Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

DCH-RP:Scenarios

From EGIWiki
Revision as of 15:25, 4 April 2013 by Michel (talk | contribs)
Jump to navigation Jump to search
WP5: Proofs of Concept Scenarios PoC Phase 1 PoC Phase 2 DCH Glossary


The DCH-RP Work Package 5 will conduct experimental proofs of concept reflecting scenarios that are elemental to the development of a roadmap for the DCH community.

The scenarios are maintained in DocDB at https://documents.egi.eu/document/1677