module about security policy, procedures and
</span> <span>
</span> <span>
interoperability solutions in the various e-infrastructures, with possible involvement
interoperability solutions in the various e-infrastructures, with possible involvement
Line 577: Line 151:
the autumn, then will be shared as a training module in the marketplace.
the autumn, then will be shared as a training module in the marketplace.
</span>  
</span>  
</p><p><br />
 
</p>
<br>  
</td>
 
<td>
|
<p>Joint event and training module with PRACE  
Joint event and training module with PRACE  
</p>
 
</td>
|
<td>
Dave Kelsey  
<p>Dave Kelsey  
 
</p>
|
</td>
Topics to be identified at WISE workshop in Oct.
<td>
 
<p>Event approx in October (date, venue TBD)
|-
</p>
!
</td></tr>
5  
<tr>
 
<th>
|
<p>5  
Task 6.1  
</p>
 
</th>
|
<td>
<span>The module will target those who prepare and those who
<p>Task 6.1  
</p>
</td>
<td>
<p><span>The module will target those who prepare and those who
</span> <span>
</span> <span>
endorse VM images for scientific/training purposes. The module will define the
endorse VM images for scientific/training purposes. The module will define the
characteristics of ‘secure’ VM images, will teach how to prepare such images,
characteristics of ‘secure’ VM images, will teach how to prepare such images,
and will demonstrate how to assess the security characteristics of such images.&#160;
and will demonstrate how to assess the security characteristics of such images.
</span>  
</span>  
</p><p><br />
 
</p>
<br>  
</td>
 
<td>
|
<p><span>Training module on Virtual Machine preparation and certification in the
<span>Training module on Virtual Machine preparation and certification in the
</span> <span>
</span> <span>
EGI Federated Cloud.
EGI Federated Cloud.
</span>  
</span>  
</p><p><br />  
 
</p>
<br>  
</td>
 
<td>
|
<p>Vincenzo<span class="Apple-tab-span" style="white-space:pre"> </span> Spinoso
Vincenzo Spinoso
</p>
 
</td>
|
<td>
<span>TOPIC</span><span style="font-size: 13.28px; line-height: 1.5em;">&nbsp;development is ongoing.&nbsp;</span><span style="line-height: 1.5em; font-size: 13.28px;">To be developed by security experts funded in T6.1: CERN, CESNET, LIP, NIKHEF</span>  
<p><span>To be developed by security experts funded in T6.1:</span>&#160;<span style="font-family: Calibri, sans-serif; font-size: 11pt; letter-spacing: 0.1pt; line-height: 115%;">CERN, CESNET, LIP, NIKHEF</span>  
 
</p>
|-
</td></tr>
!
<tr>
10
<th>
 
<p>10
|
</p>
Task 6.1
</th>
 
<td>
| Define incident handling process - by CSIRT
<p>Task 6.1  
|
</p>
Training module on Incident handling in the EGI Federated Cloud.
</td>
 
<td> Define incident handling process - by CSIRT
|
</td>
Dave Kelsey
<td>
 
<p><span style="line-height: 19.9200000762939px; font-size: 13.2799997329712px;">Training module on&#160;</span><span style="font-family: Calibri, sans-serif; font-size: 11pt; letter-spacing: 0.1pt; line-height: 115%;">Incident handling in the EGI Federated Cloud.&#160;</span>
|
</p>
Topic development ongoing. Training in Bari. To be developed by security experts funded in T6.1: CERN, CESNET, LIP, NIKHEF<br>  
</td>
 
<td>
|-
<p>Dave Kelsey
!
</p>
12<span class="Apple-tab-span" style="white-space:pre"> </span>  
</td>
 
<td>
|
<p><span style="font-size: 11pt; line-height: 16.8666667938232px; font-family: Calibri, sans-serif; letter-spacing: 0.1pt;">To be developed by security experts funded in T6.1:</span><span style="font-size: 13.2799997329712px;">&#160;</span><span style="font-family: Calibri, sans-serif; font-size: 11pt; letter-spacing: 0.1pt; line-height: 16.8666667938232px;">CERN, CESNET, LIP, NIKHEF</span>  
Task 6.1  
</p><p>F2F delivery at EGI Community Forum?
 
