Difference between revisions of "Agenda-24-04-2013"
Jump to navigation
Jump to search
(7 intermediate revisions by the same user not shown) | |
(No difference)
|
Latest revision as of 17:11, 3 May 2013
Audio conference link | Conference system is Adobe Connect, no password required. |
Audio conference details | Indico page |
1. Middleware releases and staged rollout
1.1. Update on the status of EMI updates
1.2. Staged Rollout
- UMD-2 released:
- Ready for production
- EMI: Cream 1.14.3 ; Wms 3.4.1.
- IGE : Gsisshterm - 1.3.4; Gram5 - 5.2.3;
- Ready for production
- EMI WN tarball:
- SL5 already in production: REPO
- SL6 need people to test if interested contact me or Matt Doidge;
- EMI UI tarball:
- Like for SL6 WN need people to test it.
- UMD-3 released:
- Products ready to be released: WMS, UI, WN, L&B, DPM, ARGUS, BDII's ...
- CREAM under verification
- STORM and VOMS have failed during Software Provisioning so we do not recommend sites to install them:
- Under preparation a wiki with the issues found during Software Provisioning regarding the upgrades from EMI-2 to EMI-3
2. Operational Issues
2.2 Updates from DMSU
no particular issue to report
2.3 Top-BDII change in resource requirements
As a follow up of the performance issues reported in this ggus ticket, the Top-BDII product team updated the hardware requirements of the product. The wide deployment of GLUE2 increased the amount of data handled by the Top-BDIIs and triggered this new set of requirements. The new hardware requirements are available in the Top-BDII admin guide:
- Min dual core CPU (4 cores advised)
- Min 4GB ram (6GB advised)
- 10 GB disk space
3. AOB
3.2 Next meeting
Proposed date for the next meeting is May 6th 2013, 14:00 CEST