Difference between revisions of "Agenda-14-03-2011"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
==1 - Information (Mario)== | ==1 - Information (Mario)== | ||
==2 - Staged Rollout (Mario)== | ==2 - Staged Rollout (Mario)== | ||
===2.1 - gLite 3.1=== | ===2.1 - gLite 3.1=== | ||
* FTS/FTM/FTA 2.2.5: are in certification. | |||
* FTS/FTM/FTA: are in certification. | * Torque_Utils: in staged rollout | ||
===2.2 - gLite 3.2=== | ===2.2 - gLite 3.2=== | ||
Line 26: | Line 19: | ||
** TopBDII 5.1.22: under test | ** TopBDII 5.1.22: under test | ||
** SiteBDII 5.1.22: under test | ** SiteBDII 5.1.22: under test | ||
** VOBOX 3.2.11 | ** VOBOX 3.2.11: in staged rollout | ||
** UI 3.2.9 | ** UI 3.2.9: in staged rollout | ||
** Torque clients/server: The Torque utils has configuration issues, and are being solved by the developer. | ** Torque clients/server: The Torque utils has configuration issues, and are being solved by the developer. | ||
Revision as of 17:23, 10 March 2011
Detailed Agenda
1 - Information (Mario)
2 - Staged Rollout (Mario)
2.1 - gLite 3.1
- FTS/FTM/FTA 2.2.5: are in certification.
- Torque_Utils: in staged rollout
2.2 - gLite 3.2
- Ready for Certification, in Certification - Upcoming in the next few days to staged rollout:
- L&B 2.1.11
- Torque_utils: re certification because of configuration issues
- FTS/A/M 2.2.5
- In staged rollout
- TopBDII 5.1.22: under test
- SiteBDII 5.1.22: under test
- VOBOX 3.2.11: in staged rollout
- UI 3.2.9: in staged rollout
- Torque clients/server: The Torque utils has configuration issues, and are being solved by the developer.
2.3 - Operational Tools
- Staged rollout of SAM update 9 https://rt.egi.eu/rt/Ticket/Display.html?id=1281
- Problems found in the test, in contact with developers.
3 - Operational Issues (all)
3.1
4 - AOB
Next Grid Operations Meeting:
28 March 2011, 14h00 Amsterdam time