Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-Engage:AMB-2015-12-16"

From EGIWiki
Jump to navigation Jump to search
(Created page with "{{Template:EGI-Engage menubar}} {{TOC_right}} = Activity Reports = == WP1 (NA1) (Yannick Legre) == Dissamination reports === Milestones &...")
 
 
(32 intermediate revisions by 13 users not shown)
Line 14: Line 14:


=== Task NA1.3 Quality and Risk Management  ===
=== Task NA1.3 Quality and Risk Management  ===
 
* looking for reviewers https://docs.google.com/spreadsheets/d/1bWplJENMUiBergGZrJ-9pbbj_j2ApCu6jxS1V6G9WZw/edit#gid=0
* change in how surveys should be collected https://wiki.egi.eu/wiki/EGI-Engage:Quality_Assurance#Project_communication_and_outputs
* scheduling risk registry review
* managing deliverables and milestones review process
* Creation of template for software review https://documents.egi.eu/public/ShowDocument?docid=2492


== WP2 (NA2) (Sergio Andreozzi)  ==
== WP2 (NA2) (Sergio Andreozzi)  ==
Line 21: Line 25:


=== Milestones & Deliverables  ===
=== Milestones & Deliverables  ===
 
*Sy offered to be a reviewer for: M2.2; D1.3; D1.4
*D2.6: “Report on data sharing policies and legal framework in fishery and marine sciences data sector” (FAO)
**Connected Anton (author) with relevant information from CCs (through Gergely)
**ToC available at: https://documents.egi.eu/document/2699
**Need to confirm moderators and reviewers now for early feedback to ensure output of deliverable is useful for EGI
*D2.7: “Market Report on the fishery and marine sciences data sector” (ENG)
**ToC available at: https://documents.egi.eu/document/2700
**Need to confirm moderators and reviewers
*D2.9: "EGI Sustainability and Business Development Plan" (EGI.eu)
**Internal draft of ToC; will be circulated by 18 Dec


=== Task NA2.1 Communication and Dissemination  ===
=== Task NA2.1 Communication and Dissemination  ===
* Preparations for Krakow 2016: setting up SC meeting, negotiating MoU
* New case study: co-infection in snake diseases!
* Website redevelopment: sitemap developed, quotes from designer agencies acquired
* FitSM advertisement banner
* Develop brief and commission design for new EGI banners
* Collecting EGI publications: drafting emails
* Impact reporting: first thoughts, collecting examples, methodologies
* SME-oriented publication: brief and first thoughts
* FedCloud use cases: development of template for website


=== Task NA2.2 Strategy, Business Development and Exploitation  ===
=== Task NA2.2 Strategy, Business Development and Exploitation  ===


*Pay-for-Use
**Group call 14 Dec
**Full requirements gathering and analysis for e-GRANT P4U instance v2
**Chipster call 15 Dec
*Service Management
**Brochure discussed with Comms Team
**FitSM Training Calendar updated on EGI website; initial discussion with Yannick for 2016 calendar
**FitSM Foundation Course 10 Dec (paid)
**FitSM webpage banner on EGI site (with Comms Team)
*Impact assessment
**Meeting between NA2.2 and NA2.1 to discuss main themes for impact assessment and work towards first version to be ready by M12
*Events
**S. Andreozzi attended the European Innovation Summit and presented in the session [http://www.knowledge4innovation.eu/7th-eis-programme 'Open Innovation, Open Science, Open to the World']
* Collaborations
** Meeting with K. Padmore from SesameNet project to discuss possible collaborations


=== Task NA2.3 SME/Industry Engagement and Big Data Value Chain  ===
=== Task NA2.3 SME/Industry Engagement and Big Data Value Chain  ===
 
*SME Engagement
**Group call 2 Dec
**Identified potential collaborations through PLANETIC, CESAR
**Discussed JRES Conference in France with large industrial participation and material to present with Comms Team
**UberCloud newsletter article + EGI News Item + picked up by HPCwire and Primeur Magazine + disseminated through 15 LinkedIn groups
**Arctur call 2 Dec
**Luna Technologies call 3 Dec
**Supporting ESA and Stimulus project (was TerraDue tech. requirements) call 3 Dec
**Brochure discussed with Comms Team 14 Dec
*Market Analysis
**Group call 2 Dec
**Need someone to attend RDA Workshop on "Data Service/Tool Discoverability" in Greece (April 2016)


