Line 54: Line 54:
| Task 4.2<br>  
| Task 4.2<br>  
|  
|  
JRA activities presentation and collection of requirement.  
JRA activities presentation and collection of requirements.  


Review of OCCI 1.1 status and plans for OCCI 1.2.
Review of OCCI 1.1 status and plans for OCCI 1.2.


|  
|  
Discussion at IaaS session at EGI Conference
Discussion at IaaS session at EGI Conference  


WorPlan and ETA&nbsp;for complete OCCI 1.1 support<br>
Workplan and ETA&nbsp;for complete OCCI 1.1 support<br>  


| A. Lopez<br>  
| A. Lopez<br>  
Line 85: Line 85:
|-
|-
! 5  
! 5  
| <br>
| <br>  
| <br>
| <br>  
| <br>
| <br>  
| <br>
| <br>  
| <br>
| <br>
|-
|-
! 6<br>
! 6<br>  
| <br>
| <br>  
| <br>
| <br>  
| <br>
| <br>  
| <br>
| <br>  
| <br>
| <br>
|-
|-
Line 101: Line 101:
| Task 4.2<br>  
| Task 4.2<br>  
|  
|  
Draft design of OCCI extension for creating snapshots
Draft design of OCCI extension for creating snapshots  


Draft design of OCCI extension for resizing running VMs
Draft design of OCCI extension for resizing running VMs  


| Internal drafts of OCCI extension<br>  
| Internal drafts of OCCI extension<br>  
Line 131: Line 131:
| <br>
| <br>
|-
|-
! 7<br>
! 7<br>  
| Task 4.2<br>
| Task 4.2<br>  
|  
|  
Draft of the design for VM relocation within sites.
Draft of the design for VM relocation within sites.  


AppDB design.
AppDB design.  


|  
|  
Internal draft for discussion.
Internal draft for discussion.  


Proposed AppDB changes
Proposed AppDB changes and new functionality roadmap.<br>


| A. Lopez
| A. Lopez  
| <br>
| <br>
|-
|-
Line 164: Line 164:
| <br>
| <br>
|-
|-
! 9<br>
! 9<br>  
| <br>
| <br>  
| <br>
| <br>  
| <br>
| <br>  
| <br>
| <br>  
| <br>
| <br>
|-
|-
Line 176: Line 176:
Final design of OCCI extension for creating snapshots.  
Final design of OCCI extension for creating snapshots.  


Final design of OCCI extension for resizing running VMs.
Final design of OCCI extension for resizing running VMs.  


Candidate version of the design for VM relocation within sites.
Candidate version of the design for VM relocation within sites.  


|  
|  
Deliverable 4.2 (snapshots)<br>
Deliverable 4.2 (snapshots)<br>  


Deliverable 4.4 (snapshtos)<br>
Deliverable 4.4 (snapshtos)<br>  


Candidate document for final review (relocation)<br>
Candidate document for final review (relocation)<br>  


| A. Lopez<br>  
| A. Lopez<br>  
Line 215: Line 215:
| <br>
| <br>
|-
|-
! 12<br>
! 12<br>  
| Task 4.2<br>
| Task 4.2<br>  
|  
|  
Initial implementation of OCCI extensions.
Initial implementation of OCCI extensions.  


Final design of interactions to relocate running VMs within sites.
Final design of interactions to relocate running VMs within sites.  


|  
|  
OCCI support for resizing and/or snapshots
OCCI support for resizing and/or snapshots  


Deliverable 4.4
Deliverable 4.4  


| A. Lopez<br>
| A. Lopez<br>  
| <br>
| <br>
|-
|-

Revision as of 10:40, 29 April 2015

EGI-Engage project: Main page WP1(NA1) WP3(JRA1) WP5(SA1) PMB Deliverables and Milestones Quality Plan Risk Plan Data Plan
Roles and
responsibilities
WP2(NA2) WP4(JRA2) WP6(SA2) AMB Software and services Metrics Project Office Procedures




This page is providing yearly activity plan for WP4 in PY1


Project month

Project Tasks

Work to be done

Goal 

(measurable)

Owner

(reponsible person)

Comments
1 All WP4 tasks Collection of people names and population of mailing lists Communications in place T. Ferrari COMPLETE
2 Task 4.2 Survey on OCCI suport request for other CMFs Definition of OCCI support roadmap A. Lopez Survey created sent to involved parties
2 Task 4.4 Review of available technologies for using GPUs in grid and cloud  

Resume of EGI-Inspire GPGPU VT

Kick-off and GPGPU VT handover meeting
M.Verlato

3
Task 4.2

JRA activities presentation and collection of requirements.

Review of OCCI 1.1 status and plans for OCCI 1.2.

Discussion at IaaS session at EGI Conference

Workplan and ETA for complete OCCI 1.1 support

A. Lopez
OCCI Implementation status: https://wiki.egi.eu/wiki/Fedcloud-tf:WorkGroups:Scenario1#Servers
3 Task 4.4
Review of available technologies for using GPUs in grid and cloud  

Analysis of requirements from user communities

Discussion at GPGPU session at EGI Conference
M.Verlato

4 Task 4.4
End of review of available technologies for using GPUs in grid and cloud  

End of analysis of requirements from user communities

Technical report (to be included in Milestone 1.2 First intermediate report) and wiki pages
M.Verlato

5




6





6 Task 4.2

Draft design of OCCI extension for creating snapshots

Draft design of OCCI extension for resizing running VMs

Internal drafts of OCCI extension
A. Lopez

6 Task 4.3

Collection of technical requirements for the integration of the D4SCIENCE and CANFAR cloud infrastructures

Definition of "user stories" for interoperation with EUDAT, revision of AAI roadmaps and discussion of their interoperability

Cookbooks for EGI-EUDAT service interoperation

D4SCIENCE and CANFAR integration roadmap

E. Fernandez
7




7
Task 4.2

Draft of the design for VM relocation within sites.

AppDB design.

Internal draft for discussion.

Proposed AppDB changes and new functionality roadmap.

A. Lopez
7 Task 4.4
Modification/configuration at site level (OS driver, hypervisor, CMF, VM images) for supporting GPUs in cloud  

Definition of abstract GPU-related CREAM JDL attributes to be mapped in the supported batch systems

Cloud site with working GPU and installation manual  

Update of the CREAM JDL specification document

M.Verlato

8




9





9 Task 4.2

Final design of OCCI extension for creating snapshots.

Final design of OCCI extension for resizing running VMs.

Candidate version of the design for VM relocation within sites.

Deliverable 4.2 (snapshots)

Deliverable 4.4 (snapshtos)

Candidate document for final review (relocation)

A. Lopez

10




10 Task 4.4
First step of integration with FedCloud (AppDB, accounting, brokering, ...)  

First implementation of GPU support in CREAM

Tools and configuration manual, possible some demonstration  

GPU-enabled CREAM prototype released for testing

M.Verlato

11




12
Task 4.2

Initial implementation of OCCI extensions.

Final design of interactions to relocate running VMs within sites.

OCCI support for resizing and/or snapshots

Deliverable 4.4

A. Lopez

12 Task 4.4
Revision of available technologies, further improvement and extension of supporting GPUs in FedCloud  

End of testing of GPU-enabled CREAM prototype and feedback collection

Technical report contributing to Project Periodic Report (first period)  

Official final CREAM release with full GPU support

M.Verlato