Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Configuration Database GOCDB Availability and Continuity Plan"

From EGIWiki
Jump to navigation Jump to search
 
(45 intermediate revisions by 3 users not shown)
Line 14: Line 14:
|-
|-
! scope="row"| Risks assessment
! scope="row"| Risks assessment
| 2018-08-10
| 2021-04-19
| 2019 August
| 2022 April
|-
|-
! scope="row"| Av/Co plan
! scope="row"| Av/Co plan
| 2018-11-02
| 2021-04-19
| Q3 2019
| 2022 April
|-
|-
|}
|}


= Performances =
Previous plans are collected here: https://documents.egi.eu/secure/ShowDocument?docid=3537


= Availability requirements and performance =
In the OLA it was agreed the following performances targets, on a monthly basis:
In the OLA it was agreed the following performances targets, on a monthly basis:
*Availability: 99%
*Availability: 99%
*Reliability 99%
*Reliability 99%


<pre style="color: blue"> Other availability requirements:
Other availability requirements:
- the service is accessible through X509 certificate and/or other authentication system
*the service is accessible through X509 certificate and EGI Check-in
- The service is accessible via CLI and/or webUI
*the service is accessible via webUI and API
- (depending on the service, specific requirements can be identified. In case, for each requirement report what is the action/measure in case of failure)
 
The service availability is regularly tested by nagios probe org.nagiosexchange.Portal-WebCheck: https://argo-mon.egi.eu/nagios/cgi-bin/status.cgi?servicegroup=SITE_EGI-MARKETPLACE_egi.Portal&style=overview


</pre>
The service availability is regularly tested by nagios probes (eu.egi.CertValidity, org.nagios.GOCDB-PortCheck, org.nagiosexchange.GOCDB-PI, org.nagiosexchange.GOCDB-WebCheck): https://argo-mon.egi.eu/nagios/cgi-bin/status.cgi?servicegroup=SERVICE_egi.GOCDB&style=detail


The performances reports in terms of Availability and Reliability are produced by [http://egi.ui.argo.grnet.gr/egi/OPS-MONITOR-Critical ARGO] on an almost real time basis and they are also periodically collected into the [https://documents.egi.eu/public/ShowDocument?docid=2324 Documentation Database].
The performances reports in terms of Availability and Reliability are produced by [https://argo.egi.eu/egi/OPS-MONITOR-Critical ARGO] on an almost real time basis and they are also periodically collected into the [https://documents.egi.eu/public/ShowDocument?docid=2324 Documentation Database].


Over the past years, GOCDB hadn't particular Av/Co issues highlighted by the performances that need to be further investigated.
Over the past years, GOCDB hadn't particular Av/Co issues highlighted by the performances that need to be further investigated.
Line 44: Line 42:
= Risks assessment and management =
= Risks assessment and management =


For more details, please look at the [https://docs.google.com/spreadsheets/d/1eww6AtARDnNEWerZgG0rjoAOwSpRLDQU-Ps02sr_pPs/edit#gid=1565906040 google spreadsheet]. We will report here a summary of the assessment.
For more details, please look at the [https://docs.google.com/spreadsheets/d/1eww6AtARDnNEWerZgG0rjoAOwSpRLDQU-Ps02sr_pPs/edit#gid=698217933 google spreadsheet]. We will report here a summary of the assessment.
 
== Risks analysis (to update) ==


== Risks analysis ==
{| class="wikitable"
{| class="wikitable"
! Risk id
! Risk id
Line 59: Line 56:
| 1
| 1
| Service unavailable / loss of data due to hardware failure
| Service unavailable / loss of data due to hardware failure
| Web portal and PI, Database
| Web portal and PI
| GOCDB has a separate failover instance. If the web server or database machines failed and were not readily restartable the failover would be engaged.  
| Reduce the likelihood: Webservers are in a highly availbale pair on seperate VMWare hypervisors.
Reduce the impact: GOCDB has a separate failover instance. In case of disruption to the primary webservers, the failover is automatically enagaed by the load balancers. In the case of prolonged disruption, the failover would be engaged by editing the DNS entry for goc.egi.eu.  
| style="background: green"| Low  
| style="background: green"| Low  
| In the case of a prolonged outage of the production hardware (+2 days), the failover would be set to read write mode, allowing the data to be updated.
| In the case of a prolonged outage of the production hardware (+2 days), the failover would be set to read write mode, allowing the data to be updated.
| "In the event of production hardware failure, the service would be restored incrementally
| In the event of production hardware failure, the service would be restored incrementally
 
