Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Agenda-20-01-2012"

From EGIWiki
Jump to navigation Jump to search
Line 43: Line 43:


As usual attached to the December Availability/Reliability you can find the Availability report for the NGI's Core services (that are Top-BDIIs): [https://documents.egi.eu/public/RetrieveFile?docid=959&version=1&filename=EGI-core_services_availabilities-per_NGI-Dec2011.pdf December Top-BDII table].
As usual attached to the December Availability/Reliability you can find the Availability report for the NGI's Core services (that are Top-BDIIs): [https://documents.egi.eu/public/RetrieveFile?docid=959&version=1&filename=EGI-core_services_availabilities-per_NGI-Dec2011.pdf December Top-BDII table].
* Already opened GGUS vs underperforming NGIs
* Starting from January 2012 Top-BDII below the 99% availability threshold will trigger an official follow-up and NGIs will be requested to ''provide a plan'' to improve the service level they are delivering with their Top-BDIIs
** From a configuration point of view, the options are described in this manual: [[MAN05]]
** Small NGIs could agree to use their Top-BDIIs in a failover configuration at client-side.


== 3. AOB  ==
== 3. AOB  ==

Revision as of 13:38, 20 January 2012

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security



Detailed agenda: Grid Operations Meeting 20 January 2012 14h00 Amsterdam time

EVO direct link Pwd: gridops
EVO details Indico page

1. Middleware releases and staged rollout

1.1 EMI-1 release status

1.2 Staged Rollout

The UMD1.5 release freeze is next Monday 23 Jan, and the release occurs 1 week later on the 30 January. See https://wiki.egi.eu/wiki/UMD_Release_Schedule

The current products to be included are:

  • L&B 3.1.0 - waiting for the staged rollout report
  • DPM mysql 1.8.2 - 1 report delivered, waiting for the other reports
  • MPI 1.2.0 - under staged rollout, reports should arive only next Monday
  • Storm 1.8.1 - waiting for the staged rollout report
  • WMS 3.3.4 - waiting for the staged rollout report
  • GE utils 1.0.0 - SW provisioning completed: first release
  • LFC mysql 1.8.2 - SW provisioning completed
  • CREAM 1.13.3 - SW provisioning completed : Includes the components
    • BLAH 1.16.4 - pre-testing has been done, today n staged rollout, waiting for the reports
    • CEMON 1.13.3 - SW provisioning completed
    • APEL parsers 1.0.1 - SW provisioning completed

2. Operational Issues

2.1 Requirements and Surveys

2.2 Underperforming Top-BDII

As usual attached to the December Availability/Reliability you can find the Availability report for the NGI's Core services (that are Top-BDIIs): December Top-BDII table.

  • Already opened GGUS vs underperforming NGIs
  • Starting from January 2012 Top-BDII below the 99% availability threshold will trigger an official follow-up and NGIs will be requested to provide a plan to improve the service level they are delivering with their Top-BDIIs
    • From a configuration point of view, the options are described in this manual: MAN05
    • Small NGIs could agree to use their Top-BDIIs in a failover configuration at client-side.

3. AOB

3.2 Next meetings