Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Agenda-22-08-2011

From EGIWiki
Revision as of 16:54, 29 November 2012 by Krakow (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security

Detailed agenda: Grid Operations Meeting 22 August 2011 11h00 Amsterdam time

EVO direct link Pwd: gridops
EVO details Indico page

1. Middleware releases and staged rollout

1.1 EMI-1 release status (Cristina)

1.2 Staged Rollout (Mario)

1.2.1 gLite 3.2

  • FTS 2.2.5: no EA has picked it up

1.2.2 UMD1

  • In staged rollout (from EMI):
    • MPI 1.0.1
    • CREAM 1.13.2
    • ARC-Clients 1.0.1
    • ARC-CE 1.0.1
  • In staged rollout (from IGE - Globus 5.0.3):
    • MyPROXY
    • RLS
    • GridFTP
    • DefaultSecurity

The following products are under verification and expected during this week to go into staged rollout:

  • ARGUS 1.3.1
  • ARC-Infosys 1.0.1
  • VOMS 2.0.1
  • WMS 3.3.2
  • AMGA 2.1.2

All the previous products are candidates to be included in the UMD1.2 release due on the 12 of September, plus:

  • dCache 1.9.12-2 : Staged rollout done last week and already set to be included in the UMD release.

WMS 3.3.3 is due to be released in EMI update 6 on the 1st of September. This is considered an urgent update and will get high priority in verification and staged rollout in order to be a candidate to inclusion in UMD1.2 .

1.3 Interoperability

MS414 status.

UNICORE

Globus

Need for a dedicated Globus staged-rollout meeting?

2. Operational Issues

2.1 gLite 3.2 critical bugs & patches

3. AOB

3.1 gLite 3.1 deployed components

Table of glite3.1 supporting status: Agenda 18 July

  • Received, so far, assessments from 3 NGIs: no constrains to upgrade to gLite 3.2 or EMI (SL5).

3.3 Next meetings

12 September 2011