</p>
|
</td></tr>
Exploring possibility of training module developments with other tasks on the following topics:
<tr>
 
<th>
#. Open Data Processing solution from EGI (by members of task JRA2.1).  
<p>12<span class="Apple-tab-span" style="white-space:pre"> </span>
#. GPGPU-computing in EGI (by members of task JRA2.4 and NGI-BG).  
</p>
#. Deploying clouds and federated clouds for scientific and educational purposes (by members of the Federated Cloud collaboration).
</th>
#. iRODS training (in collaboration with NGI-FR and the DIRAC team).
<td>
 
<p>Task 6.1
|
</p>
Additional training modules
</td>
 
<td>
|
<p><span style="line-height: 1.5em; text-indent: -18pt; font-size: 13.2799997329712px;">Exploring possibility of training module developments with other tasks on the following topics:</span>
Gergely Sipos
</p><p><span style="line-height: 1.5em; text-indent: -18pt; font-size: 13.2799997329712px;">1. Open Data Processing solution from EGI (by
 
</span>members of task JRA2.1).<br />
|
</p><p><span style="line-height: 1.5em; text-indent: -18pt; font-size: 13.2799997329712px;">2. GPGPU-computing in EGI (by members of task
Waiting for developments to finish.&nbsp;
</span>JRA2.4 and NGI-BG).
 
</p><p>3.&#160;<span style="line-height: 1.5em; text-indent: -18pt; font-size: 13.2799997329712px;">Deploying clouds and federated clouds for
|-
</span>scientific and educational purposes (by members of the Federated Cloud collaboration).  
! 4
</p><p>4.&#160;<span style="line-height: 1.5em; text-indent: -18pt; font-size: 13.2799997329712px;">iRODS training (in collaboration with NGI-FR and
| Task 6.1
</span>the DIRAC team).<br />  
|
</p>
Ensure that the Training Marketplace is used accross EGI, and that it can collect and provide the relevant details about events, content, etc and the impact.  
</td>
 
<td>
Provide templates and surveys for EGI trainers to be able to collect relevant metrics.&nbsp;  
<p>Additional training modules
 
</p>
| Mechanisms and tools to assess impact of training activities.  
</td>
| Gergely Sipos
<td>
| '''<u>TMP seems to be going down. We need to find an alternative.</u>'''
<p>Gergely Sipos
|-
</p>
! 1
</td>
| Task 6.2
<td>
| Definition of the technical use cases support process
<p>F2F delivery at EGI Community Forum?
| Establishment of a procedure for handling use case support, RT queue for tracking use cases
</p>
| Gergely Sypos / Enol Fernandez
</td></tr>
| ACHIEVED.
<tr>
|-
<th> 4
! 12 (15)
</th>
| Task 6.2
<td> Task 6.1
| Finalise use case and requirements document (M6); Selection of technologies potentially matching requirements (M9); Basic tests and feedback (M12); Final tests and feedback (M15)
</td>
| Pilot usage of EGI infrastructure by HBP
<td>
| Lukasz Dutka / Enol Fernandez
<p>Ensure that the Training Marketplace is used accross EGI, and that it can collect and provide the relevant details about events, content, etc and the impact.
| Ongoing (in JRA2)
</p><p>Provide templates and surveys for EGI trainers to be able to collect relevant metrics.&#160;  
|-
</p>
! 12
</td>
| Task 6.2
<td> Mechanisms and tools to assess impact of training activities.
| Arrange collaboration agreement with LOFAR/SKA and possibly other projects from the ASTERICS cluster project; Collect and document e-infrastructure use cases and requirements from the communities; Analyse requirements, propose implementation plan and roadmap
</td>
| Implementation roadmap for LOFAR/SKA
<td> Gergely Sipos
| Tiziana Ferrari / Enol Fernandez
</td>
|
<td>
|-
</td></tr>
! 12
<tr>
| Task 6.3 (ELIXIR)
<th> 12
|
</th>
<span style="font-size: 13.2799997329712px;">Collect use cases from ELIXIR-EXCELERATE, CC members, EGI</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&nbsp;members (e.g. GAPF</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&nbsp;VT),&nbsp;</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">then select the most relevant ones for the CC to work with. Analyse use cases from the technical perspective to capture requirements for e-infra and ELXIR</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&nbsp;RI</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&nbsp;services.&nbsp;</span>  
<td> Task 6.3 (ELIXIR)
 
</td>
<span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">Life science requirements analysis and driver use case(s) with implementation roadmap are agreed</span>  
<td>
 
