Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Agenda-14-02-2011"

From EGIWiki
Jump to navigation Jump to search
Line 22: Line 22:
  '''Ready for Certification''' UI 3.2.9
  '''Ready for Certification''' UI 3.2.9
  '''In Certification''' WN 3.2.10
  '''In Certification''' WN 3.2.10
  '''In Certification'''FTS/A/M 2.2.5
  '''In Certification''' FTS/A/M 2.2.5
** In staged rollout:
** In staged rollout:
  glite-CLUSTER 3.2.2 (No Early Adopter)
  glite-CLUSTER 3.2.2 (No Early Adopter)
Line 30: Line 30:


* Gathering of requirements for EMI 2.0 - deadline was 10 February
* Gathering of requirements for EMI 2.0 - deadline was 10 February
* The staged rollout wiki [[Staged-Rollout]] has been updated, and [[Staged-rollout-procedures]] contains information about
the procedures/steps that EAs have to follow.


===2 - Operational issues (all)===
===2 - Operational issues (all)===

Revision as of 18:04, 10 February 2011

Detailed agenda Grid Operations Meeting 14 February 2011

1 - Information, MW releases and Staged rollout (Mario)

1.1 - In staged rollout

  • glite 3.1:
    • Upcoming soon (possibly this week):
In Certification FTS/A/M 2.2.5
    • In staged rollout:
LFC no EA
DPM 1 EA has found problems, a memory leak does anyone want to try it also
    • Ready for release - staged rollout OK:
lcg-CE 3.1.46
glite-CLUSTER 3.1.4

We will have to evaluate if the LFC and DPM be released into production anyway, since it's the last release of those components in glite 3.1, and the current production release "suffers" from the same problem of memory leak.

  • glite 3.2:
    • Upcoming soon (possibly this week):
Ready for Certification LB 2.1.20
Ready for Certification UI 3.2.9
In Certification WN 3.2.10
In Certification FTS/A/M 2.2.5
    • In staged rollout:
glite-CLUSTER 3.2.2 (No Early Adopter)


1.2 - Information

the procedures/steps that EAs have to follow.

2 - Operational issues (all)

  • Batch system support/integration into the MW and in EMI in particular (Mario):

3 - Operational Tools (Emir)

4 - COD issues (Malgorzata, Luuk)

5 - AOB

Next meeting: Monday 28 February 2011, 14h00 Amsterdam time


Back GridOpsMeeting