Difference between revisions of "Agenda-20-01-2012"

From EGIWiki
Jump to navigation Jump to search
 
(7 intermediate revisions by 4 users not shown)
Line 1: Line 1:
{{Template:Op menubar}}  
{{Template:Op menubar}}  
[[Category:Grid Operations Meetings]]


= Detailed agenda: Grid Operations Meeting 20 January 2012 14h00 Amsterdam time  =
= Detailed agenda: Grid Operations Meeting 20 January 2012 14h00 Amsterdam time  =
Line 21: Line 23:
=== 1.2 Staged Rollout  ===
=== 1.2 Staged Rollout  ===


====glite 3.2====
==== glite 3.2 ====
*Torque: https://savannah.cern.ch/patch/?5169
 
Fix of security vulnerabilities
 
*Torque: https://savannah.cern.ch/patch/?5169  
*APEL: https://savannah.cern.ch/patch/?5137
*APEL: https://savannah.cern.ch/patch/?5137


====UMD====
====UMD====
The UMD1.5 release freeze is next Monday 23 Jan, and the release occurs 1 week later on the 30 January. See https://wiki.egi.eu/wiki/UMD_Release_Schedule  
The UMD1.5 release freeze is next Monday 23 Jan, and the release occurs 1 week later on the 30 January. See [[UMD_Release_Schedule ]]


The current products to be included are:  
The current products to be included are:  
Line 59: Line 64:
== 3. AOB  ==
== 3. AOB  ==


=== 3.1 ActiveMQ Upgrade ===
ActiveMQ upgrade planned for '''30&31 January 2012''' with the following schedule:
* CERN1 + AUTH on 30th January (11 am - 12 pm)
* CERN2 + SRCE on 31th January (12 pm - 1 pm)
Two stage upgrade in order to avoid service disruption.
Changes:
* ActiveMQ 5.5.1-fuse-01-20, release notes are here: http://fusesource.com/wiki/display/ProdInfo/FUSE+Message+Broker+v5.5.1-fuse+Release+Notes
* Camel routes switched off, SAM to use wildcard subscriptions instead.
* Automatic closing of inactive STOMP connections after '''one hour'''. <br>Note: Inactive connections are overloading brokers and currently we clear them manually periodically. Clients will reconnect automatically.


=== 3.2 Next meetings  ===
=== 3.2 Next meetings  ===
[[Category:GridOpsMeeting]]

Latest revision as of 16:19, 29 November 2012

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security

Detailed agenda: Grid Operations Meeting 20 January 2012 14h00 Amsterdam time

EVO direct link Pwd: gridops
EVO details Indico page

1. Middleware releases and staged rollout

1.1 EMI-1 release status

1.2 Staged Rollout

glite 3.2

Fix of security vulnerabilities

UMD

The UMD1.5 release freeze is next Monday 23 Jan, and the release occurs 1 week later on the 30 January. See UMD_Release_Schedule

The current products to be included are:

  • L&B 3.1.0 - waiting for the staged rollout report
  • DPM mysql 1.8.2 - 1 report delivered, waiting for the other reports
  • MPI 1.2.0 - under staged rollout, reports should arive only next Monday
  • Storm 1.8.1 - waiting for the staged rollout report
  • WMS 3.3.4 - waiting for the staged rollout report
  • GE utils 1.0.0 - SW provisioning completed: first release
  • LFC mysql 1.8.2 - SW provisioning completed
  • CREAM 1.13.3 - SW provisioning completed : Includes the components
    • BLAH 1.16.4 - pre-testing has been done, today n staged rollout, waiting for the reports
    • CEMON 1.13.3 - SW provisioning completed
    • APEL parsers 1.0.1 - SW provisioning completed

2. Operational Issues

2.1 Requirements and Surveys

2.2 Underperforming Top-BDII

As usual attached to the December Availability/Reliability you can find the Availability report for the NGI's Core services (that are Top-BDIIs): December Top-BDII table.

  • Already opened GGUS vs underperforming NGIs
  • Starting from January 2012 Top-BDII below the 99% availability threshold will trigger an official follow-up and NGIs will be requested to provide a plan to improve the service level they are delivering with their Top-BDIIs
    • From a configuration point of view, the options are described in this manual: MAN05
    • Tip: Small NGIs could agree to use their Top-BDIIs in a failover configuration at client-side.

3. AOB

3.1 ActiveMQ Upgrade

ActiveMQ upgrade planned for 30&31 January 2012 with the following schedule:

  • CERN1 + AUTH on 30th January (11 am - 12 pm)
  • CERN2 + SRCE on 31th January (12 pm - 1 pm)

Two stage upgrade in order to avoid service disruption.

Changes:

3.2 Next meetings