Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Agenda-13-06-2016"

From EGIWiki
Jump to navigation Jump to search
Line 69: Line 69:
|-
|-


}
|}


* enable dteam --> [list tickets]
* enable dteam --> [list tickets]

Revision as of 15:52, 9 June 2016


General information

UMD/CMD

Staged rollout updates

Preview repository

on 2016-05-17 released:

  • preview 1.2.0
    • LCMAPS-plugins-vo-ca-ap 0.0.1-1
    • STORM 1.11.11
  • Preview 2.1.0
    • NorduGrid ARC 15.03 update 6
    • LCMAPS-plugins-vo-ca-ap 0.0.1-1

Generic information about Preview repository: https://wiki.egi.eu/wiki/Preview_Repository

Note: EGI provides the preview repository without any additional quality assurance process, but the products are released as they are provided by the product team. EGI recommends the use of the UMD repositories, which contain software verified through the quality assurance process of UMD.

Operations

EGI Operations Support activities stopped

  • Operations Support core activity has not been re-bid in the phase 2 of the EGI core activities
  • all Operations Support activities have been moved to the EGI.eu Operations
  • all the operational procedures involving operations support have been updated pointing to EGI operations. Please, let us know if we

missed to update any documents.

  • The operations support support unit in GGUS has been decommissioned. Please, use the Operations support unit instead from now on.

Monthly Availability/Reliability

Decommissioning SL5

NGIs argus server not properly configured

FedCloud status

A/R profile

A/R profile March April May
improvements 2 6 5
unchanged 11 7 5
worsening 9 10 12
  • enable dteam --> [list tickets]

AOB

Next meeting