== WP3 (JRA1) (Diego Scardaci)  ==
== WP3 (JRA1) (Diego Scardaci)  ==
[[EGI-Engage:Dissemination|Dissamination reports]]
[[EGI-Engage:Dissemination|Dissemination reports]]


=== Milestones & Deliverables  ===
=== Milestones & Deliverables  ===
 
* D3.2: Design of the EGI Service Registry and Marketplace (PM12)
* D3.3: Accounting Repository release (PM12)
* D3.4: First release of the operational tools (PM12)
* D3.5: Analysis on techniques to manage big data on the EGI accounting system (PM12)
* M3.2: User requirements on data accounting collected (PM12)


=== Task JRA1.1 Authentication and Authorisation Infrastructure  ===
=== Task JRA1.1 Authentication and Authorisation Infrastructure  ===
* Document 'EGI AAI Pilot - Architecture & Roadmap' available in google doc: 00 EGI.eu - EGI-Engage > WP3 (JRA1) tools > AAI
* Meeting


=== Task JRA1.2 Service Registry and Marketplace  ===
=== Task JRA1.2 Service Registry and Marketplace  ===
* Assessment of technologies to implement the marketplace still on-going: first draft by Dean ready


=== Task JRA1.3 Accounting  ===
=== Task JRA1.3 Accounting  ===
* Survey on data accounting sent to several possible interested communities
* Make UserCPU import more robust and identified problems with 0,14% of the current data set.
* Work on implementation of the navigation in the New Accounting Portal
* Fixed problems with custom WSGI module and Apache configuration.
* Implemented view templating and URL dispatcher in Django.
* Fixed problems with Cross-domain AJAX XMLHttpRequest
* Optimized XHR times.
* Demo of the Portal in the ATB
* Implemented Indexes for new queries.
* Implemented min-max-avg modifiers for Storage view metrics.


=== Task JRA1.4 Operations Tools  ===
=== Task JRA1.4 Operations Tools  ===
==== Operations Portal ====
*Migration of data of VAPOR
*Set up of a robot certificate for VAPOR
*migration to gitlab
==== GOCDB ====
* v5.5 released
*Integration of Elixir IdP and EGI-Proxy IdP with gocdb-test
*Development for v5.5.1: Reserved scopes, .properties file upload for multiple k=v pairs
==== SAM & ARGO ====
No report received
==== Secure Monitoring ====
No report received


=== Task JRA1.5 Resource Allocation – e-GRANT  ===
=== Task JRA1.5 Resource Allocation – e-GRANT  ===
*taking part in coordinating new e-GRANt's testing phase
*gathering remarks and requirements from Pay-for-Use team
*implementation of the bugfixes for first reported bugs from testng phase


== WP4 (JRA2) (Matthew Viljoen)  ==
== WP4 (JRA2) (Matthew Viljoen)  ==
Line 55: Line 141:
=== Task JRA2.1 Federated Open Data  ===
=== Task JRA2.1 Federated Open Data  ===


* Finalization of use cases for Open Data Platform prototype
* Discussion with OpenAIRE on integration with Open Data Platform


=== Task JRA2.2 Federated Cloud  ===
=== Task JRA2.2 Federated Cloud  ===
* Ongoing work on D4.3.
* OCCI 1.2 drafts finalized, going through final OGF process for approval.


=== Task JRA2.3 e-Infrastructures Integration  ===
=== Task JRA2.3 e-Infrastructures Integration  ===


=== Task JRA2.4 Accelerated Computing  ===
=== Task JRA2.4 Accelerated Computing  ===
 
Coordination with CESNET/MU partner of MoBrain CC in order to:
* add their GPU nodes to the cloud testbed (i.e. via OCCI, not interested in extending the grid testbed)
* preparing a GPU-enabled VM image with Gromacs and Amber, and test them in the FedCloud
* cloning the Gromacs and Amber WeNMR portals and interface it to the testbed above


== WP5 (SA1) (Peter Solagna)  ==
== WP5 (SA1) (Peter Solagna)  ==
Line 69: Line 162:


