Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-Engage:AMB-2016-05-18"

From EGIWiki
Jump to navigation Jump to search
Line 103: Line 103:


=== Task SA2.8 EISCAT_3D  ===
=== Task SA2.8 EISCAT_3D  ===
* File download capability added to the DIRAC-EISCAT portal
* Preparing for talk and demo at upcoming EISCAT_3D User Meeting (Uppsala): http://www.space.irfu.se/workshops/EISCAT-3D_User2016/
* Next meeting to focus on security aspect of the portal (certificate-less login; user tracking on infrastructure): May 20, 10:00 Ams time


=== Task SA2.9 EPOS  ===
=== Task SA2.9 EPOS  ===

Revision as of 14:39, 17 May 2016

{

EGI-Engage project: Main page WP1(NA1) WP3(JRA1) WP5(SA1) PMB Deliverables and Milestones Quality Plan Risk Plan Data Plan
Roles and
responsibilities
WP2(NA2) WP4(JRA2) WP6(SA2) AMB Software and services Metrics Project Office Procedures



Activity Reports

WP1 (NA1) (Yannick Legré)

Dissamination reports

Milestones & Deliverables

Task NA1.1 Administrative and Financial Management

Task NA1.2 Technical Management

Task NA1.3 Quality and Risk Management

WP2 (NA2) (Sergio Andreozzi)

Dissemination reports

Milestones & Deliverables

Task NA2.1 Communication and Dissemination

Task NA2.2 Strategy, Business Development and Exploitation

Task NA2.3 SME/Industry Engagement and Big Data Value Chain

WP3 (JRA1) (Diego Scardaci)

Milestones & Deliverables

Task JRA1.1 Authentication and Authorisation Infrastructure

Task JRA1.2 Service Registry and Marketplace

Task JRA1.3 Accounting

Task JRA1.4 Operations Tools

GOCDB

Task JRA1.5 Resource Allocation – e-GRANT

WP4 (JRA2) (Matthew Viljoen)

Dissamination reports

Milestones & Deliverables

Task JRA2.1 Federated Open Data

Task JRA2.2 Federated Cloud

Task JRA2.3 e-Infrastructures Integration

Task JRA2.4 Accelerated Computing

WP5 (SA1) (Peter Solagna)

Dissamination reports

Milestones & Deliverables

Task SA1.1 Operations Coordination

Task SA1.2 Development of Security Operations

Task SA1.3 Integration, Deployment of Grid and Cloud Platforms

WP6 (SA2) (Gergely Sipos)

Dissemination reports

Milestones & Deliverables

  • M6.5 - Training plan for second period
  • D6.10 - Infrastructure tests and best usage practices for life science service providers

Task SA2.1 Training

Task SA2.2 Technical User Support

Task SA2.3 ELIXIR

  • Working on D6.10 - Infrastructure tests and best usage practices for life science service providers

Task SA2.4 BBMRI

Task SA2.5 MoBrain

Task SA2.6 DARIAH

  • Two cloud sites already in the VO
  • CDSTAR - Base system is Dockerised (docker containers); To decide about licence and then release. (The system will be offered for download and installation at local (home) premises. Target users are those with 100s of thousands of scanned images, online service would not be an option because of large data transfer)
  • WS-PGRADE - To speak with Zoltan about status
  • gLibrary - Writing conference paper to EURALEX2016
  • Ongoing: Transform the DARIAH CC wiki page into a page that promotes the DARIAH CC demonstrators and services. Gergely and Giuseppe to create the first version

Task SA2.7 LifeWatch

Task SA2.8 EISCAT_3D

  • File download capability added to the DIRAC-EISCAT portal
  • Preparing for talk and demo at upcoming EISCAT_3D User Meeting (Uppsala): http://www.space.irfu.se/workshops/EISCAT-3D_User2016/
  • Next meeting to focus on security aspect of the portal (certificate-less login; user tracking on infrastructure): May 20, 10:00 Ams time

Task SA2.9 EPOS

Task SA2.10 Disaster Mitigation