Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Agenda-21-11-2011

From EGIWiki
Jump to navigation Jump to search
Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security



Detailed agenda: Grid Operations Meeting 21 November 2011 14h00 Amsterdam time

EVO direct link Pwd: gridops
EVO details Indico page

1. Middleware releases and staged rollout

1.1 EMI-1 release status

External summary wiki page provided by Cristina (EMI): twiki

1.2 Staged Rollout (Mario)

1.2.1 gLite 3.2

1.2.2 UMD1

2. Operational Issues

2.1 Site configuration in GOCDB

Some sites were not showing in the Top-BDII GLUE2.0 branch, even if the Site-BDII is GLUE2 enabled. It was a site configuration issue in GOCDB, please find more information here

  • GGUS ticket opened vs Sites with GLUE2 Site-BDII and wrong GOCDB configuration.
  • Please, disseminate this information across the sites, in this way when they will install a GLUE2 Site-BDII there will not be issues.

2.2 LDAP dependencies in BDII

As reported in the Operations Meeting on October 24th the Site-BDII is still installed with openldap-servers v.2.3, this is true for both EMI and gLite3.2 versions of the software. Site admins need to manually upgrade the openldap RPMs to openldap2.4-servers.

Note: the dependency to openldap 2.4 will be added in the next release of the Site-BDII, for EMI-2.

2.3 Sites "candidate" or "suspended"

As discussed in the May 2011 OMB, the sites in suspended or candidate status for too long should be closed. We still have a large number of sites in this situation, you can find the lists of sites in those statuses from the Performance page.

As requested in this GGUS ticket, all sites to which on 01 January 2012 the following conditions apply, will be closed by COD:

  • site entered suspension/candidate status before 01 June 2011
  • no ticket was sent to COD to request an extension of the deadline

If there are technical reason to extend the deadline for specific sites, NGI are kindly requested to open a GGUS ticket to COD - explaining those reasons and providing a timeline for the site reintegration - before December 31st 2011.

3. AOB

3.1 Manual to review

3.2 Next meetings

12 December 2011 h 14:00