*0.5 working days: a broadcast would be made providing the URL to the read only failover
0.5 working days: a broadcast would be made providing the URL to the read only failover
*1 working day: The DNS entry for goc.egi.eu would be changed to point at the read only failover
1 working day: The DNS entry for goc.egi.eu would be changed to point at the read only failover
*2 working days: The failover would be set to read write mode
2 working days: The failover would be set to read write mode"
|-
|-
| 2
| 2
| Service unavailable / loss of data due to software failure
| Service unavailable / loss of data due to software failure
| Web portal and PI
| Web portal and PI
| GOCDB has a separate failover instance. If the web server or GOCDB software failed and were not readily restartable the failover would be engaged. As the database is unaffected, all data would eventually be propagated to the failover within an hour.
| Reduce the likelihood: Webservers are in a highly available pair on separate VMWare hypervisors.
Reduce the impact: GOCDB has a separate failover instance. In case of disruption to the primary webservers, the failover is automatically engaged by the load balancers. In the case of prolonged disruption, the failover would be engaged by editing the DNS entry for goc.egi.eu.
| style="background: green"| Low  
| style="background: green"| Low  
| In the case of a prolonged outage of the production hardware (+2 days), the failover would be set to read write mode, allowing the data to be updated.
| In the case of a prolonged outage of the production hardware (+2 days), the failover would be set to read write mode, allowing the data to be updated.
| "In the event of production software failure, the service would be restored incrementally
| In the event of production hardware failure, the service would be restored incrementally
 
*0.5 working days: a broadcast would be made providing the URL to the read only failover
0.5 working days: a broadcast would be made providing the URL to the read only failover
*1 working day: The DNS entry for goc.egi.eu would be changed to point at the read only failover
1 working day: The DNS entry for goc.egi.eu would be changed to point at the read only failover
*2 working days: The failover would be set to read write mode
2 working days: The failover would be set to read write mode"
|-
|-
| 3
| 3
| service unavailable / loss of data due to human error
| service unavailable / loss of data due to human error
| Web portal and PI, Database
| Web portal and PI
| Access to production systems limited, service and procedures documented internally, configuration of web portal and PI is backed up daily, database backed up hourly for failover
| Reduce the likelihood: Webservers are in a highly available pair and under configuration management. Access to production systems is limited, service and procedures documented internally.
Reduce the impact: Webservers are configuration managed, making human error easier to roll back. GOCDB has a separate failover instance. In case of disruption to the primary webservers, the failover is automatically engaged by the load balancers. In the case of prolonged disruption, the failover would be engaged by editing the DNS entry for goc.egi.eu.
| style="background: green"| Low  
| style="background: green"| Low  
| In the case of a prolonged outage of the production service (+2 days) due to human error, the failover would be set to read write mode, allowing the data to be updated.
| In the case of a prolonged outage of the production service (+2 days) due to human error, the failover would be set to read write mode, allowing the data to be updated.
| "In the event of production service failure, the service would be restored incrementally
| In the event of production hardware failure, the service would be restored incrementally
 
*0.5 working days: a broadcast would be made providing the URL to the read only failover
0.5 working days: a broadcast would be made providing the URL to the read only failover
*1 working day: The DNS entry for goc.egi.eu would be changed to point at the read only failover
1 working day: The DNS entry for goc.egi.eu would be changed to point at the read only failover
*2 working days: The failover would be set to read write mode
2 working days: The failover would be set to read write mode"
|-
|-
| 4
| 4
| service unavailable for network failure (Network outage with causes external of the site)
| service unavailable / loss of data due to failure (for whatever reason) of service dependencies managed by other STFC teams (i.e Networking, VMWare, Load Balancer and Database)
| Web portal and PI, Database
| Web portal and PI
| GOCDB has a separate failover instance at a STFC data centre located at a different site. If the was a network failure at RAL and was not readily restartable the failover would be engaged.
| Reduce the likelihood: Load Balancers are in a highly available pair on separate VMWare hypervisors. Database is a highly available cluster.
Reduce the impact: Load Balancers are under configuration management, making some errors easier to roll back. GOCDB has a separate failover instance at a STFC data centre located at a different site. In the case of prolonged disruption, the failover would be engaged by editing the DNS entry for goc.egi.eu.
| style="background: green"| Low  
| style="background: green"| Low  
| In the case of a prolonged outage of the network (+2 days), the failover would be set to read write mode, allowing the data to be updated.
| In the case of a prolonged outage of the network (+2 days), the failover would be set to read write mode, allowing the data to be updated.
| "In the event of production network failure, the service would be restored incrementally
| In the event of production hardware failure, the service would be restored incrementally
 
