Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Agenda-28-02-2011"

From EGIWiki
Jump to navigation Jump to search
Line 46: Line 46:
* The new endpoint is: https://goc.egi.eu/gocdbpi/...
* The new endpoint is: https://goc.egi.eu/gocdbpi/...
* Discussions and progress with the developers on one side. Ops tools and Operations on the the other side
* Discussions and progress with the developers on one side. Ops tools and Operations on the the other side
====3.4 - EGI BROADCAST spam must be culled
As '''everything''' gets spammed with EGI BROADCASTs nowadays, the people getting them in 10-folds are
beginning to treat them as spam. Could the system be improved to not spam every mailing list
available for every single thing? As a ROD I'm currently getting 4 copies, some others are getting 14...
(Ulf Tigerstedt, NGI_NDGF and NGI_FI)


===4 - AOB===
===4 - AOB===

Revision as of 07:34, 24 February 2011

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security



Detailed Agenda

1 - Information (Mario)

2 - Staged Rollout (Mario)

2.1 - gLite 3.1

  • LFC and DPM 1.8.0-1 : all patches will be rejected since they have voms-api-c(pp) with mem leak, and new ones will be produced
  • FTS/FTM/FTA: are in certification.

2.2 - gLite 3.2

  • Ready for Certification, in Certification - Upcoming in the next few days to staged rollout:
    • L&B 2.1.10
    • Torque (utils, server, client)
    • UI 3.2.9
    • VOBOX 3.2.11
    • FTA/FTM/FTS 2.2.5
  • In staged rollout
    • WN 3.2.10 : No major problems found in staged rollout
    • glite-CLUSTER 3.2.2 : No major problems found in staged rollout

2.3 - Operational Tools

3 - Operational Issues (all)

3.1 - IGTF CA 1.38 and VOMS-ADMIN (Mario)

3.2 - Where to report problems/issues for SW in staged rollout (Mario)

3.3 - TopBDII has http://goc.gridops.org/gocdbpi/... hardwired, but this will be decommissioned (Mario)

====3.4 - EGI BROADCAST spam must be culled

As everything gets spammed with EGI BROADCASTs nowadays, the people getting them in 10-folds are beginning to treat them as spam. Could the system be improved to not spam every mailing list available for every single thing? As a ROD I'm currently getting 4 copies, some others are getting 14... (Ulf Tigerstedt, NGI_NDGF and NGI_FI)

4 - AOB

Next Grid Operations Meeting:

14 March 2011, 14h00 Amsterdam time