Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Agenda-10-09-2012"

From EGIWiki
Jump to navigation Jump to search
Line 21: Line 21:
*CREAM-SGE 2.0.0  
*CREAM-SGE 2.0.0  
*LB 3.2.6: but a new version is in the loop now 3.2.7, so that 3.2.6 maybe set to unpublished
*LB 3.2.6: but a new version is in the loop now 3.2.7, so that 3.2.6 maybe set to unpublished
Products in staged rollout:
*From EMI2:
**MPI 1.3.0
**UNICORE UVOS 1.5.1
*From IGE:
**Globus Default Security 5.2.1
**Globus Security Integration 2.2.0
**Globus MyPROXY 5.6.3
**Gridway 5.10.2
Products in verification


UMD-1.9.0: does not have a release date yet, but there are some products from IGE in staged rollout now:  
UMD-1.9.0: does not have a release date yet, but there are some products from IGE in staged rollout now:  

Revision as of 12:13, 10 September 2012

Detailed agenda: Grid Operations Meeting 10 September 2012

EVO direct link Pwd: gridops
EVO details Indico page

1. Middleware releases and staged rollout

1.1. Update on the status of EMI updates

1.2. Staged Rollout

UMD-2.2.0: tentative release date for 8 October 2012.

Some products ready in the UMDStore area, all SW provisioning done with success:

  • CREAM-SGE 2.0.0
  • LB 3.2.6: but a new version is in the loop now 3.2.7, so that 3.2.6 maybe set to unpublished

Products in staged rollout:

  • From EMI2:
    • MPI 1.3.0
    • UNICORE UVOS 1.5.1
  • From IGE:
    • Globus Default Security 5.2.1
    • Globus Security Integration 2.2.0
    • Globus MyPROXY 5.6.3
    • Gridway 5.10.2

Products in verification

UMD-1.9.0: does not have a release date yet, but there are some products from IGE in staged rollout now:

  • IGE-SAGA1.6.1

2. Operational Issues

3. AOB

3.1 Next meeting

4 Minutes