<p><span style="font-size: 13.2799997329712px;">Collect use cases from ELIXIR-EXCELERATE, CC members, EGI</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&#160;members (e.g. GAPF</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&#160;VT),&#160;</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">then select the most relevant ones for the CC to work with. Analyse use cases from the technical perspective to capture requirements for e-infra and ELXIR</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&#160;RI</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&#160;services.&#160;</span>  
| <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">M6.3:</span>&nbsp;<span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">Life science requirements analysis and driver use case(s) with implementation roadmap are agreed</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">.&nbsp;</span>  
</p><p><span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">Life science requirements analysis and driver use case(s) with implementation roadmap are agreed</span>
| <span style="font-size: 13.2799997329712px;">Tommi Nyronen</span>  
</p>
| Started in October
</td>
|-
<td> <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">M6.3:</span>&#160;<span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">Life science requirements analysis and driver use case(s) with implementation roadmap are agreed</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">.&#160;</span>
! 12
</td>
| Task 6.4 (BBMRI)
<td> <span style="font-size: 13.2799997329712px;">Tommi Nyronen</span>
|
</td>
<span style="font-size: 13.2799997329712px; line-height: 19.9200000762939px;">Collect use cases from the BBMRI</span>&nbsp;community and <span style="font-size: 13.2799997329712px; line-height: 19.9200000762939px;">from CC members</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&nbsp;</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">then select the most relevant ones for the CC to work with. Analyse use cases from the technical perspective to capture requirements for e-infra and BBMRI</span>&nbsp;<span style="font-size: 13.2799997329712px; line-height: 1.5em;">RI</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&nbsp;services. Design suitable technical architecture to address the requirements.&nbsp;</span><br>
<td>
 
</td></tr>
| <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">M6.2:</span>&nbsp;<span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">Security and privacy requirements and secure storage architectural design are agreed</span>  
<tr>
| Petr Holub
<th> 12
| To start in October
</th>
|-
<td> Task 6.4 (BBMRI)
! 7
</td>
| Task 6.5 (MoBrain)
<td>
| Discuss options for the implementation of a fully integrated MoBrain portal (built on N4U and WeNMR technologies, considering work in WestLife VRE project). Reach agreement on the concept of the integrated portal and on CC partners' responsibilty for developing it.
<p><span style="font-size: 13.2799997329712px; line-height: 19.9200000762939px;">Collect use cases from the BBMRI</span>&#160;community and <span style="font-size: 13.2799997329712px; line-height: 19.9200000762939px;">from CC members</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&#160;</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">then select the most relevant ones for the CC to work with. Analyse use cases from the technical perspective to capture requirements for e-infra and BBMRI</span>&#160;<span style="font-size: 13.2799997329712px; line-height: 1.5em;">RI</span><span style="font-size: 13.2799997329712px; line-height: 1.5em;">&#160;services. Design suitable technical architecture to address the requirements.&#160;</span><br />
| <span style="font-size: 13.2799997329712px;">Agreement on the concept of the integrated portal and on CC partners' responsibilty for developing it.</span>  
</p>
| Alexander Bonvin
</td>
| Discussions took place. Suggestion is to postpone D6.4 to see clearer the WestLife plans.
<td> <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">M6.2:</span>&#160;<span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">Security and privacy requirements and secure storage architectural design are agreed</span>
|-
</td>
! 12
<td> Petr Holub
| Task 6.5 (MoBrain)
</td>
|
<td>
| <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">D6.4:</span>&nbsp;<span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">Fully integrated MoBrain web portal (OTHER)</span>  
</td></tr>
| Alexander Bonvin
<tr>
| <u>'''DELAY&nbsp;DELIVERY DATE?'''</u>
<th> 7
|-
</th>
! 11
<td> Task 6.5 (MoBrain)
| Task 6.5 (MoBrain)
</td>
| Learn about the 'Accelerated Computing platform' of EGI&nbsp;(GPGPU facility) at the EGI Community Forum; Perform initial tests on it with GROMACS and AMBER.
<td> Discuss options for the implementation of a fully integrated MoBrain portal (built on N4U and WeNMR technologies, considering work in WestLife VRE project). Reach agreement on the concept of the integrated portal and on CC partners' responsibilty for developing it.
| Initial tests on the 'Accelerated Computing platform' of&nbsp;EGI
</td>
| Alexandre Bonvin, Peter Solagna
<td> <span style="font-size: 13.2799997329712px;">Agreement on the concept of the integrated portal and on CC partners' responsibilty for developing it.</span>
| Depends on progress of Task JRA2.4
</td>
|-
<td> Alexander Bonvin
! 4
</td>
| Task 6.6 (DARIAH)
<td>
|
</td></tr>
Prepare user survey to be used by the CC to collect needs and requirements from digital humanities communities and users.&nbsp;Interview leaders of relevant DARIAH WGs, run the survey in relevant groups
<tr>
 