*0.5 working days: a broadcast would be made providing the URL to the read only failover
0.5 working days: a broadcast would be made providing the URL to the read only failover
*1 working day: The DNS entry for goc.egi.eu would be changed to point at the read only failover
1 working day: The DNS entry for goc.egi.eu would be changed to point at the read only failover
*2 working days: The failover would be set to read write mode
2 working days: The failover would be set to read write mode"
|-
|-
| 5
| 5
| Unavailability of key technical and support staff (holidays period, sickness, ...)
| Unavailability of key technical and support staff (holidays period, sickness, ...)
| Web portal and PI, Database
| Web portal and PI
| GOCDB technical / support staff try not to be on leave at the same time for a prolonged period. A cover person, capable of handling tickets and investigating minor problems, is assigned in the case of short term absences or an 'At Risk' is declared.  
| Reduce the likelihood: GOCDB technical / support staff try not to be on leave at the same time for a prolonged period. A cover person, capable of handling tickets and investigating minor problems, is assigned in the case of short term absences or an 'At Risk' is declared.
| style="background: green"| Low  
| style="background: green"| Low  
| Service would be restored on the return of technical / support staff
| Service would be restored on the return of technical / support staff
Line 116: Line 113:
| Major disruption in the data centre. Fire, flood  or electric failure for example
| Major disruption in the data centre. Fire, flood  or electric failure for example
| Web portal and PI, Database
| Web portal and PI, Database
| GOCDB runs on UPS so should remain operational in the event of electrical failure. In the case of other, long lasting, data centre disruption, the failover would be engaged.  
| Reduce the likelihood: The health of the data centre is proactively managed by a team of experts.
Reduce the impact: The GOCDB webservers, and all it's system dependencies (see risk 4) run on UPS, so should remain operational in the event of electrical failure. In the case of other, long lasting, data centre disruption, the failover would be engaged.
| style="background: green"| Low  
| style="background: green"| Low  
| In the case of a prolonged disruption (+2 days) to the data centre affecting GOCDB, the failover would be set to read write mode, allowing the data to be updated.
| In the case of a prolonged disruption (+2 days) to the data centre affecting GOCDB, the failover would be set to read write mode, allowing the data to be updated.
| "In the event of prolong data centre disruption affecting GOCDB, the service would be restored incrementally
| In the event of production hardware failure, the service would be restored incrementally
 
*0.5 working days: a broadcast would be made providing the URL to the read only failover
0.5 working days: a broadcast would be made providing the URL to the read only failover
*1 working day: The DNS entry for goc.egi.eu would be changed to point at the read only failover
1 working day: The DNS entry for goc.egi.eu would be changed to point at the read only failover
*2 working days: The failover would be set to read write mode
2 working days: The failover would be set to read write mode"
|-
|-
| 7
| 7
| Major security incident. The system is compromised by external attackers and needs to be reinstalled and restored.
| Major security incident. The system is compromised by external attackers and needs to be reinstalled and restored.
| Web portal and PI, Database
| Web portal and PI
| The failover would be engaged while security incidents are being investigated
| Reduce the likelihood: Internal security audits of the GOCDB machines that (for example) ensure packages are up to date, only the necessary ports are open, vulnerability warnings are received, etc.
Reduce the impact: The failover would be engaged while security incidents are being investigated. Use of configuration management means reinstalling, restoring or deployment of a new instance of a GOCDB host to a known state can be done quickly.
| style="background: green"| Low  
| style="background: green"| Low  
| "In the case of a prolonged outage (+2 days) of the production GOCDB, the failover would be set to read write mode, allowing the data to be updated."
| "In the case of a prolonged outage (+2 days) of the production GOCDB, the failover would be set to read write mode, allowing the data to be updated."
| "In the event of prolong data centre disruption affecting GOCDB, the service would be restored incrementally
| In the event of production hardware failure, the service would be restored incrementally
 
