Difference between revisions of "Agenda-14-03-2011"
Line 62: | Line 62: | ||
** FTS/A/M 2.2.5 | ** FTS/A/M 2.2.5 | ||
* In staged rollout | * In staged rollout | ||
** TopBDII 5.1.22: under test | ** TopBDII 5.1.22: under test - '''Contains the updated GOCDB url'''. | ||
** SiteBDII 5.1.22: under test | ** SiteBDII 5.1.22: under test | ||
** VOBOX 3.2.11: in staged rollout | ** VOBOX 3.2.11: in staged rollout | ||
Line 70: | Line 70: | ||
===2.3 - Operational Tools=== | ===2.3 - Operational Tools=== | ||
* Staged rollout of SAM update 9 https://rt.egi.eu/rt/Ticket/Display.html?id=1281 | * Staged rollout of SAM update 9 https://rt.egi.eu/rt/Ticket/Display.html?id=1281 | ||
** | ** SAM-U9 successfully released on 08/03/2011 | ||
==3 - Operational Issues (all)== | ==3 - Operational Issues (all)== |
Revision as of 18:18, 10 March 2011
Detailed Agenda
1 - Information (Mario)
1.1 - Update on status of the EMI 1.0 release
C. Aiftimiei (EMI release manager) will update the operations community about the current status of the EMI 1.0 release.
1.2 - Transition from lcg-CE to CREAM-CE
Mail from Gergely Sipos March 1 (snippet):
LCG-CE hosts are gradually being replaced by CREAM-CEs within EGI the gLite developer consortium has decided to focus its effort on the CREAM-CE and terminate support for the LCG-CE software. The exact schedule is still under discussion, but the LCG-CE software will likely reach its end of support during the summer of 2011.
In order to help EGI user communities prepare to work with CREAM-CEs, the Operations and User Support teams of EGI.eu have prepared an information page about the CREAM-CE software and about the transfer of applications from LCG-CE to CREAM-CE:
https://wiki.egi.eu/wiki/FAQ:_lcg-ce_to_cream-ce, Support team: ucst@egi.eu
1.3 - gLite 3.1 CREAM reahed end of life
Mail from Tiziana March 1
1.4 - phasing out of EGEE Grid name
Mail from Tiziana March 3
Instructions are available at: https://wiki.egi.eu/wiki/MAN1_How_to_publish_Site_Information
As of March 10: 168 sites still publish EGEE (http://gstat.egi.eu/gstat/summary/GRID/EGEE/)
Every NGI is requested to follow-up this issue internally with the respective sites.
1.5 - Decomissioning of the old SAM infrastructure
EGI Broadcast March 7
Decommission the old SAM infrastructure by the end of June 2011.
Document which describes the new programmatic interface:
List of machines which are contacting old SAM (Nagioses excluded):
https://tomtools.cern.ch/confluence/display/SAM/List+of+hosts+using+the+old+system
Every NGI is requested to follow-up this issue internally with the respective sites.
2 - Staged Rollout (Mario)
2.1 - gLite 3.1
- FTS/FTM/FTA 2.2.5: are in certification.
- Torque_Utils: in staged rollout
2.2 - gLite 3.2
- Ready for Certification, in Certification - Upcoming in the next few days to staged rollout:
- L&B 2.1.11
- Torque_utils: re certification because of configuration issues
- FTS/A/M 2.2.5
- In staged rollout
- TopBDII 5.1.22: under test - Contains the updated GOCDB url.
- SiteBDII 5.1.22: under test
- VOBOX 3.2.11: in staged rollout
- UI 3.2.9: in staged rollout
- Torque clients/server: The Torque utils has configuration issues, and are being solved by the developer.
2.3 - Operational Tools
- Staged rollout of SAM update 9 https://rt.egi.eu/rt/Ticket/Display.html?id=1281
- SAM-U9 successfully released on 08/03/2011
3 - Operational Issues (all)
3.1 Jobs work directory and temportary directory
We would like to discuss and finalize a long-standing issue which affects the LRMS administrators, concerning the management of the job work directory and the usage of temporary directories. A proposal is presented for discussion.
4 - AOB
Next Grid Operations Meeting:
28 March 2011, 14h00 Amsterdam time