Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-Engage:WP4-PY2-Roadmap"

From EGIWiki
Jump to navigation Jump to search
Line 74: Line 74:
|  
|  
| Task 4.1  
| Task 4.1  
| Open Data Platform First Prototype
| Open Data Platform First Prototype (D4.7)
| ODP ready launched and ready for early adopters  
| ODP ready launched and ready for early adopters  
| L Dutka
| L Dutka
Line 82: Line 82:
| Mar '17
| Mar '17
| Task 4.3  
| Task 4.3  
| Cross-infrastructure case studies report   
| Cross-infrastructure case studies report (D4.8)    
| Conclusion of EGI-EUDAT integration activities with a comprehensive report on all cross-infrastructure case studies undertaken following the call in PM15  
| Conclusion of EGI-EUDAT integration activities with a comprehensive report on all cross-infrastructure case studies undertaken following the call in PM15  
| E Fernandez
| E Fernandez
Line 90: Line 90:
| Aug '17
| Aug '17
| Task 4.1  
| Task 4.1  
| Open Data Platform: Demonstrator, Experience Report and Use Cases   
| Open Data Platform: Demonstrator, Experience Report and Use Cases (D4.9)    
| Demonstrator of the final version of prototype deployed on the selected pilot sites and an experience report based on the 6 months of evolution of ODG prototype since the first prototype was delivered  
| Demonstrator of the final version of prototype deployed on the selected pilot sites and an experience report based on the 6 months of evolution of ODG prototype since the first prototype was delivered  
| L Dutka
| L Dutka

Revision as of 09:27, 22 June 2016

EGI-Engage project: Main page WP1(NA1) WP3(JRA1) WP5(SA1) PMB Deliverables and Milestones Quality Plan Risk Plan Data Plan
Roles and
responsibilities
WP2(NA2) WP4(JRA2) WP6(SA2) AMB Software and services Metrics Project Office Procedures




This page is providing yearly activity plan for WP4 in PY2, giving an internal breakdown of anticipated work per month. Please also refer to the list of (external) deliverables and milestones: https://wiki.egi.eu/wiki/EGI-Engage:Deliverables_and_Milestones


Project month

Calendar month

Project Tasks

Work to be done

Goal 

(measurable)

Owner

(reponsible person)

Comments
16 Jul '16 Sample task Sample work Sample goal Sample owner Sample comment
17 Aug '16 Task 4.1 Fulfilment of ODP REQ1 Open research data is able to be published on the ODP L Dutka This will be made possible by snapshot creation functionality
17 Task 4.1 Fulfilment of ODP REQ4 Integration of the open data access data management on ODP from community portals L Dutka This will be made possible by using REST interface ODP will provide for open data as well as Onedata CDMI interface
18 Sep '16 Task 4.1 Fulfilment of ODP REQ5 Data identification, linking and citation on ODP L Dutka
20 Nov '16 Task 4.1 Fulfilment of ODP REQ9 Data provenance functionality on ODP L Dutka Basic provenance will provide the means to track information about the data origins and evolution
20 Task 4.1 Open Data Platform First Prototype (D4.7) ODP ready launched and ready for early adopters L Dutka
24 Mar '17 Task 4.3 Cross-infrastructure case studies report (D4.8) Conclusion of EGI-EUDAT integration activities with a comprehensive report on all cross-infrastructure case studies undertaken following the call in PM15 E Fernandez
29 Aug '17 Task 4.1 Open Data Platform: Demonstrator, Experience Report and Use Cases (D4.9) Demonstrator of the final version of prototype deployed on the selected pilot sites and an experience report based on the 6 months of evolution of ODG prototype since the first prototype was delivered L Dutka
30 Sep '17 Task 4.3 Final CANFAR integration release (D4.10) Demonstrator giving evidence to the successful work undertaken in this task E Fernandez