*0.5 working days: a broadcast would be made providing the URL to the read only failover
0.5 working days: a broadcast would be made providing the URL to the read only failover
*1 working day: The DNS entry for goc.egi.eu would be changed to point at the read only failover
1 working day: The DNS entry for goc.egi.eu would be changed to point at the read only failover
*2 working days: The failover would be set to read write mode
2 working days: The failover would be set to read write mode"
|-
|-
| 8
| 8
| (D)DOS attack. The service is unavailable because of a coordinated DDOS.
| (D)DOS attack. The service is unavailable because of a coordinated DDOS.
| Web portal and PI
| Web portal and PI
| The number of requests over time are monitored so any abnormal increase in traffic or response time would be noticed
| Reduce the impact: The number of requests over time are monitored so any abnormal increase in traffic or response time would be noticed
| style="background: green"| Low  
| style="background: green"| Low  
| ability to block offending IPs
| ability to block offending IPs
Line 147: Line 144:


== Outcome ==
== Outcome ==
The level of all the identified risks is acceptable and the countermeasures already adopted are considered satisfactory


The level of all the identified risks is acceptable and the countermeasures already adopted are considered satisfactory
== Additional information ==
*An internal recover procedure is available to the staff
*The Availability targets don't change in case the plan is invoked.
*Recovery requirements:
**Maximum tolerable period of disruption (MTPoD) (the maximum amount of time that a service can be unavailable or undelivered after an event that causes disruption to operations, before its stakeholders perceive unacceptable consequences): 2 days
**Recovery time objective (RTO) (the acceptable amount of time to restore the service in order to avoid unacceptable consequences associated with a break in continuity (this has to be less than MTPoD)): 1 day
**Recovery point objective (RPO) (the acceptable latency of data that will not be recovered): 2 days
*approach for the return to normal working conditions as reported in the risk assessment.


= Availability and Continuity test =
= Availability and Continuity test =
Given the off-site failover is engaged by editing DNS entries, and the potential for these to persist up to 24 hours in some case, it was agreed with the provider that testing a recovery scenario is not currently realistic.


Given the use of an off-site failover, it was agreed with the provider that testing a recovery scenario is not currently realistic.
In the event that the service at RAL disappears for a prolonged period (1+ day), the DNS entry would be flipped to point at the failover in DL, whilst reinstalling locally if needed. The failover is configured as a “backup” server in the load balancers, allowing it to serve the production URL automatically in the case of disruption to the primary webservers. The failover at DL is accessible here: https://gocdb.hartree.stfc.ac.uk.
In the event that the service at RAL disappears, the DNS entry would we flipped to point at the failover in DL, whilst reinstalling locally if needed. The failover at DL is accessible here: https://goc.dl.ac.uk .
The provider recently updated its DNS entry to point at its load balancers using the scripts for the failover, so they are confident these work.
One of provider major pieces of work for this year is moving the GOCDB to a different internal infrastructure. This will introduce configuration management to GOCDB for the first time. As such whatever reinstall process they were to test today would be obsolete in a matter of months.


Once the movement have been made, it will be evaluated the execution of a recovery test.
A pre-production instance is deployed at https://gocdb-preprod.egi.eu.


= Revision History  =
= Revision History  =
Line 184: Line 185:
| 2019-11-19
| 2019-11-19
| starting the yearly review....
| starting the yearly review....
|-
| <br>
| Alessandro Paolini
| 2020-02-26
| review completed
|-
| <br>
| Alessandro Paolini, Greg Corbett
| 2021-03-30, 2021-04-19
| yearly review; updated risk assessment section; updated Availability and Continuity test section
|-
|-
|
|

Latest revision as of 14:56, 19 April 2021

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security


Documentation menu: Home Manuals Procedures Training Other Contact For: VO managers Administrators


Back to main page: Services Availability Continuity Plans

Introduction

This page reports on the Availability and Continuity Plan for the GOCDB and it is the result of the risks assessment conducted for this service: a series of risks and treats has been identified and analysed, along with the correspondent countermeasures currently in place. Whenever a countermeasure is not considered satisfactory for either avoiding or reducing the likelihood of the occurrence of a risk, or its impact, it is agreed with the service provider a new treatment for improving the availability and continuity of the service. The process is concluded with an availability and continuity test.

