Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Agenda-07-04-2014"

From EGIWiki
Jump to navigation Jump to search
Line 111: Line 111:
==== 3.1 Next meeting  ====
==== 3.1 Next meeting  ====


5th May 2014 (skipping one meeting due to Easter holiday)  
'''5th May 2014''' (skipping one meeting due to Easter holiday)


= 4. Minutes  =
= 4. Minutes  =


[[Category:Middleware]]
[[Category:Middleware]]

Revision as of 12:52, 4 April 2014

Audio conference link Conference system is Adobe Connect, no password required.
Audio conference details Indico page



1. Middleware releases and staged rollout

1.1 News from URT

Recent, or future planned, releases from the product teams:


1.2 UMD release

Ready to be released UMD 3.6.0:

  • Updates:
    • wms v. 3.6.3
    • cream_torque v. 2.1.3
    • dpm-yaim v. 1.8.7
    • gridsite v. 2.2.2
    • glexec-wn v. 1.2.2
  • New in UMD:
    • gfal2 v. 2.4.8
    • slurm-wn v. 1.0.0
    • cream-slurm v. 1.0.1
    • gridsafe v. 1.3.1

1.3 Staged rollout updates

New in SR:

  • wms v. 3.6.4

old stuff:

  • globus-default-security v. 5.2.4 ( 9 months)
  • security-integration v. 3.0.0 (7 months)
  • emi-cluster v. 2.0.1 ( 7 months)
  • globus-rls v. 5.2.5 (3 months)
  • mpi v. 1.5.3 ( 4 weeks )

UMD 3 Campaign

  • Contacting Sites (full site list) in order to update the products list now for the UMD-3 products. Some sites have the contact points for the EA adopters outdated so please check in table if all contacts are still correct and send me email if you need to add / remove some contacts (SSO account mandatory)
  • Sites who didn't replied and still tagged as EA for UMD1 / UMD2 products 21 of the total 80 teams (updated Friday morning):
    • NGI_BG, BG01-IPP
    • NGI_CH, CSCS-LCG2
    • NGI_CZ, prague_cesnet_lcg2
    • NGI_DE, FZK-LCG2
    • NGI-DK, UNICPH-NBI
    • NGI_FRANCE, GRIF
    • NGI_FRANCE, IN2P3-CC
    • NGI_HR, egee.srce.hr
    • NGI_IBERGRID, UPV-GRyCAP
    • NGI_MARGI, MK-01-UKIM_II
    • NGI_NL, SARA
    • NGI_SE, HPC2N
    • NGI_UA, UA-KNU
    • NGI_UK, UKI-LT2-RHUL
    • NGI_UK, UKI-NORTHGRID-LANCS-HEP
    • NGI_HR, egee.srce.hr
    • NGI_UK, UKI-NORTHGRID-MAN-HEP
    • NGI_UK, UKI-SCOTGRID-ECDF
    • NGI_UK, UKI-SOUTHGRID-CAM-HEP
    • NGI_UK, UKI-SOUTHGRID-OX-HEP
    • ROC_canada, CA-McGill-CLUMEQ-T2
    • Mixed cases:
    • NGI_IT, INFN-T1 (waiting for new contact person create an SSO account)
    • NGI_UK, RAL-LCG2 (already participating in many UMD-3 products. Only some components need to be update: MyPROXY, APEL FTS)

1.4 Next releases

  • Middle May
  • End of June
  • October

2. Operational issues

2.1 Report from DMSU

Nothing to report.

2.2 New Nagios Probes

2.1 EMI-2 decommission

  • Probes are running in midmon: Documentation.
    • All products but dCache are being retired as previously announced. dCache extended the support for the 2.2.x versions until July 2014.
  • List of services failing EMI-2 test: Download XLS file
    • Report any error ASAP


2.3 Probes raising alarms since March

  • since 12.03 EMI2 probes
  • since 11.03 Cloud probes
  • since 18.03 glue2 probes

3. AOB

3.1 Next meeting

5th May 2014 (skipping one meeting due to Easter holiday)

4. Minutes