(Created page with '==Detailed Agenda== ===1 - Information (Mario)=== * Staged rollout wiki and procedures updated: ** https://wiki.egi.eu/wiki/Staged-Rollout ** https://wiki.egi.eu/wiki/Staged-ro…') |
|||
Line 1: | Line 1: | ||
=Detailed Agenda= | |||
==1 - Information (Mario)== | |||
* Staged rollout wiki and procedures updated: | * Staged rollout wiki and procedures updated: | ||
Line 12: | Line 12: | ||
* '''All components of glite 3.2 are presently covered by EAs, except the tarballs WN and UI, thus need teams to cover them''' | * '''All components of glite 3.2 are presently covered by EAs, except the tarballs WN and UI, thus need teams to cover them''' | ||
==2 - Staged Rollout (Mario)== | |||
===2.1 - gLite 3.1=== | |||
* LFC and DPM 1.8.0-1 : all patches will be rejected since they have voms-api-c(pp) with mem leak, and new ones will be produced | * LFC and DPM 1.8.0-1 : all patches will be rejected since they have voms-api-c(pp) with mem leak, and new ones will be produced | ||
* FTS/FTM/FTA: are in certification. | * FTS/FTM/FTA: are in certification. | ||
===2.2 - gLite 3.2=== | |||
* Ready for Certification, in Certification - Upcoming in the next few days to staged rollout: | * Ready for Certification, in Certification - Upcoming in the next few days to staged rollout: | ||
** L&B 2.1.10 | ** L&B 2.1.10 | ||
Line 31: | Line 31: | ||
** Problem reported by LHCb with CREAM 1.6.4 - there was an urgent fix that went through staged rollout in a very short time (less then 1 day). New version CREAM 1.6.5 | ** Problem reported by LHCb with CREAM 1.6.4 - there was an urgent fix that went through staged rollout in a very short time (less then 1 day). New version CREAM 1.6.5 | ||
===2.3 - Operational Tools=== | |||
* Staged rollout of SAM update 9 https://rt.egi.eu/rt/Ticket/Display.html?id=1281 | * Staged rollout of SAM update 9 https://rt.egi.eu/rt/Ticket/Display.html?id=1281 | ||
** Problems found in the test, in contact with developers. | ** Problems found in the test, in contact with developers. | ||
==3 - Operational Issues (all)== | |||
===3.1 === | |||
===4 - AOB=== | ===4 - AOB=== | ||
Line 72: | Line 43: | ||
Next Grid Operations Meeting: | Next Grid Operations Meeting: | ||
28 March 2011, 14h00 Amsterdam time |
Revision as of 16:04, 10 March 2011
Detailed Agenda
1 - Information (Mario)
- Staged rollout wiki and procedures updated:
- New Early Adopters portal (updated): https://www.egi.eu/earlyAdopters/
- Work in progress to implement all needed features in the staged-rollout RT queue, for the staged rollout tests
- All components of glite 3.2 are presently covered by EAs, except the tarballs WN and UI, thus need teams to cover them
2 - Staged Rollout (Mario)
2.1 - gLite 3.1
- LFC and DPM 1.8.0-1 : all patches will be rejected since they have voms-api-c(pp) with mem leak, and new ones will be produced
- FTS/FTM/FTA: are in certification.
2.2 - gLite 3.2
- Ready for Certification, in Certification - Upcoming in the next few days to staged rollout:
- L&B 2.1.10
- Torque (utils, server, client)
- UI 3.2.9
- VOBOX 3.2.11
- FTA/FTM/FTS 2.2.5
- In staged rollout
- WN 3.2.10 : No major problems found in staged rollout
- glite-CLUSTER 3.2.2 : No major problems found in staged rollout
- Urgent fix in CREAM
- Problem reported by LHCb with CREAM 1.6.4 - there was an urgent fix that went through staged rollout in a very short time (less then 1 day). New version CREAM 1.6.5
2.3 - Operational Tools
- Staged rollout of SAM update 9 https://rt.egi.eu/rt/Ticket/Display.html?id=1281
- Problems found in the test, in contact with developers.
3 - Operational Issues (all)
3.1
4 - AOB
Next Grid Operations Meeting:
28 March 2011, 14h00 Amsterdam time