Welcome to the page of the EGI-DRIHM collaboration

EGI DRIHAM collaboration menu: Home Members Infrastructure Roadmap


Note well. The detailed description of the computational and storage activity requirements to support DRIHM applications, both the highly parallel and less demanding ones, will be added to the wiki EGI-DRIHM collaboration wiki pages (June 15 - June 30 2013).

DRIHM VO Support

  • June 15 - July 31 2013. Add the support for the DRIHM VO in the resources listed in the EGI testbed, including some Storage Elements to store the input and output data of the models and to test the file transfers to local resources (i.e. storage used by a portal).
  • June 15 - July 31 2013. Enable the DRIHM VO in a couple of EGI scheduler service (i.e. gLite-WMS/LB), in order to test the facilities offered by these services (jobs bookeeping, rescheduling, resources matchmaking, Input/Output SandBox handling, etc.).

Services for DRIHM

June 15 - June 30 2013. Other services needed are: a VOMS server (already available for DRIHM), a file catalogue (i.e. gLite-LFC) and a MyProxy server.

Porting

15 June - 01 July 2013. Porting of the demanding model (i.e. WRF) to the Grid Environment in collaboration with the EGI/NGIs user support teams for some selected "Critical Cases" and preliminary tests of the Grid submission/data management. (using NGI general purpose VO if DRIHM is not deployed yet)

Define sites to support the demanding jobs

01 July - 15 August 2013. Identification of the testbed members willing to run demanding jobs, as the meteo models, with the indication of the maximum allowable parallelism degree.

Job submission testing

  • 01 July - 31 Aug 2013. Test the job submission (direct to CE and via WMS/LB) and data management from a command line user interface for the most demanding models on the DRIHM testbed - Performance evaluation of the infrastructure resources and services.
  • 01 July - 31 Aug 2013. Porting and preliminary tests for the submission of jobs and data management from a command line user interface of the less demanding applications (hydrologic and hydraulic models) - Performance evaluation of the infrastructure and investigation of the capabilities offered by the virtualization systems available within EGI that can be suitable to run these applications.
  • 01-30 September 2013. Preliminary test for the submission of jobs from the DRIHM sci-bus-based portal to the EGI testbed resources.
  • 1 October 2013 - June 2014. Incremental setup and tests of the complete suite of DRIHM models on the testbed resources  ?

Production phase

November 2013 ? - end of the DRIHM project


Table of actions

Nr. Period Involved Action Progress
1. June 15 - June 30, 2013 NGIs Enable DRIHM VO at sites listed in the testbed (computing and storage resources) Below is the list of sites already supporting DRIHM VO:

Serbia:
AEGIS01-IPB-SCL

Greece:
GR-06-IASA
GR-10-UOI
HG-02-IASA
HG-03-AUTH
HG-04-CTI-CEID
HG-05-FORTH
HG-06-EKT
HG-08-Okeanos

Italy:
IGI-BOLOGNA

Germany:
LRZ

Netherlands:
NIKHEF-ELPROD

Czech Republic:
prague_cesnet_lcg2


REF: List of sites supporting VO DRIHM.EU

Below is the list of sites planning to enable DRIHM VO soon:
Croatia:
3 sites will support

Italy:
NAPLES, ROma3 INFN

Macedonia:
MK-03-FINKI

Spain:
CETA-CIEMAT


2. June 15 - June 30, 2013 NGIs & DRIHM DRIHM VO services: WMS, MyProxy, LFC, VOMS VOMS: vomsmania.cnaf.infn.it

WMS:
MyProxy:
LFC:

Catch All Services could be used ?

3. June 15 - June 30, 2013 NGIs & DRIHM WRF with MPICH2, GFORTRAN, NetCDF, GRIB2 deployment at NGIs. Issues reported by D. Cesini in compiling WRF code on SL5, it works on SL6

France has expertize and can provide support in compiling WRF.

4. July 1 - August 15, 2013 NGIs List of sites for demanding jobs (indicate maximum number of cores for paralell computing)
5. July 1 - August 31, 2013 DRIHM Testing DRIHM models at NGIs computing and storage resources (job submission of WRF models, data management using command line interface)
6. September 1 - September 30, 2013 DRIHM Testing DRIHM models at NGIs computing and storage resources (job submission of WRF models, data management using dedicated SCI-BUS portal)