Last Next
Risks assessment 2021-04-19 2022 April
Av/Co plan 2021-04-19 2022 April

Previous plans are collected here: https://documents.egi.eu/secure/ShowDocument?docid=3537

Availability requirements and performance

In the OLA it was agreed the following performances targets, on a monthly basis:

  • Availability: 99%
  • Reliability 99%

Other availability requirements:

  • the service is accessible through X509 certificate and EGI Check-in
  • the service is accessible via webUI and API

The service availability is regularly tested by nagios probes (eu.egi.CertValidity, org.nagios.GOCDB-PortCheck, org.nagiosexchange.GOCDB-PI, org.nagiosexchange.GOCDB-WebCheck): https://argo-mon.egi.eu/nagios/cgi-bin/status.cgi?servicegroup=SERVICE_egi.GOCDB&style=detail

The performances reports in terms of Availability and Reliability are produced by ARGO on an almost real time basis and they are also periodically collected into the Documentation Database.

Over the past years, GOCDB hadn't particular Av/Co issues highlighted by the performances that need to be further investigated.

Risks assessment and management

For more details, please look at the google spreadsheet. We will report here a summary of the assessment.

Risks analysis

Risk id Risk description Affected components Established measures Risk level Treatment Expected duration of downtime / time for recovery
1 Service unavailable / loss of data due to hardware failure Web portal and PI Reduce the likelihood: Webservers are in a highly availbale pair on seperate VMWare hypervisors.

Reduce the impact: GOCDB has a separate failover instance. In case of disruption to the primary webservers, the failover is automatically enagaed by the load balancers. In the case of prolonged disruption, the failover would be engaged by editing the DNS entry for goc.egi.eu.

Low In the case of a prolonged outage of the production hardware (+2 days), the failover would be set to read write mode, allowing the data to be updated. In the event of production hardware failure, the service would be restored incrementally
  • 0.5 working days: a broadcast would be made providing the URL to the read only failover
  • 1 working day: The DNS entry for goc.egi.eu would be changed to point at the read only failover
  • 2 working days: The failover would be set to read write mode
2 Service unavailable / loss of data due to software failure Web portal and PI Reduce the likelihood: Webservers are in a highly available pair on separate VMWare hypervisors.

Reduce the impact: GOCDB has a separate failover instance. In case of disruption to the primary webservers, the failover is automatically engaged by the load balancers. In the case of prolonged disruption, the failover would be engaged by editing the DNS entry for goc.egi.eu.

Low In the case of a prolonged outage of the production hardware (+2 days), the failover would be set to read write mode, allowing the data to be updated. In the event of production hardware failure, the service would be restored incrementally
  • 0.5 working days: a broadcast would be made providing the URL to the read only failover
  • 1 working day: The DNS entry for goc.egi.eu would be changed to point at the read only failover
  • 2 working days: The failover would be set to read write mode
3 service unavailable / loss of data due to human error Web portal and PI Reduce the likelihood: Webservers are in a highly available pair and under configuration management. Access to production systems is limited, service and procedures documented internally.

Reduce the impact: Webservers are configuration managed, making human error easier to roll back. GOCDB has a separate failover instance. In case of disruption to the primary webservers, the failover is automatically engaged by the load balancers. In the case of prolonged disruption, the failover would be engaged by editing the DNS entry for goc.egi.eu.

Low In the case of a prolonged outage of the production service (+2 days) due to human error, the failover would be set to read write mode, allowing the data to be updated. In the event of production hardware failure, the service would be restored incrementally
  • 0.5 working days: a broadcast would be made providing the URL to the read only failover
  • 1 working day: The DNS entry for goc.egi.eu would be changed to point at the read only failover
  • 2 working days: The failover would be set to read write mode
4 service unavailable / loss of data due to failure (for whatever reason) of service dependencies managed by other STFC teams (i.e Networking, VMWare, Load Balancer and Database) Web portal and PI Reduce the likelihood: Load Balancers are in a highly available pair on separate VMWare hypervisors. Database is a highly available cluster.

Reduce the impact: Load Balancers are under configuration management, making some errors easier to roll back. GOCDB has a separate failover instance at a STFC data centre located at a different site. In the case of prolonged disruption, the failover would be engaged by editing the DNS entry for goc.egi.eu.

