Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-Engage:AMB-2017-04-06"

From EGIWiki
Jump to navigation Jump to search
Line 86: Line 86:


[[EGI-Engage:Dissemination|Dissemination reports]]  
[[EGI-Engage:Dissemination|Dissemination reports]]  
* Gergely is finalising D6.20 (DMCC)


=== Milestones & Deliverables  ===
=== Milestones & Deliverables  ===


=== Task SA2.1 Training  ===
=== Task SA2.1 Training  ===
Preparation for the following events:
* RDA-ENVRIplus summer school --> 1 day on data processing with Beaker Notebooks, Helsinki, 12-16/6 2017
* EUDAT Summer School, EGI FedCloud theme, FORTH, Heraklion, Crete, Greece, 3-7/7/2017
* CODATA-RDA Research Data Science Summer School: http://indico.ictp.it/event/7974 (Contribute with a FedCloud tutorial), Trieste, 10-21/July/2017
* TBC: Summer School in Lecce on Semantic Theme


=== Task SA2.2 Technical User Support  ===
=== Task SA2.2 Technical User Support  ===
* Preparation for Community Application Support workshop (Catania)


=== Task SA2.3 ELIXIR  ===
=== Task SA2.3 ELIXIR  ===
Line 115: Line 122:


=== Task SA2.10 Disaster Mitigation  ===
=== Task SA2.10 Disaster Mitigation  ===
* Preparation of expanded CC for EINFRA12 - broader country coverage; broader disaster type coverage


<br>
<br>


[[Category:EGI-Engage]]
[[Category:EGI-Engage]]

Revision as of 08:31, 6 April 2017

EGI-Engage project: Main page WP1(NA1) WP3(JRA1) WP5(SA1) PMB Deliverables and Milestones Quality Plan Risk Plan Data Plan
Roles and
responsibilities
WP2(NA2) WP4(JRA2) WP6(SA2) AMB Software and services Metrics Project Office Procedures



Activity Reports

WP1 (NA1) (Yannick Legre)

Dissemination reports

Milestones & Deliverables

Task NA1.1 Administrative and Financial Management

Task NA1.2 Technical Management

Task NA1.3 Quality and Risk Management


WP2 (NA2) (Sergio Andreozzi)

Dissemination reports

Milestones & Deliverables

Task NA2.1 Communication and Dissemination

Task NA2.2 Strategy, Business Development and Exploitation

Task NA2.3 SME/Industry Engagement and Big Data Value Chain

WP3 (JRA1) (Diego Scardaci)

Dissemination reports

Milestones & Deliverables

Task JRA1.1 Authentication and Authorisation Infrastructure

Task JRA1.2 Service Registry and Marketplace

Task JRA1.3 Accounting

Task JRA1.4 Operations Tools

Task JRA1.5 Resource Allocation – e-GRANT

WP4 (JRA2) (Matthew Viljoen)

Dissemination reports

Milestones & Deliverables

Task JRA2.1 Federated Open Data

  • Still awaiting rc12 upgrade from Cyfronet
  • Interest from Chipster community to test EGI DataHub

Task JRA2.2 Federated Cloud

  • OCI update to OCCI 1.2 now finished and ready for CMD
  • cASO build for Centos7 now finished and ready for distribution via the CMD
  • cloud-info-provider development ongoing
  • cloudkeeper development on track

Task JRA2.3 e-Infrastructures Integration

  • EPOS - progress has been made with gGUSE/Fedcloud integration. VM can be started/stopped, but problems remain sending commands. gGUSE developers are involved. For DM, gsiftp is currently being used with EUDAT iRODS; working on using B2STAGE API.
  • ICOS still waiting for rc12
  • iMarine SLA review on 24 Apr

Task JRA2.4 Accelerated Computing

  • rOCCI server being modified to allow for GPGPU support on OpenNebula
  • Ongoing work with APEL team for accounting GPGPU usage
  • Testing of LXD hypervisor shows GPGPU support is very good, but missing with OpenStack Nova. Approx 6PM would be required for development and testing according to Viet.

WP5 (SA1) (Peter Solagna)

Dissemination reports

Milestones & Deliverables

Task SA1.1 Operations Coordination

Task SA1.2 Development of Security Operations

Task SA1.3 Integration, Deployment of Grid and Cloud Platforms

WP6 (SA2) (Gergely Sipos)

Dissemination reports

  • Gergely is finalising D6.20 (DMCC)

Milestones & Deliverables

Task SA2.1 Training

Preparation for the following events:

  • RDA-ENVRIplus summer school --> 1 day on data processing with Beaker Notebooks, Helsinki, 12-16/6 2017
  • EUDAT Summer School, EGI FedCloud theme, FORTH, Heraklion, Crete, Greece, 3-7/7/2017
  • CODATA-RDA Research Data Science Summer School: http://indico.ictp.it/event/7974 (Contribute with a FedCloud tutorial), Trieste, 10-21/July/2017
  • TBC: Summer School in Lecce on Semantic Theme

Task SA2.2 Technical User Support

  • Preparation for Community Application Support workshop (Catania)

Task SA2.3 ELIXIR

  • A flash talk about running Marine Metagenomics pipeline in EGI Federated Cloud (ELIXIR CC use case) was given in the Elixir All-Hands meeting in Rome (March 21st).
  • First version of PenoMeNal cloud gateway was released. Terraform based implementation is tested at the EBI FedCloud site.

Task SA2.4 BBMRI

Task SA2.5 MoBrain

Task SA2.6 DARIAH

  • Preparing presentation for the DARIAH Annual meeting
  • Continuation of the dissemination activities: two presentation accepted for DPASSH2017 [1] and Methods in Dialectology XVI [2]

Task SA2.7 LifeWatch

Task SA2.8 EISCAT_3D

Victor Mendez left UAB, and Andrei Tsaregorodtsev of CPPM will do the debugging of the Dirac portal. This means that there will not be much development for the rest of the project. The RT system is used to raise these debug requests and that works well.

CSC is investigating how to add a more heavy EISCAT processing using a c-library doing lagprofiling of the L1 data into L2. This can possibly be done in a docker, but also a regular batch routine with provided parameters.

Task SA2.9 EPOS

Task SA2.10 Disaster Mitigation

  • Preparation of expanded CC for EINFRA12 - broader country coverage; broader disaster type coverage