Difference between revisions of "Agenda-24-04-2013"
Jump to navigation
Jump to search
Line 21: | Line 21: | ||
** IGE : Gsisshterm - 1.3.4; Gram5 - 5.2.3; | ** IGE : Gsisshterm - 1.3.4; Gram5 - 5.2.3; | ||
* EMI WN tarball | * EMI WN tarball: | ||
** | ** SL5 already in production: [http://repository.egi.eu/mirrors/EMI/tarball/production/sl5/emi2-emi-wn/ REPO] | ||
** SL6 need people to test if interested contact me or Matt Doidge; | |||
* | * EMI UI tarball: | ||
** | ** Like for SL6 WN need people to test it. | ||
* UMD-3 released: | |||
** | |||
** Still undergoing campaign for Early Adopters. | ** Still undergoing campaign for Early Adopters. | ||
** | ** Products ready to be released: WMS, UI, WN, L&B, DPM, ARGUS, BDII's ... | ||
* | * Under preparation a wiki with the issues found during Software Provisioning regarding the upgrades from EMI-2 to EMI-3 | ||
=== 2. Operational Issues === | === 2. Operational Issues === |
Revision as of 11:36, 24 April 2013
Audio conference link | Conference system is Adobe Connect, no password required. |
Audio conference details | Indico page |
1. Middleware releases and staged rollout
1.1. Update on the status of EMI updates
1.2. Staged Rollout
- UMD-2 released:
- Ready for production
- EMI: Cream 1.14.3 ; Wms 3.4.1.
- IGE : Gsisshterm - 1.3.4; Gram5 - 5.2.3;
- Ready for production
- EMI WN tarball:
- SL5 already in production: REPO
- SL6 need people to test if interested contact me or Matt Doidge;
- EMI UI tarball:
- Like for SL6 WN need people to test it.
- UMD-3 released:
- Still undergoing campaign for Early Adopters.
- Products ready to be released: WMS, UI, WN, L&B, DPM, ARGUS, BDII's ...
- Under preparation a wiki with the issues found during Software Provisioning regarding the upgrades from EMI-2 to EMI-3
2. Operational Issues
2.2 Updates from DMSU
no particular issue to report