Difference between revisions of "Agenda-14-02-2011"
Jump to navigation
Jump to search
Line 22: | Line 22: | ||
'''Ready for Certification''' UI 3.2.9 | '''Ready for Certification''' UI 3.2.9 | ||
'''In Certification''' WN 3.2.10 | '''In Certification''' WN 3.2.10 | ||
'''In Certification'''FTS/A/M 2.2.5 | '''In Certification''' FTS/A/M 2.2.5 | ||
** In staged rollout: | ** In staged rollout: | ||
glite-CLUSTER 3.2.2 (No Early Adopter) | glite-CLUSTER 3.2.2 (No Early Adopter) | ||
Line 30: | Line 30: | ||
* Gathering of requirements for EMI 2.0 - deadline was 10 February | * Gathering of requirements for EMI 2.0 - deadline was 10 February | ||
* The staged rollout wiki [[Staged-Rollout]] has been updated, and [[Staged-rollout-procedures]] contains information about | |||
the procedures/steps that EAs have to follow. | |||
===2 - Operational issues (all)=== | ===2 - Operational issues (all)=== |
Revision as of 18:04, 10 February 2011
Detailed agenda Grid Operations Meeting 14 February 2011
1 - Information, MW releases and Staged rollout (Mario)
1.1 - In staged rollout
- glite 3.1:
- Upcoming soon (possibly this week):
In Certification FTS/A/M 2.2.5
- In staged rollout:
LFC no EA DPM 1 EA has found problems, a memory leak does anyone want to try it also
- Ready for release - staged rollout OK:
lcg-CE 3.1.46 glite-CLUSTER 3.1.4
We will have to evaluate if the LFC and DPM be released into production anyway, since it's the last release of those components in glite 3.1, and the current production release "suffers" from the same problem of memory leak.
- glite 3.2:
- Upcoming soon (possibly this week):
Ready for Certification LB 2.1.20 Ready for Certification UI 3.2.9 In Certification WN 3.2.10 In Certification FTS/A/M 2.2.5
- In staged rollout:
glite-CLUSTER 3.2.2 (No Early Adopter)
1.2 - Information
- Gathering of requirements for EMI 2.0 - deadline was 10 February
- The staged rollout wiki Staged-Rollout has been updated, and Staged-rollout-procedures contains information about
the procedures/steps that EAs have to follow.
2 - Operational issues (all)
- Batch system support/integration into the MW and in EMI in particular (Mario):
3 - Operational Tools (Emir)
4 - COD issues (Malgorzata, Luuk)
5 - AOB
Next meeting: Monday 28 February 2011, 14h00 Amsterdam time
Back GridOpsMeeting