=== Task SA1.1 Operations Coordination  ===
=== Task SA1.1 Operations Coordination  ===
Storage accounting deployment campaign for tracking storage usage starting in January 2016 (dCache and DPM)
Roadmap (Jan-Feb) for rolling of LTOS to production and user feedback to be developed
Security risk assessment in progress and being reviewed (new threats) - Linda Cornwall is leading


=== Task SA1.2 Development of Security Operations  ===
=== Task SA1.2 Development of Security Operations  ===
Line 78: Line 174:


=== Milestones & Deliverables  ===
=== Milestones & Deliverables  ===
 
* Working on M6.2 (BBMRI), D6.2 (DARIAH), M6.3 (ELIXIR), M6.4 (EPOS), D6.3 (ELIXIR), D6.4 (MoBrain), D6.5 (DARIAH), D6.6 (LifeWatch)


=== Task SA2.1 Training  ===
=== Task SA2.1 Training  ===

Latest revision as of 10:28, 16 December 2015

EGI-Engage project: Main page WP1(NA1) WP3(JRA1) WP5(SA1) PMB Deliverables and Milestones Quality Plan Risk Plan Data Plan
Roles and
responsibilities
WP2(NA2) WP4(JRA2) WP6(SA2) AMB Software and services Metrics Project Office Procedures



Activity Reports

WP1 (NA1) (Yannick Legre)

Dissamination reports

Milestones & Deliverables

Task NA1.1 Administrative and Financial Management

Task NA1.2 Technical Management

Task NA1.3 Quality and Risk Management

WP2 (NA2) (Sergio Andreozzi)

Dissemination reports

Milestones & Deliverables

  • Sy offered to be a reviewer for: M2.2; D1.3; D1.4
  • D2.6: “Report on data sharing policies and legal framework in fishery and marine sciences data sector” (FAO)
    • Connected Anton (author) with relevant information from CCs (through Gergely)
    • ToC available at: https://documents.egi.eu/document/2699
    • Need to confirm moderators and reviewers now for early feedback to ensure output of deliverable is useful for EGI
  • D2.7: “Market Report on the fishery and marine sciences data sector” (ENG)
  • D2.9: "EGI Sustainability and Business Development Plan" (EGI.eu)
    • Internal draft of ToC; will be circulated by 18 Dec

Task NA2.1 Communication and Dissemination

  • Preparations for Krakow 2016: setting up SC meeting, negotiating MoU
  • New case study: co-infection in snake diseases!
  • Website redevelopment: sitemap developed, quotes from designer agencies acquired
  • FitSM advertisement banner
  • Develop brief and commission design for new EGI banners
  • Collecting EGI publications: drafting emails
  • Impact reporting: first thoughts, collecting examples, methodologies
  • SME-oriented publication: brief and first thoughts
  • FedCloud use cases: development of template for website

Task NA2.2 Strategy, Business Development and Exploitation

  • Pay-for-Use
    • Group call 14 Dec
    • Full requirements gathering and analysis for e-GRANT P4U instance v2
    • Chipster call 15 Dec
  • Service Management
    • Brochure discussed with Comms Team
    • FitSM Training Calendar updated on EGI website; initial discussion with Yannick for 2016 calendar
    • FitSM Foundation Course 10 Dec (paid)
    • FitSM webpage banner on EGI site (with Comms Team)
  • Impact assessment
    • Meeting between NA2.2 and NA2.1 to discuss main themes for impact assessment and work towards first version to be ready by M12
  • Events
  • Collaborations
    • Meeting with K. Padmore from SesameNet project to discuss possible collaborations

Task NA2.3 SME/Industry Engagement and Big Data Value Chain

  • SME Engagement
    • Group call 2 Dec
    • Identified potential collaborations through PLANETIC, CESAR
    • Discussed JRES Conference in France with large industrial participation and material to present with Comms Team
    • UberCloud newsletter article + EGI News Item + picked up by HPCwire and Primeur Magazine + disseminated through 15 LinkedIn groups
    • Arctur call 2 Dec
    • Luna Technologies call 3 Dec
    • Supporting ESA and Stimulus project (was TerraDue tech. requirements) call 3 Dec
    • Brochure discussed with Comms Team 14 Dec
  • Market Analysis
    • Group call 2 Dec
    • Need someone to attend RDA Workshop on "Data Service/Tool Discoverability" in Greece (April 2016)