<th> 12
| User survey and interviews conducted
</th>
| Karolj Skala, Davor Davidovic
<td> Task 6.5 (MoBrain)
| Ongoing. Presentation in Bari.
</td>
|-
<td>
! 9
</td>
| Task 6.6 (DARIAH)&nbsp;
<td> <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">D6.4:</span>&#160;<span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">Fully integrated MoBrain web portal (OTHER)</span>
| Collect and analyse the outcome of the user survey and interviews, feed findings into CC activities (both technical and community related)&nbsp;
</td>
| Analysis of user interview and survey outcome
<td> Alexander Bonvin
| Karolj Skala, Davor Davidovic
</td>
| <span style="font-size: 13.28px;">Ongoing. Presentation in Bari.</span>
<td>
|-
</td></tr>
! 11
<tr>
| Task 6.6 (DARIAH)
<th> 11
| Integrate gLibrary into the DARIAH gateway, Perform tests, Import dataset from the Austrian Academy of Sciences, Provide materials for digital humanities researchers on how to use the data reportisoty.&nbsp;
</th>
| <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">D6.2 Data repository for DARIAH (OTHER)</span>  
<td> Task 6.5 (MoBrain)
| Roberto Barbera
</td>
| Ongoing.
<td> Learn about the 'Accelerated Computing platform' of EGI&#160;(GPGPU facility) at the EGI Community Forum; Perform initial tests on it with GROMACS and AMBER.
|-
</td>
! 12
<td> Initial tests on the 'Accelerated Computing platform' of&#160;EGI
| Task 6.6 (DARIAH)
</td>
| Decide about the best approach to integrate the application with EGI platforms and with the DARIAH gateway services. Implement the integration.&nbsp;  
<td> Alexandre Bonvin, Peter Solagna
| <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">D6.5 Final version of Multi-Source Distributed Real-Time Search and Information Retrieval application (OTHER)</span>  
</td>
| Tibor Kalman
<td> Depends on progress of Task JRA2.4
| Ongoing. '''<u>Status to check</u>'''
</td></tr>
|-
<tr>
! 9
<th> 4
| Task 6.7 (LifeWatch)
</th>
| Develop tools for analysing input from citizens (e.g. pictures)
<td> Task 6.6 (DARIAH)
| <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);"> D6.1 Assisted pattern recognition tools integrated with EGI for citizen science (OTHER)</span>  
</td>
| Jesús Marco
<td>
| Ongoing.
<p>Prepare user survey to be used by the CC to collect needs and requirements from digital humanities communities and users.&#160;Interview leaders of relevant DARIAH WGs, run the survey in relevant groups
|-
</p>
! 12
</td>
| Task 6.7 (LifeWatch)
<td> User survey and interviews conducted
| Provide access to R and related analysis tools in Virtual Machines for the processing of data from Ecological Observatories
</td>
| <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);"> Data flow handler and basic R tools to integrate and process data from Ecological Observatories on EGI (DEM)</span>  
<td> Karolj Skala, Davor Davidovic
| Jesús Marco
</td>
| Ongoing.
<td>
|-
</td></tr>
! 2
<tr>
| Task 6.8 (EISCAT)
<th> 9
| Scope the investigation plan, and get each party agree on the task force. Set up weekly meeting for discussion and progress monitoring.
</th>
| Reach agreement on task responsibilities of participating parties
<td> Task 6.6 (DARIAH)&#160;
| Yin Chen (EGI)
</td>
| Agreement was achieved by May
<td> Collect and analyse the outcome of the user survey and interviews, feed findings into CC activities (both technical and community related)&#160;
|-
</td>
! 6
<td> Analysis of user interview and survey outcome
| Task 6.8 (EISCAT)
</td>
| Identify priority development components, draft the first version of Portal Design Specification<br>  
<td> Karolj Skala, Davor Davidovic
| First version of the portal design specification to be delivered <br>  
</td>
| Ingemar Haggstrom(EISCAT)/Yin Chen(EGI) <br>  
<td>
| '''<u style="font-weight: bold;">SLOW. WIL</u>L <u>RESULT&nbsp;<span style="font-size: 13.28px; line-height: 1.5em;">LATE D6.3.</span></u>'''
</td></tr>
|-
<tr>
! 6
<th> 11
| Task 6.8 (EISCAT)
</th>
| Present the first version of design specification to EISCAT community and get feedback and approval<br>  
<td> Task 6.6 (DARIAH)
| Present the first version of the design specification to EISCAT community, and get feedback and approval.<br>  
</td>
| Ingemar Haggstrom(EISCAT)/Yin Chen(EGI) <br>  
<td> Integrate gLibrary into the DARIAH gateway, Perform tests, Import dataset from the Austrian Academy of Sciences, Provide materials for digital humanities researchers on how to use the data reportisoty.&#160;
| Achieved.<br>
</td>
|-
<td> <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">D6.2 Data repository for DARIAH (OTHER)</span>
! 10
</td>
| Task 6.8 (EISCAT)  
<td> Roberto Barbera
| Develop the portal prototype based on the first version of the design specification.<br>  
</td>
| Portal prototype to be delivered<br>  
<td>
| Ake Sandgren(SNIC)<br>  
</td></tr>
| Depends on specification
<tr>
|-
<th> 12
! 12  
</th>
| Task 6.8 (EISCAT)  
<td> Task 6.6 (DARIAH)
| Based on the feedback from EISCAT community, identify priority development areas. Refine the first version of the design specification, adding new functional elements and to draft the second version of the design specification. Present the second version of design specification to EISCAT community and get feedback<br>  
</td>
| Second version of the portal design specification to be delivered, feedback to be obtained from EISCAT community<br>
<td> Decide about the best approach to integrate the application with EGI platforms and with the DARIAH gateway services. Implement the integration.&#160;
| Ingemar Haggstrom(EISCAT)/Yin Chen(EGI) <br>
</td>
| <span style="font-size: 13.28px;">Depends on specification</span>
<td> <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">D6.5 Final version of Multi-Source Distributed Real-Time Search and Information Retrieval application (OTHER)</span>
|-
</td>
! 12
<td> Tibor Kalman
| Task 6.8 (EISCAT)
</td>
| Deliver the Portal prototype, and identify a few EISCAT users to test it. <br>  
<td>
| Present the protal EISCAT community, and get feedback.<br>  
</td></tr>
| Ake Sandgren(SNIC)<br>  
<tr>
| <span style="font-size: 13.28px;">Depends on specification</span>
<th> 6
|-
</th>
! 12
<td> Task 6.10 (DM CC)
| Task 6.9 (EPOS)  
</td>
| EPOS requirements analysis and outline of pilot use cases are agreed<br>  
<td> Collect details about the use cases from each CC member. This should cover: Details of the disaster event(s) to be simulated/predicted; details on required data; details on simulation applications, tool and gateways to interact with the data; necessary visualisation tools; implementation roadmap and timeline
|
</td>
*AAI requirements analysed and the EPOS AAI architecture envisaged.
<td> Integrated information about the use cases that the CC members will work with
*Basic multidisciplinary AAI use case defined: it deals with the discovery of heterogeneous data from the ICS-C portal
</td>
*An extended, single discipline, computational oriented use case defined<br>
<td> Simon Lin, Eric Yen
 
