Difference between revisions of "Agenda-22-07-2013"
Jump to navigation
Jump to search
Line 16: | Line 16: | ||
=== 1.2 Staged rollout updates === | === 1.2 Staged rollout updates === | ||
* | * List of products in SR: | ||
** EMI.unicore-hila - 2.4.0 | ** EMI.unicore-hila - 2.4.0 | ||
Line 24: | Line 24: | ||
** EMI.unicorex6 - 6.0.1 | ** EMI.unicorex6 - 6.0.1 | ||
** IGE.globus-default-security - 5.2.4 | ** IGE.globus-default-security - 5.2.4 | ||
** EMI.cream - 1.15.2 | ** EMI.cream - 1.15.2 | ||
** EMI.cream-ge - 2.0.2 | ** EMI.cream-ge - 2.0.2 | ||
* Updates | |||
** EMI.lb.sl6.x86_64-4.0.11 | ** EMI.lb.sl6.x86_64-4.0.11 | ||
*** Gridsite 2.1.0 issue which makes 30% of the jobs to be aborted. | *** Gridsite 2.1.0 issue which makes 30% of the jobs to be aborted [https://ggus.eu/ws/ticket_info.php?ticket=95882 GGUS] | ||
*** Also afects EMI-2 products (gridsite 1.7.26) [https://ggus.eu/ws/ticket_info.php?ticket=95559 GGUS] | |||
** IGE.gridway - 5.14.0 | |||
*** SL6 rejected in verification due to dependencies problems found [https://ggus.eu/ws/ticket_info.php?ticket=95740 GGUS] | |||
=== 2 Operational issues === | === 2 Operational issues === |
Revision as of 16:39, 19 July 2013
Audio conference link | Conference system is Adobe Connect, no password required. |
Audio conference details | Indico page |
1. Middleware releases and staged rollout
1.1 News from URT
1.2 Staged rollout updates
- List of products in SR:
- EMI.unicore-hila - 2.4.0
- EMI.fts - 2.2.9
- EMI.argus - 1.6.1
- EMI.glexec-wn - 1.2.1
- EMI.unicorex6 - 6.0.1
- IGE.globus-default-security - 5.2.4
- EMI.cream - 1.15.2
- EMI.cream-ge - 2.0.2
- Updates
2 Operational issues
2.1 Updates from DMSU
3. AOB
3.2 Next meeting
Proposed date for the next meeting is August 19th 2013, 14:00 CEST