Difference between revisions of "Agenda-31-01-2011"
Jump to navigation
Jump to search
Line 14: | Line 14: | ||
LFC mysql 1 EA performing the test | LFC mysql 1 EA performing the test | ||
L&B 1 EA performing the test | L&B 1 EA performing the test | ||
====1.2 - Information==== | |||
* Gathering of requirements for EMI 2.0 - deadline is 10 February | |||
Middleware requirements: [[https://wiki.egi.eu/wiki/Mw-requirements.html]] | |||
Nagios requirement: [[https://wiki.egi.eu/wiki/Nagios-requirements.html]] | |||
SA1 Survey: [[https://wiki.egi.eu/wiki/EGI_Operations_Surveys]] | |||
===2 - Operational issues (all)=== | ===2 - Operational issues (all)=== |
Revision as of 23:54, 29 January 2011
Detailed agenda Grid Operations Meeting 31 January 2011
1 - Information, MW releases and Staged rollout (Mario)
1.1 - In staged rollout
- glite 3.1:
LFC no EA DPM 1 EA has found problems, a memory leak does anyone want to try it also
- glite 3.2:
VOMS 1 EA performing the test LFC Oracle 1 EA performing the test LFC mysql 1 EA performing the test L&B 1 EA performing the test
1.2 - Information
- Gathering of requirements for EMI 2.0 - deadline is 10 February
Middleware requirements: [[1]]
Nagios requirement: [[2]]
SA1 Survey: [[3]]
2 - Operational issues (all)
3 - Operational Tools (Emir)
4 - COD issues (Malgorzata, Luuk)
5 - AOB
Back GridOpsMeeting