</td>
| Daniele Balio (EPOS/INGV), Diego Scardaci (EGI.eu/INFN)<br>  
<td>
| Achieved.
</td></tr>
|-
<tr>
! 6
<th> 6
| Task 6.10 (DM CC)
</th>
| Collect details about the use cases from each CC member. This should cover: Details of the disaster event(s) to be simulated/predicted; details on required data; details on simulation applications, tool and gateways to interact with the data; necessary visualisation tools; implementation roadmap and timeline
<td> Task 6.10 (DM CC)
| Integrated information about the use cases that the CC members will work with
</td>
| Simon Lin, Eric Yen
<td> Planning participation and contributions to the 40th APAN meeting
| <u>'''SLOW.'''</u>
</td>
|-
<td> <span style="font-size: 13.2799997329712px; line-height: 19.9200000762939px;">Contributions and meeting at the 40th APAN meeting (</span><span>&lt;a href="http://www.apan.net/meetings/KualaLumpur2015/"&gt;http://www.apan.net/meetings/KualaLumpur2015/&lt;/a&gt;)</span>
! 6
</td>
| Task 6.10 (DM CC)
<td> <span style="font-size: 13.2799997329712px;">Simon Lin, Eric Yen</span>
| Planning participation and contributions to the 40th APAN meeting
</td>
| <span style="font-size: 13.2799997329712px; line-height: 19.9200000762939px;">Contributions and meeting at the 40th APAN meeting (</span><span>&lt;a href="http://www.apan.net/meetings/KualaLumpur2015/"&gt;http://www.apan.net/meetings/KualaLumpur2015/&lt;/a&gt;)</span>  
<td>
| <span style="font-size: 13.2799997329712px;">Simon Lin, Eric Yen</span>  
</td></tr>
| Achieved.
<tr>
|-
<th> 8
! 8
</th>
| Task 6.10 (DM CC)
<td> Task 6.10 (DM CC)
| <br>  
</td>
| <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">Specification of the web portals for tsunami wave propagation simulations and for WRF-based weather simulation</span>  
<td> <br />
| <span style="font-size: 13.2799997329712px;">Simon Lin, Eric Yen</span>
</td>
| <u>'''???&nbsp;'''</u>The portals will be implemented and delivered as D6.9 in M14.
<td> <span style="font-size: 12.8000001907349px; line-height: 19.2000007629395px; background-color: rgb(249, 249, 249);">Specification of the web portals for tsunami wave propagation simulations and for WRF-based weather simulation</span>
|}
</td>
 
