Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Agenda-09-01-2012

From EGIWiki
Revision as of 13:01, 9 January 2012 by David (talk | contribs)
Jump to navigation Jump to search
Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security



Detailed agenda: Grid Operations Meeting 09 January 2012 14h00 Amsterdam time

EVO direct link Pwd: gridops
EVO details Indico page

1. Middleware releases and staged rollout

1.1 EMI-1 release status

1.2 Staged Rollout

1.2.1 gLite 3.2 security patches

Two gLite 3.2 security patches will soon come to staged rollout, will need fast response and testing:

  • Torque Utils, Server, Clients
  • APEL Publisher

1.2.2 UMD1

There are several updates under verification and staged rollout. The target freeze date to have the staged rollout done and reports published is on the 23 January. The UMD1.5 release is scheduled for the 30 January. The schedule is https://wiki.egi.eu/wiki/UMD_1.5.0_Contents

Status of candidate products:

  • In staged rollout:
    • DPM 1.8.2
    • LFC (Mysql) 1.8.2
    • Storm 1.8.1
  • In verification:
    • UNICORE UVOS 1.5.0
  • To be verified:
    • UMS 3.3.4
    • LB 3.1.0
    • MPI 1.2.0
    • UNICORE Gateway 4.2.0
    • UNICORE XUUDB 1.3.3
    • IGE Gridsam 2.3.0
    • IGE Gridway 5.8.1

2. Operational Issues

2.1 Requirements

The current requirements submission campaign closes on January 19th. In the following days they will be collected to be presented during the F2F OMB meeting.

3. AOB

3.2 Next meetings