Difference between revisions of "Agenda-26-09-2011"
Jump to navigation
Jump to search
Line 47: | Line 47: | ||
*FTS 2.2.5: still in same situation as 2 weeks ago, no EA | *FTS 2.2.5: still in same situation as 2 weeks ago, no EA | ||
==== 1.2.2 UMD1 ==== | ==== 1.2.2 UMD1 ==== | ||
*Staged rollout state: | |||
**EMI-MPI 1.0.1: issues found in staged rollout, will be waiting for the next update to fix them | *Staged rollout state: | ||
**WMS 3.3.3: Two main issues found. | **EMI-MPI 1.0.1: issues found in staged rollout, will be waiting for the next update to fix them | ||
**WMS 3.3.3: Two main issues found: | |||
***Stability problems when DLI is used in the JDL, affects only some limited use cases. | |||
***Purging of proxy dirs: EMI WMS stops accepting jobs after 31999th submission for the same DN, this is due to a limit of the number of entries in the inode for ext3 filesystems. | |||
=== 1.3 Interoperability === | === 1.3 Interoperability === |
Revision as of 14:01, 26 September 2011
Main | EGI.eu operations services | Support | Documentation | Tools | Activities | Performance | Technology | Catch-all Services | Resource Allocation | Security |
Detailed agenda: Grid Operations Meeting 26 September 2011 14h00 Amsterdam time
EVO direct link | Pwd: gridops |
EVO details | Indico page |
1. Middleware releases and staged rollout
1.1 EMI-1 release status
EMI-1 Update 7
Released on 22 September 2011: Release page
- Minor releases
- ARGUS, v. 1.4.0 : Unbundled some libraries: voms-api, trustmanager, bouncy-castle. New configuration for log files.
- UNICORE TSI & UNCIRE/X, v. 6.4.1: bug fixes and improvements
- Revision releases
- CEMon, v. 1.13.2 : Bug fixes
- gLExec-wn, v. 1.0.1 : Bug fixes (Mitigation for: Proxy Path Length error code)
- UNICORE client, v. 6.4.1 : Improvements.
EMI-1 future work
EMI tasks expected for middle October
- glite-MPI v. 1.1.0
- GFAL/lcg_util v.1.11.19
- StoRM SE v.1.7.2
- LFC v. 1.8.2
- DPM v. 1.8.2
- APEL parsers v.1.0.1
- Hydra v.1.0.1
1.2 Staged Rollout (Mario)
1.2.1 gLite 3.2
- CREAM 1.6.7: staged rollout almost finished
- FTS 2.2.5: still in same situation as 2 weeks ago, no EA
1.2.2 UMD1
- Staged rollout state:
- EMI-MPI 1.0.1: issues found in staged rollout, will be waiting for the next update to fix them
- WMS 3.3.3: Two main issues found:
- Stability problems when DLI is used in the JDL, affects only some limited use cases.
- Purging of proxy dirs: EMI WMS stops accepting jobs after 31999th submission for the same DN, this is due to a limit of the number of entries in the inode for ext3 filesystems.
1.3 Interoperability
2. Operational Issues
gLite 3.2 critical bugs and patches
3. AOB
3.3 Next meetings
10 October 2011