Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-Engage:AMB-2015-07-22"

From EGIWiki
Jump to navigation Jump to search
Line 75: Line 75:


=== Task JRA2.3 e-Infrastructures Integration  ===
=== Task JRA2.3 e-Infrastructures Integration  ===
Progressing integration activities with:


* NeCTAR (Australian research cloud: genomics, astronomy, brain research)
* Compute Canada (genomics)
* OSG US (brain research)
* Overview of ELIXIR use case for EGI/EUDAT integration in collaboration with the virtual team
* Initial integration discussions with Brazil for cloud activities
* Cloud integration activities in progress with Korea (KISTI) and initial discussions with China (IHEP)


=== Task JRA2.4 Accelerated Computing  ===
=== Task JRA2.4 Accelerated Computing  ===

Revision as of 17:27, 21 July 2015

EGI-Engage project: Main page WP1(NA1) WP3(JRA1) WP5(SA1) PMB Deliverables and Milestones Quality Plan Risk Plan Data Plan
Roles and
responsibilities
WP2(NA2) WP4(JRA2) WP6(SA2) AMB Software and services Metrics Project Office Procedures



Activity Reports

WP1 (NA1) (Yannick Legre)

Dissamination reports

Milestones & Deliverables

Working on the Table of Content of D4.1 (CANFAR integration) and M4.1 (open data platform requirements and technology). Reviewers and moderators have been contacted, but need to be confirmed.

Task NA1.1 Administrative and Financial Management

Task NA1.2 Technical Management

  • Review of the Open Data Platform requirements and organization of the interview process
  • Discussion of the EGI Marketplace business function, and organization of the interview process to collect requirements from users, service providers
  • Review of the service portfolio in preparation to a planning meeting with EUDAT

Task NA1.3 Quality and Risk Management

WP2 (NA2) (Sergio Andreozzi)

Dissamination reports

Milestones & Deliverables

Task NA2.1 Communication and Dissemination

(since the last meeting)

  • Copyedit and layout of the EGI Strategy 2015-2020 publication
  • Scoping definitions for upcoming officer opening
  • Communications metrics for Q1 (Engage)
  • Responding to media query! (Nature News)
  • First steps towards all e-Infras CF2016: setting up steering committee
  • CF2015: Feedback on guides, setting up plan for review, work on colocations, programme sketch
  • CF2015: preparing for abstract review

Task NA2.2 Strategy, Business Development and Exploitation

Task NA2.3 SME/Industry Engagement and Big Data Value Chain

  • Contributions to M1.2 1st Intermediate Report outlining partner main achievements and future plans

WP3 (JRA1) (Diego Scardaci)

Dissamination reports

Milestones & Deliverables

Task JRA1.1 Authentication and Authorisation Infrastructure

Task JRA1.2 Service Registry and Marketplace

Task JRA1.3 Accounting

Task JRA1.4 Operations Tools

Task JRA1.5 Resource Allocation – e-GRANT

WP4 (JRA2) (Tiziana Ferrari)

Dissamination reports

Milestones & Deliverables

Task JRA2.1 Federated Open Data

Gathering of requirements for open data platform by integrating expectations from various communities. Preparation of the milestone report due to by the end August.

Task JRA2.2 Federated Cloud

Task JRA2.3 e-Infrastructures Integration

Progressing integration activities with:

  • NeCTAR (Australian research cloud: genomics, astronomy, brain research)
  • Compute Canada (genomics)
  • OSG US (brain research)
  • Overview of ELIXIR use case for EGI/EUDAT integration in collaboration with the virtual team
  • Initial integration discussions with Brazil for cloud activities
  • Cloud integration activities in progress with Korea (KISTI) and initial discussions with China (IHEP)

Task JRA2.4 Accelerated Computing

  • Attributes "GPUNumber" e "GPUMode" have been added to the command BLAH_JOB_SUBMIT. This required modifications blah_common_submit_functions.sh and server.c. The first implementation of the two new attributes have been successfully tested at CIRMMP cluster with the PBS/Torque LRMS. This required modifications to pbs_submit.sh.
  • The next planned steps are:
    • installing slurm LRMS on CIRMMP cluster
    • add new JDL attributes in CREAM core
  • After a review of the available technologies, GPGPU virtualisation in KVM/QEMU has been analysed and performance tests of passthrough technology have been carried out in a IBM dx360 M4 server with two NVIDIA Tesla K20 accelerators. The STMV test example of NAMD molecular dynamics simulation (CUDA version) has been used as testing application. The results shown that the application run 2-3% slower in a virtual machine compared to direct run on the tested server. To avoid potential performance problems, hyperthreading should be switched off.
  • Recently a cloud site with GPGPU support has been set up with one master node and two compute nodes, using OpenStack Kilo as CMF and KVM as hypervisor, all on top of Ubuntu 14.04.2 LTS sysop.
  • The next planned steps are:
    • Testing the Openstack scheduler
    • Start the integration with EGI-Engage Fedcloud

WP5 (SA1) (Peter Solagna)

Dissamination reports

Milestones & Deliverables

Task SA1.1 Operations Coordination

Task SA1.2 Development of Security Operations

Task SA1.3 Integration, Deployment of Grid and Cloud Platforms

WP6 (SA2) (Gergely Sipos)

Dissemination reports

Milestones & Deliverables

Task SA2.1 Training

Task SA2.2 Technical User Support

Task SA2.3 ELIXIR

Task SA2.4 BBMRI

Task SA2.5 MoBrain

Task SA2.6 DARIAH

Task SA2.7 LifeWatch

Task SA2.8 EISCAT_3D

Task SA2.9 EPOS

Task SA2.10 Disaster Mitigation