<td> <span style="font-size: 13.2799997329712px;">Simon Lin, Eric Yen</span>
<br>
</td>
<td> The portals will be implemented and delivered as D6.9 in M14.
</td></tr></table>
<p><br />
</p>

Latest revision as of 10:52, 14 October 2015

This page is providing yearly activity plan for WP6 in PY1:

  • TASK SA2.1 Training
  • TASK SA2.2 Technical User Support
  • TASK SA2.3 ELIXIR (start in M6)
  • TASK SA2.4 BBMRI (start in M7)
  • TASK SA2.5 MoBrain
  • TASK SA2.6 DARIAH
  • TASK SA2.7 LifeWatch
  • TASK SA2.8 EISCAT_3D
  • TASK SA2.9 EPOS
  • TASK SA2.10 Disaster Mitigation




Project month

Project Tasks

Work to be done

Goal 

(measurable)

Owner

(reponsible person)

Comments

3

Task 6.1

Define EGI's training plan for the 1st year of EGI-Engage

M6.1 Joint training programme for the first project year (With EUDAT, PRACE, CCs, NGIs, UCB)

Gergely Sipos

ACHIEVED. Document was delivered at the end of May: http://go.egi.eu/trainingplan

5

Task 6.1

Setup training VO on the Federated Cloud

Register training robot certificate, generate proxies for students and trainers

Prepare training materials for 3.5 course (slides + hands-on exercises incl. VM images and datasets) 

Test training material and setup by July 15, deliver courses in second part of July

Deliver two courses on EGI Federated Cloud at 'Software Carpentry workshop' (SAP, UK) and HPCS (Amsterdam)

Gergely Sipos

ACHIEVED.

10

Task 6.1

Work with Resource providers of the training VO to identify suitable business model for continued provisioning of thevirtualised training e-infrastructure that can operate 24/7 to serve EGI-related courses and self-paced training needs.

Suitable business model for continued operation of the training VO in EGI

Gergely Sipos

Capacity is secured at least until the end of EGI-Engage.

10

Task 6.1

Prepare module based on the joint use case that has been identified and documented during the EGI-EUDAT meeting at the EGI Conference in Lisbon. (FedCloud, B2Find, B2Drop, B2Safe)

Joint training module with EUDAT

Diego Scardaci

Ongoing, aiming at F2F delivery at the EGI Community Forum

8

Task 6.1

After the platform components are integrated and tested develop training for the NGI user support teams and EGI.eu staff on how to support long-tail users with the platform. 

Training module on the 'EGI long tail of science' platform

Diego Scardaci, Peter Solagna

Ongoing, aiming at F2F delivery at the EGI Community Forum

8

Task 6.1

A module about security policy, procedures and interoperability solutions in the various e-infrastructures, with possible involvement of EUDAT. The content will be developed for a joint event that will be held in the autumn, then will be shared as a training module in the marketplace.


Joint event and training module with PRACE

Dave Kelsey

Topics to be identified at WISE workshop in Oct.

