Difference between revisions of "Agenda-31-01-2011"
Jump to navigation
Jump to search
Line 27: | Line 27: | ||
* When EMI 1.0 is released, the current MW versions glite 3.2 and in principle ARC 0.8 will be supported until EMI 2.0 | * When EMI 1.0 is released, the current MW versions glite 3.2 and in principle ARC 0.8 will be supported until EMI 2.0 | ||
is released (due 30 April 2012). The major changes stated by A. di Meglio will imply a major peak of effort for the staged rollout | is released (due 30 April 2012). The major changes stated by A. di Meglio will imply a major peak of effort for the staged rollout | ||
and Early Adopter sites. | and Early Adopter sites. I have an [https://rt.egi.eu/rt/Ticket/Display.html?id=1012 RT ticket #1012] where comments and information is expected from | ||
the EAs about the impact they expect. | |||
===2 - Operational issues (all)=== | ===2 - Operational issues (all)=== |
Revision as of 02:29, 30 January 2011
Detailed agenda Grid Operations Meeting 31 January 2011
1 - Information, MW releases and Staged rollout (Mario)
1.1 - In staged rollout
- glite 3.1:
LFC no EA DPM 1 EA has found problems, a memory leak does anyone want to try it also
- glite 3.2:
VOMS 1 EA performing the test LFC Oracle 1 EA performing the test LFC mysql 1 EA performing the test L&B 1 EA performing the test
1.2 - Information
- Gathering of requirements for EMI 2.0 - deadline is 10 February
Middleware requirements Nagios requirement SA1 Survey
- EMI 1.0 (release date is 30 April 2011): Major changes with respect to the current situation - I deeply advise that you all take a very close
look at Alberto di Meglio's presentation in the last OMB.
- When EMI 1.0 is released, the current MW versions glite 3.2 and in principle ARC 0.8 will be supported until EMI 2.0
is released (due 30 April 2012). The major changes stated by A. di Meglio will imply a major peak of effort for the staged rollout and Early Adopter sites. I have an RT ticket #1012 where comments and information is expected from the EAs about the impact they expect.
2 - Operational issues (all)
3 - Operational Tools (Emir)
4 - COD issues (Malgorzata, Luuk)
5 - AOB
Back GridOpsMeeting