Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Agenda-31-01-2011"

From EGIWiki
Jump to navigation Jump to search
Line 19: Line 19:
* Gathering of requirements for EMI 2.0 - deadline is 10 February
* Gathering of requirements for EMI 2.0 - deadline is 10 February


Middleware requirements: [[https://wiki.egi.eu/wiki/Mw-requirements.html]]
[Middleware requirements: [https://wiki.egi.eu/wiki/Mw-requirements.html]]


Nagios requirement: [[https://wiki.egi.eu/wiki/Nagios-requirements.html]]
[Nagios requirement: [https://wiki.egi.eu/wiki/Nagios-requirements.html]]


SA1 Survey: [[https://wiki.egi.eu/wiki/EGI_Operations_Surveys]]
[SA1 Survey: [https://wiki.egi.eu/wiki/EGI_Operations_Surveys]]


===2 - Operational issues (all)===
===2 - Operational issues (all)===

Revision as of 23:55, 29 January 2011

Detailed agenda Grid Operations Meeting 31 January 2011

1 - Information, MW releases and Staged rollout (Mario)

1.1 - In staged rollout

  • glite 3.1:
LFC no EA
DPM 1 EA has found problems, a memory leak does anyone want to try it also
  • glite 3.2:
VOMS 1 EA performing the test
LFC Oracle 1 EA performing the test
LFC mysql 1 EA performing the test
L&B 1 EA performing the test

1.2 - Information

  • Gathering of requirements for EMI 2.0 - deadline is 10 February

[Middleware requirements: [1]]

[Nagios requirement: [2]]

[SA1 Survey: [3]]

2 - Operational issues (all)

3 - Operational Tools (Emir)

4 - COD issues (Malgorzata, Luuk)

5 - AOB


Back GridOpsMeeting