5

Task 6.1

The module will target those who prepare and those who endorse VM images for scientific/training purposes. The module will define the characteristics of ‘secure’ VM images, will teach how to prepare such images, and will demonstrate how to assess the security characteristics of such images.


Training module on Virtual Machine preparation and certification in the EGI Federated Cloud.


Vincenzo Spinoso

TOPIC development is ongoing. To be developed by security experts funded in T6.1: CERN, CESNET, LIP, NIKHEF

10

Task 6.1

Define incident handling process - by CSIRT

Training module on Incident handling in the EGI Federated Cloud.

Dave Kelsey

Topic development ongoing. Training in Bari. To be developed by security experts funded in T6.1: CERN, CESNET, LIP, NIKHEF

12

Task 6.1

Exploring possibility of training module developments with other tasks on the following topics:

  1. . Open Data Processing solution from EGI (by members of task JRA2.1).
  2. . GPGPU-computing in EGI (by members of task JRA2.4 and NGI-BG).
  3. . Deploying clouds and federated clouds for scientific and educational purposes (by members of the Federated Cloud collaboration).
  4. . iRODS training (in collaboration with NGI-FR and the DIRAC team).

Additional training modules

Gergely Sipos

Waiting for developments to finish. 

4 Task 6.1

Ensure that the Training Marketplace is used accross EGI, and that it can collect and provide the relevant details about events, content, etc and the impact.

Provide templates and surveys for EGI trainers to be able to collect relevant metrics. 

Mechanisms and tools to assess impact of training activities. Gergely Sipos TMP seems to be going down. We need to find an alternative.
1 Task 6.2 Definition of the technical use cases support process Establishment of a procedure for handling use case support, RT queue for tracking use cases Gergely Sypos / Enol Fernandez ACHIEVED.
12 (15) Task 6.2 Finalise use case and requirements document (M6); Selection of technologies potentially matching requirements (M9); Basic tests and feedback (M12); Final tests and feedback (M15) Pilot usage of EGI infrastructure by HBP Lukasz Dutka / Enol Fernandez Ongoing (in JRA2)
12 Task 6.2 Arrange collaboration agreement with LOFAR/SKA and possibly other projects from the ASTERICS cluster project; Collect and document e-infrastructure use cases and requirements from the communities; Analyse requirements, propose implementation plan and roadmap Implementation roadmap for LOFAR/SKA Tiziana Ferrari / Enol Fernandez
12 Task 6.3 (ELIXIR)

Collect use cases from ELIXIR-EXCELERATE, CC members, EGI members (e.g. GAPF VT), then select the most relevant ones for the CC to work with. Analyse use cases from the technical perspective to capture requirements for e-infra and ELXIR RI services. 

Life science requirements analysis and driver use case(s) with implementation roadmap are agreed

M6.3: Life science requirements analysis and driver use case(s) with implementation roadmap are agreed Tommi Nyronen Started in October
12 Task 6.4 (BBMRI)

Collect use cases from the BBMRI community and from CC members then select the most relevant ones for the CC to work with. Analyse use cases from the technical perspective to capture requirements for e-infra and BBMRI RI services. Design suitable technical architecture to address the requirements. 

M6.2: Security and privacy requirements and secure storage architectural design are agreed Petr Holub To start in October
7 Task 6.5 (MoBrain) Discuss options for the implementation of a fully integrated MoBrain portal (built on N4U and WeNMR technologies, considering work in WestLife VRE project). Reach agreement on the concept of the integrated portal and on CC partners' responsibilty for developing it. Agreement on the concept of the integrated portal and on CC partners' responsibilty for developing it. Alexander Bonvin Discussions took place. Suggestion is to postpone D6.4 to see clearer the WestLife plans.
12 Task 6.5 (MoBrain) D6.4: Fully integrated MoBrain web portal (OTHER) Alexander Bonvin DELAY DELIVERY DATE?
11 Task 6.5 (MoBrain) Learn about the 'Accelerated Computing platform' of EGI (GPGPU facility) at the EGI Community Forum; Perform initial tests on it with GROMACS and AMBER. Initial tests on the 'Accelerated Computing platform' of EGI Alexandre Bonvin, Peter Solagna Depends on progress of Task JRA2.4
4 Task 6.6 (DARIAH)

Prepare user survey to be used by the CC to collect needs and requirements from digital humanities communities and users. Interview leaders of relevant DARIAH WGs, run the survey in relevant groups

