Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Agenda-24-09-2012

From EGIWiki
Revision as of 10:42, 24 September 2012 by David (talk | contribs)
Jump to navigation Jump to search
EVO direct link Pwd: gridops
EVO details Indico page

1. Middleware releases and staged rollout

1.1. Update on the status of EMI updates

1.2. Staged Rollout

The IGTF trusted CA's have passed the verification process and are to be staged rollout today.

For UMD1 update, we have the following in staged rollout

  • IGE SAGA 1.6.1: EA has accepted the test.
  • IGE GridSafe: waiting integration into APEL accounting.
  • IGE GridSAM: No EA, continues on hold in staged rollout.

For UMD2 update now planed to be released on the 8 of October:

  • In UMDStore area (SW provisioning complete):
    • CREAM SGE 2.0.0 module
    • LB 3.2.6: though a new update (3.2.7) is in the verification process, that may deprecate the 3.2.6

2. Operational Issues

3. AOB

3.1 Next meeting