Agenda-09-01-2012
Jump to navigation
Jump to search
Main | EGI.eu operations services | Support | Documentation | Tools | Activities | Performance | Technology | Catch-all Services | Resource Allocation | Security |
Detailed agenda: Grid Operations Meeting 09 January 2012 14h00 Amsterdam time
EVO direct link | Pwd: gridops |
EVO details | Indico page |
1. Middleware releases and staged rollout
1.1 EMI-1 release status
1.2 Staged Rollout
1.2.1 gLite 3.2 security patches
Two gLite 3.2 security patches will soon come to staged rollout, will need fast response and testing:
- Torque Utils, Server, Clients
- APEL Publisher
1.2.2 UMD1
There are several updates under verification and staged rollout. The target freeze date to have the staged rollout done and reports published is on the 23 January. The UMD1.5 release is scheduled for the 30 January. The schedule is https://wiki.egi.eu/wiki/UMD_1.5.0_Contents
Status of candidate products:
- In staged rollout:
- DPM 1.8.2
- LFC (Mysql) 1.8.2
- Storm 1.8.1
- In verification:
- UNICORE UVOS 1.5.0
- To be verified:
- WMS 3.3.4
- LB 3.1.0
- MPI 1.2.0
- UNICORE Gateway 4.2.0
- UNICORE XUUDB 1.3.3
- IGE Gridsam 2.3.0
- IGE Gridway 5.8.1
2. Operational Issues
2.1 Requirements
The current requirements submission campaign closes on January 19th. In the following days they will be collected to be presented during the F2F OMB meeting.