User survey and interviews conducted Karolj Skala, Davor Davidovic Ongoing. Presentation in Bari.
9 Task 6.6 (DARIAH)  Collect and analyse the outcome of the user survey and interviews, feed findings into CC activities (both technical and community related)  Analysis of user interview and survey outcome Karolj Skala, Davor Davidovic Ongoing. Presentation in Bari.
11 Task 6.6 (DARIAH) Integrate gLibrary into the DARIAH gateway, Perform tests, Import dataset from the Austrian Academy of Sciences, Provide materials for digital humanities researchers on how to use the data reportisoty.  D6.2 Data repository for DARIAH (OTHER) Roberto Barbera Ongoing.
12 Task 6.6 (DARIAH) Decide about the best approach to integrate the application with EGI platforms and with the DARIAH gateway services. Implement the integration.  D6.5 Final version of Multi-Source Distributed Real-Time Search and Information Retrieval application (OTHER) Tibor Kalman Ongoing. Status to check
9 Task 6.7 (LifeWatch) Develop tools for analysing input from citizens (e.g. pictures) D6.1 Assisted pattern recognition tools integrated with EGI for citizen science (OTHER) Jesús Marco Ongoing.
12 Task 6.7 (LifeWatch) Provide access to R and related analysis tools in Virtual Machines for the processing of data from Ecological Observatories Data flow handler and basic R tools to integrate and process data from Ecological Observatories on EGI (DEM) Jesús Marco Ongoing.
2 Task 6.8 (EISCAT) Scope the investigation plan, and get each party agree on the task force. Set up weekly meeting for discussion and progress monitoring. Reach agreement on task responsibilities of participating parties Yin Chen (EGI) Agreement was achieved by May
6 Task 6.8 (EISCAT) Identify priority development components, draft the first version of Portal Design Specification
First version of the portal design specification to be delivered
Ingemar Haggstrom(EISCAT)/Yin Chen(EGI)
SLOW. WILL RESULT LATE D6.3.
6 Task 6.8 (EISCAT) Present the first version of design specification to EISCAT community and get feedback and approval
Present the first version of the design specification to EISCAT community, and get feedback and approval.
Ingemar Haggstrom(EISCAT)/Yin Chen(EGI)
Achieved.
10 Task 6.8 (EISCAT) Develop the portal prototype based on the first version of the design specification.
Portal prototype to be delivered
Ake Sandgren(SNIC)
Depends on specification
12 Task 6.8 (EISCAT) Based on the feedback from EISCAT community, identify priority development areas. Refine the first version of the design specification, adding new functional elements and to draft the second version of the design specification. Present the second version of design specification to EISCAT community and get feedback
Second version of the portal design specification to be delivered, feedback to be obtained from EISCAT community
Ingemar Haggstrom(EISCAT)/Yin Chen(EGI)
Depends on specification
12 Task 6.8 (EISCAT) Deliver the Portal prototype, and identify a few EISCAT users to test it.
Present the protal EISCAT community, and get feedback.
Ake Sandgren(SNIC)
Depends on specification
12 Task 6.9 (EPOS) EPOS requirements analysis and outline of pilot use cases are agreed
  • AAI requirements analysed and the EPOS AAI architecture envisaged.
  • Basic multidisciplinary AAI use case defined: it deals with the discovery of heterogeneous data from the ICS-C portal
  • An extended, single discipline, computational oriented use case defined
Daniele Balio (EPOS/INGV), Diego Scardaci (EGI.eu/INFN)
Achieved.
6 Task 6.10 (DM CC) Collect details about the use cases from each CC member. This should cover: Details of the disaster event(s) to be simulated/predicted; details on required data; details on simulation applications, tool and gateways to interact with the data; necessary visualisation tools; implementation roadmap and timeline Integrated information about the use cases that the CC members will work with Simon Lin, Eric Yen SLOW.
6 Task 6.10 (DM CC) Planning participation and contributions to the 40th APAN meeting Contributions and meeting at the 40th APAN meeting (<a href="http://www.apan.net/meetings/KualaLumpur2015/">http://www.apan.net/meetings/KualaLumpur2015/</a>) Simon Lin, Eric Yen Achieved.
8 Task 6.10 (DM CC)
Specification of the web portals for tsunami wave propagation simulations and for WRF-based weather simulation Simon Lin, Eric Yen ??? The portals will be implemented and delivered as D6.9 in M14.