= Detailed agenda: Grid Operations Meeting 09 January 2012 14h00 Amsterdam time  =
= Detailed agenda: Grid Operations Meeting 09 January 2012 14h00 Amsterdam time  =
Line 27: Line 28:
==== 1.2.2 UMD1  ====
==== 1.2.2 UMD1  ====


There are several updates under verification and staged rollout. The target freeze date to have the staged rollout done and reports published is on the 23 January. The UMD1.5 release is scheduled for the 30 January. The schedule is https://wiki.egi.eu/wiki/UMD_1.5.0_Contents  
There are several updates under verification and staged rollout. The target freeze date to have the staged rollout done and reports published is on the 23 January. The UMD1.5 release is scheduled for the 30 January. The schedule is [[UMD_1.5.0_Contents ]]


Status of candidate products:  
Status of candidate products:  
Line 60: Line 61:


January 20th 2012
January 20th 2012
[[Category:GridOpsMeeting]]

Latest revision as of 16:16, 29 November 2012

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security

Detailed agenda: Grid Operations Meeting 09 January 2012 14h00 Amsterdam time

EVO direct link Pwd: gridops
EVO details Indico page

1. Middleware releases and staged rollout

1.1 EMI-1 release status

1.2 Staged Rollout

1.2.1 gLite 3.2 security patches

Two gLite 3.2 security patches will soon come to staged rollout, will need fast response and testing:

  • Torque Utils, Server, Clients
  • APEL Publisher

1.2.2 UMD1

There are several updates under verification and staged rollout. The target freeze date to have the staged rollout done and reports published is on the 23 January. The UMD1.5 release is scheduled for the 30 January. The schedule is UMD_1.5.0_Contents

Status of candidate products:

  • In staged rollout:
    • DPM 1.8.2
    • LFC (Mysql) 1.8.2
    • Storm 1.8.1
  • In verification:
    • UNICORE UVOS 1.5.0
  • To be verified:
    • WMS 3.3.4
    • LB 3.1.0
    • MPI 1.2.0
    • UNICORE Gateway 4.2.0
    • UNICORE XUUDB 1.3.3
    • IGE Gridsam 2.3.0
    • IGE Gridway 5.8.1

2. Operational Issues

2.1 Requirements

The current requirements submission campaign closes on January 19th. In the following days they will be collected to be presented during the F2F OMB meeting.

2.2 Sites 'suspended' or 'candidate'

As discussed in one of the previous meetings, the sites in suspended or candidate status for too long ( before 01 June 2011) should be closed.

  • COD received some GGUS tickets about sites that will be certified in the next months to not be closed.
  • The other sites 'suspended' or 'candidate' for more than 6 months will be closed without further warning

3. AOB

3.2 Next meetings

January 20th 2012