Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Agenda-12-09-2011

From EGIWiki
Revision as of 08:46, 12 September 2011 by David (talk | contribs)
Jump to navigation Jump to search
Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security



Detailed agenda: Grid Operations Meeting 12 September 2011 14h00 Amsterdam time

EVO direct link Pwd: gridops
EVO details Indico page

1. Middleware releases and staged rollout

1.1 EMI-1 release status (Cristina)

1.2 Staged Rollout (Mario)

1.2.1 gLite 3.2

  • CREAM 1.6.7: under staged rollout test, got delayed but proceeding.
  • FTS/A 2.2.5: still no EA

1.2.2 UMD1

UMD 1.2 to be released today https://wiki.egi.eu/wiki/UMD-1:UMD-1.2.0, also check http://repository.egi.eu/category/umd_releases/distribution/umd_1/. The list of products are:

  • ARGUS 1.3.1
  • CREAM 1.13.2
  • ARC-CE 1.0.1
  • ARC-Clients 1.0.1
  • ARC-Infosys 1.0.1
  • dCache 1.9.12-6
  • IGE Globus GridFTP 5.0.3
  • IGE Globus RLS 5.0.3
  • IGE Globus MyPROXY 5.0.3

The following candidate products have not been included:

  • StoRM 1.7.1: has been rejected in staged rollout.
  • MPI 1.0.4: issues have been found in staged rollout but not yet rejected.
  • WMS 3.3.3: issues have been found but under active investigation by the product team and the early adopter.

UMD 1.3 is due on the 31 October


1.3 Interoperability

2. Operational Issues

2.1 gLite 3.2 critical bugs and patches

3. AOB

3.3 Next meetings

26 September 2011