Low In the case of a prolonged outage of the network (+2 days), the failover would be set to read write mode, allowing the data to be updated. In the event of production hardware failure, the service would be restored incrementally
  • 0.5 working days: a broadcast would be made providing the URL to the read only failover
  • 1 working day: The DNS entry for goc.egi.eu would be changed to point at the read only failover
  • 2 working days: The failover would be set to read write mode
5 Unavailability of key technical and support staff (holidays period, sickness, ...) Web portal and PI Reduce the likelihood: GOCDB technical / support staff try not to be on leave at the same time for a prolonged period. A cover person, capable of handling tickets and investigating minor problems, is assigned in the case of short term absences or an 'At Risk' is declared. Low Service would be restored on the return of technical / support staff The length of the absence / declared downtime
6 Major disruption in the data centre. Fire, flood or electric failure for example Web portal and PI, Database Reduce the likelihood: The health of the data centre is proactively managed by a team of experts.

Reduce the impact: The GOCDB webservers, and all it's system dependencies (see risk 4) run on UPS, so should remain operational in the event of electrical failure. In the case of other, long lasting, data centre disruption, the failover would be engaged.

Low In the case of a prolonged disruption (+2 days) to the data centre affecting GOCDB, the failover would be set to read write mode, allowing the data to be updated. In the event of production hardware failure, the service would be restored incrementally
  • 0.5 working days: a broadcast would be made providing the URL to the read only failover
  • 1 working day: The DNS entry for goc.egi.eu would be changed to point at the read only failover
  • 2 working days: The failover would be set to read write mode
7 Major security incident. The system is compromised by external attackers and needs to be reinstalled and restored. Web portal and PI Reduce the likelihood: Internal security audits of the GOCDB machines that (for example) ensure packages are up to date, only the necessary ports are open, vulnerability warnings are received, etc.

Reduce the impact: The failover would be engaged while security incidents are being investigated. Use of configuration management means reinstalling, restoring or deployment of a new instance of a GOCDB host to a known state can be done quickly.

Low "In the case of a prolonged outage (+2 days) of the production GOCDB, the failover would be set to read write mode, allowing the data to be updated." In the event of production hardware failure, the service would be restored incrementally
  • 0.5 working days: a broadcast would be made providing the URL to the read only failover
  • 1 working day: The DNS entry for goc.egi.eu would be changed to point at the read only failover
  • 2 working days: The failover would be set to read write mode
8 (D)DOS attack. The service is unavailable because of a coordinated DDOS. Web portal and PI Reduce the impact: The number of requests over time are monitored so any abnormal increase in traffic or response time would be noticed Low ability to block offending IPs Up to 4 hours

Outcome

The level of all the identified risks is acceptable and the countermeasures already adopted are considered satisfactory

Additional information

  • An internal recover procedure is available to the staff
  • The Availability targets don't change in case the plan is invoked.
  • Recovery requirements:
    • Maximum tolerable period of disruption (MTPoD) (the maximum amount of time that a service can be unavailable or undelivered after an event that causes disruption to operations, before its stakeholders perceive unacceptable consequences): 2 days
    • Recovery time objective (RTO) (the acceptable amount of time to restore the service in order to avoid unacceptable consequences associated with a break in continuity (this has to be less than MTPoD)): 1 day
    • Recovery point objective (RPO) (the acceptable latency of data that will not be recovered): 2 days
  • approach for the return to normal working conditions as reported in the risk assessment.

Availability and Continuity test

Given the off-site failover is engaged by editing DNS entries, and the potential for these to persist up to 24 hours in some case, it was agreed with the provider that testing a recovery scenario is not currently realistic.

In the event that the service at RAL disappears for a prolonged period (1+ day), the DNS entry would be flipped to point at the failover in DL, whilst reinstalling locally if needed. The failover is configured as a “backup” server in the load balancers, allowing it to serve the production URL automatically in the case of disruption to the primary webservers. The failover at DL is accessible here: https://gocdb.hartree.stfc.ac.uk.

A pre-production instance is deployed at https://gocdb-preprod.egi.eu.

Revision History

Version Authors Date Comments

Alessandro Paolini 2018-08-10 first draft, discussing with the provider

Alessandro Paolini 2018-11-02 plan finalised

Alessandro Paolini 2019-11-19 starting the yearly review....

Alessandro Paolini 2020-02-26 review completed

Alessandro Paolini, Greg Corbett 2021-03-30, 2021-04-19 yearly review; updated risk assessment section; updated Availability and Continuity test section