WP3 (JRA1) (Diego Scardaci)

Dissemination reports

Milestones & Deliverables

  • D3.2: Design of the EGI Service Registry and Marketplace (PM12)
  • D3.3: Accounting Repository release (PM12)
  • D3.4: First release of the operational tools (PM12)
  • D3.5: Analysis on techniques to manage big data on the EGI accounting system (PM12)
  • M3.2: User requirements on data accounting collected (PM12)

Task JRA1.1 Authentication and Authorisation Infrastructure

  • Document 'EGI AAI Pilot - Architecture & Roadmap' available in google doc: 00 EGI.eu - EGI-Engage > WP3 (JRA1) tools > AAI
  • Meeting

Task JRA1.2 Service Registry and Marketplace

  • Assessment of technologies to implement the marketplace still on-going: first draft by Dean ready

Task JRA1.3 Accounting

  • Survey on data accounting sent to several possible interested communities
  • Make UserCPU import more robust and identified problems with 0,14% of the current data set.
  • Work on implementation of the navigation in the New Accounting Portal
  • Fixed problems with custom WSGI module and Apache configuration.
  • Implemented view templating and URL dispatcher in Django.
  • Fixed problems with Cross-domain AJAX XMLHttpRequest
  • Optimized XHR times.
  • Demo of the Portal in the ATB
  • Implemented Indexes for new queries.
  • Implemented min-max-avg modifiers for Storage view metrics.

Task JRA1.4 Operations Tools

Operations Portal

  • Migration of data of VAPOR
  • Set up of a robot certificate for VAPOR
  • migration to gitlab

GOCDB

  • v5.5 released
  • Integration of Elixir IdP and EGI-Proxy IdP with gocdb-test
  • Development for v5.5.1: Reserved scopes, .properties file upload for multiple k=v pairs

SAM & ARGO

No report received

Secure Monitoring

No report received

Task JRA1.5 Resource Allocation – e-GRANT

  • taking part in coordinating new e-GRANt's testing phase
  • gathering remarks and requirements from Pay-for-Use team
  • implementation of the bugfixes for first reported bugs from testng phase

WP4 (JRA2) (Matthew Viljoen)

Dissamination reports

Milestones & Deliverables

Task JRA2.1 Federated Open Data

  • Finalization of use cases for Open Data Platform prototype
  • Discussion with OpenAIRE on integration with Open Data Platform

Task JRA2.2 Federated Cloud

  • Ongoing work on D4.3.
  • OCCI 1.2 drafts finalized, going through final OGF process for approval.

Task JRA2.3 e-Infrastructures Integration

Task JRA2.4 Accelerated Computing

Coordination with CESNET/MU partner of MoBrain CC in order to:

  • add their GPU nodes to the cloud testbed (i.e. via OCCI, not interested in extending the grid testbed)
  • preparing a GPU-enabled VM image with Gromacs and Amber, and test them in the FedCloud
  • cloning the Gromacs and Amber WeNMR portals and interface it to the testbed above

WP5 (SA1) (Peter Solagna)

Dissamination reports

Milestones & Deliverables

Task SA1.1 Operations Coordination

Storage accounting deployment campaign for tracking storage usage starting in January 2016 (dCache and DPM) Roadmap (Jan-Feb) for rolling of LTOS to production and user feedback to be developed Security risk assessment in progress and being reviewed (new threats) - Linda Cornwall is leading

Task SA1.2 Development of Security Operations

Task SA1.3 Integration, Deployment of Grid and Cloud Platforms

WP6 (SA2) (Gergely Sipos)

Dissemination reports

Milestones & Deliverables

  • Working on M6.2 (BBMRI), D6.2 (DARIAH), M6.3 (ELIXIR), M6.4 (EPOS), D6.3 (ELIXIR), D6.4 (MoBrain), D6.5 (DARIAH), D6.6 (LifeWatch)

Task SA2.1 Training

Task SA2.2 Technical User Support

Task SA2.3 ELIXIR

Task SA2.4 BBMRI

Task SA2.5 MoBrain

Task SA2.6 DARIAH

Task SA2.7 LifeWatch

Task SA2.8 EISCAT_3D

Task SA2.9 EPOS

Task SA2.10 Disaster Mitigation