Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Agenda-26-09-2011"

From EGIWiki
Jump to navigation Jump to search
Line 23: Line 23:
*FTS 2.2.5: still in same situation as 2 weeks ago, no EA
*FTS 2.2.5: still in same situation as 2 weeks ago, no EA


==== 1.2.2 UMD1 ====
==== 1.2.2 UMD1 ====
*Staged rollout state:
**EMI-MPI 1.0.1: issues found in staged rollout, will be waiting for the next update to fix them
**WMS 3.3.3: Two main issues found.


=== 1.3 Interoperability  ===
=== 1.3 Interoperability  ===

Revision as of 13:05, 26 September 2011

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security



Detailed agenda: Grid Operations Meeting 26 September 2011 14h00 Amsterdam time

EVO direct link Pwd: gridops
EVO details Indico page

1. Middleware releases and staged rollout

1.1 EMI-1 release status (Cristina)

1.2 Staged Rollout (Mario)

1.2.1 gLite 3.2

  • CREAM 1.6.7: staged rollout almost finished
  • FTS 2.2.5: still in same situation as 2 weeks ago, no EA

1.2.2 UMD1

  • Staged rollout state:
    • EMI-MPI 1.0.1: issues found in staged rollout, will be waiting for the next update to fix them
    • WMS 3.3.3: Two main issues found.

1.3 Interoperability

2. Operational Issues

gLite 3.2 critical bugs and patches

3. AOB

3.3 Next meetings

10 October 2011