Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Agenda-14-02-2011"

From EGIWiki
Jump to navigation Jump to search
Line 40: Line 40:
** Condor: PIC?
** Condor: PIC?
** LSF: CERN?, Padova?
** LSF: CERN?, Padova?
* Major changes in procedures, tools, repositories, affecting sites should be announced well in advance (2 weeks or so):
** The example of the latest lcg-CA release.


===3 - Operational Tools (Emir)===
===3 - Operational Tools (Emir)===

Revision as of 11:54, 11 February 2011

Detailed agenda Grid Operations Meeting 14 February 2011

1 - Information, MW releases and Staged rollout (Mario)

1.1 - In staged rollout

  • glite 3.1:
    • Upcoming soon (possibly this week):
In Certification FTS/A/M 2.2.5
    • In staged rollout:
LFC no EA
DPM 1 EA has found problems, a memory leak does anyone want to try it also
    • Ready for release - staged rollout OK:
lcg-CE 3.1.46
glite-CLUSTER 3.1.4

We will have to evaluate if the LFC and DPM be released into production anyway, since it's the last release of those components in glite 3.1, and the current production release "suffers" from the same problem of memory leak.

  • glite 3.2:
    • Upcoming soon (possibly this week):
Ready for Certification LB 2.1.20
Ready for Certification UI 3.2.9
In Certification WN 3.2.10
In Certification FTS/A/M 2.2.5
    • In staged rollout:
glite-CLUSTER 3.2.2 (No Early Adopter)


1.2 - Information

  • Gathering of requirements for EMI 2.0 - deadline was 10 February
  • The staged rollout wiki Staged-Rollout has been updated, and Staged-rollout-procedures contains information about the procedures/steps that EAs have to follow.
  • New: management interface of Early Adopters and components: https://www.egi.eu/earlyAdopters/ being updated (the wiki table of EAs and components will be deprecated in the near future).

2 - Operational issues (all)

  • Batch system support/integration into the MW and in EMI in particular, all on Best Effort:
    • Torque: Nikhef
    • SGE: Cesga, LIP, (Imperial ?) - waiting for more information from EMI (Cream in particular) specially for the GLUE2
    • Condor: PIC?
    • LSF: CERN?, Padova?
  • Major changes in procedures, tools, repositories, affecting sites should be announced well in advance (2 weeks or so):
    • The example of the latest lcg-CA release.

3 - Operational Tools (Emir)

4 - COD issues (Malgorzata, Luuk)

5 - AOB

Next meeting: Monday 28 February 2011, 14h00 Amsterdam time


Back GridOpsMeeting