Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Agenda-31-01-2011"

From EGIWiki
Jump to navigation Jump to search
Line 2: Line 2:


===1 - Information, MW releases and Staged rollout (Mario)===
===1 - Information, MW releases and Staged rollout (Mario)===
====1.1 - In staged rollout====


* glite 3.1:
* glite 3.1:
Line 11: Line 13:
  LFC Oracle 1 EA performing the test
  LFC Oracle 1 EA performing the test
  LFC mysql 1 EA performing the test
  LFC mysql 1 EA performing the test
L&B 1 EA performing the test


===2 - Operational issues (all)===
===2 - Operational issues (all)===

Revision as of 23:45, 29 January 2011

Detailed agenda Grid Operations Meeting 31 January 2011

1 - Information, MW releases and Staged rollout (Mario)

1.1 - In staged rollout

  • glite 3.1:
LFC no EA
DPM 1 EA has found problems, a memory leak does anyone want to try it also
  • glite 3.2:
VOMS 1 EA performing the test
LFC Oracle 1 EA performing the test
LFC mysql 1 EA performing the test
L&B 1 EA performing the test

2 - Operational issues (all)

3 - Operational Tools (Emir)

4 - COD issues (Malgorzata, Luuk)

5 - AOB


Back GridOpsMeeting