Difference between revisions of "Agenda-27-02-2012"
Jump to navigation
Jump to search
Line 22: | Line 22: | ||
=== 1.2 Staged Rollout === | === 1.2 Staged Rollout === | ||
==== UMD-1 | ==== UMD-1 ==== | ||
Preparing the products for the UMD1.6 by the end of March. | |||
Under staged rollout are: | |||
*EMI: | |||
**UNICORE XUUDB 1.3.3 | |||
**UNICORE Gateway 4.2.0 | |||
**UNICORE UVOS 1.5.0 | |||
*IGE: | |||
**Gridway 5.8.2 | |||
Under verification or to be verified: | |||
*EMI: | |||
**dCache 1.9.15 | |||
**BDII site 1.1.0 (includes BDI core 1.2.0) | |||
**Storm 1.8.2 | |||
**LFC Oracle 1.8.2 | |||
**UNICORE TSI 4.2.0 | |||
**UNICORE/X 4.2.0 | |||
*IGE: | |||
**GridFTP 5.2.0 | |||
**GRAM5 5.2.0 | |||
**RLS 5.2.0 | |||
**Myproxy 5.5.2 | |||
**GSISSH 4.3.4 | |||
**GridSAM 2.3.0 | |||
**GSISSHTerm 1.3.2 | |||
**SAGA 1.6.1 | |||
== 2. Operational Issues == | == 2. Operational Issues == |
Revision as of 13:12, 27 February 2012
Main | EGI.eu operations services | Support | Documentation | Tools | Activities | Performance | Technology | Catch-all Services | Resource Allocation | Security |
Detailed agenda: Grid Operations Meeting 27 February 2012 14h00 Amsterdam time
EVO direct link | Pwd: gridops |
EVO details | Indico page |
1. Middleware releases and staged rollout
1.1 EMI-1 release status
1.2 Staged Rollout
UMD-1
Preparing the products for the UMD1.6 by the end of March.
Under staged rollout are:
- EMI:
- UNICORE XUUDB 1.3.3
- UNICORE Gateway 4.2.0
- UNICORE UVOS 1.5.0
- IGE:
- Gridway 5.8.2
Under verification or to be verified:
- EMI:
- dCache 1.9.15
- BDII site 1.1.0 (includes BDI core 1.2.0)
- Storm 1.8.2
- LFC Oracle 1.8.2
- UNICORE TSI 4.2.0
- UNICORE/X 4.2.0
- IGE:
- GridFTP 5.2.0
- GRAM5 5.2.0
- RLS 5.2.0
- Myproxy 5.5.2
- GSISSH 4.3.4
- GridSAM 2.3.0
- GSISSHTerm 1.3.2
- SAGA 1.6.1
2. Operational Issues
2.2 Service/Site decommissioning procedures
3. AOB
3.2 Next meetings
12 March 2012, h14:00 Amsterdam time.