Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Agenda-28-10-2013

From EGIWiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Audio conference link Conference system is Adobe Connect, no password required.
Audio conference details Indico page



1. Middleware releases and staged rollout

1.1 News from URT

  • ARC: Major release on November 9th. There are small backward incompatibilities, ARC release team is bumping a new major version 4.x to mark that the new release is not backward compatible.
  • INFN, new release of several products expected at the end of October
    • CREAM core, SLURM plugin, Torque plugin and BLAH
      • Information system fix and other bug fixes
    • StoRM 1.11.3 bug fix release
    • VOMS server and client. CAnL support for the API, several bugs and issues fixed for the server.
  • EGCF: new release expected, 5.2.5. Mainly bug fixes, fix for the hanging gridftp server processes issue.
  • QCG: New release expected on November 15th featuring: SHA-2 support and information system integration with EGI. Several improvements in the clients.

1.2 Staged rollout updates

  • SAM update 22 is ready to be moved into production
  • CREAM, v.1.16.2 and BLAH v. 1.20.3:
    • contains fixes for several minor and major bugs.
    • Blah solves some memory issues of the SGE: sge_local_submit_attributes.sh.

1.3 Issue with the latest release of BDII in UMD-2

  • The UMD-2.7.0 update comes with a newer version of the glite-info-provider-ldap which changes the location of the glite-info-provider-ldap to /usr/libexec. Unfortunately some rpms haven't been updated (in contrast to UMD-3) to a version that can cope with that change resulting in a empty bdii! [GGUS]
    • Immediate solution: Update to UMD-3.
  • Emergency release of BDII in UMD-2 is being prepared due to some missing rpm's in repository

1.4 Proposal: UMD-2 security support

  • UMD-2 - formally - would end security support on April 2014.
  • SA2 proposes, starting from November 2013 to release only security updates for UMD-2
    • The number of early adopters deploying UMD-2 is reducing.
    • Updates from PT are less frequent for UMD-2.

2 Operational issues

2.1 Updates from DMSU

Unable to retrieve the output sandbox in a custom dir from a CREAM CE

see details in GGUS #98368

The command glite-ce-job-output with --dir option fails when the specified path contains 'special' chars, such as '=' or '.' .

$ glite-ce-job-output --dir /var/lib/gridprobes/lhcb.Role=production/emi.cream/CREAMCEDJS/ce208.cern.ch/jobOutput https://ce206.cern.ch:8443/CREAM023339075

2013-10-24 10:10:04,637 FATAL - Failed creation of directory [/var/lib/gridprobes/lhcb.Role=production/emi.cream/CREAMCEDJS/ce208.cern.ch/jobOutput/ce206.cern.ch_8443_CREAM023339075]: boost::filesystem::path: invalid name "lhcb.Role=production" in path: "/var/lib/gridprobes/lhcb.Role=production/emi.cream/CREAMCEDJS/ce208.cern.ch/jobOutput/ce206.cern.ch_8443_CREAM023339075"

This bug is present on EMI-2 UI and sl5 EMI-3 UI; the developers are investigating #CREAM-128

2.2 Glue validator alarms

ROD teams have been notified about the new probe that will generate alarms in the Operations Dashboard.

Peter has generated an Excel file containing the Site-BDIIs failing the probe on midmon, mapped into sites and NGIs. The real time status can be checked on midmon.

The possible date to turn on alarms is November 22nd, please contact sites who are failing the test and ask them to debug the problems and provide feedback if there are problems with the results. More information on glue-validator can be found in the manual page maintained by the developer. Remember to run it with the -k option to skip the known issues that cannot be solved at site level.

The glue-validator probe is not affecting AR statistics.

3. AOB

3.2 Next meeting

Proposed date for the next meeting is November 11th 2013, 14:00 CET

4. Minutes

minutes in indico