Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Agenda-02-07-2012"

From EGIWiki
Jump to navigation Jump to search
Line 18: Line 18:
=== 1.1 EMI release status ===
=== 1.1 EMI release status ===


=== 1.2 Staged rollout   ===
=== 1.2 Staged rollout ===
 
Status of SW provisioning for UMD2:
*All ARC and UNICORE products are under the process being performed by EAs. Staged rollout reports are expected by Wednesday (4 July).
*Other high priority products:
**CREAM and the CREAM batch system plugins all under staged rollout, no SR reports received yet - should be sent until tomorrow (3 July) at most (4 July).
**


== 2. Operational Issues  ==
== 2. Operational Issues  ==

Revision as of 13:07, 2 July 2012

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security



Detailed agenda: Grid Operations Meeting 02 July 2012 14h00 Amsterdam time

EVO direct link Pwd: gridops
EVO details Indico page


1. Middleware releases and staged rollout

1.1 EMI release status

1.2 Staged rollout

Status of SW provisioning for UMD2:

  • All ARC and UNICORE products are under the process being performed by EAs. Staged rollout reports are expected by Wednesday (4 July).
  • Other high priority products:
    • CREAM and the CREAM batch system plugins all under staged rollout, no SR reports received yet - should be sent until tomorrow (3 July) at most (4 July).

2. Operational Issues

3 AOB

3.1 Apel parser development

(a) The APEL team is planning to redevelop the APEL parsers over the summer. For this, we need a good quantity of different batch system log files to test against. We need to catch as many edge cases as we can in our initial testing.

What we need is the batch system 'event log' files. A few megabytes from each site would be plenty. If you have 'blah' installed on your CE, blah log files for the same dates would be useful as well. Please also tell us the version / RPM of the batch system you are using, and the GOCDB name of your site.

The batch systems we are planning to support are:

PBS / Torque; LSF; Grid Engine; SLURM

If anyone is using a different batch system and feels that APEL should support it, they should get in touch.

Please send logs and / or queries to apel-admins@mailtalk.ac.uk.

3.1 Training events during EGI TF 2012

EMI will provide two training sessions during the TF:

  1. Training session for site administrators, Wednesday September 19th (TBC)
    • The session aims to provide training on the most relevant services deployed by the sites: CREAM,WN,DPM,BDII,WMS and YAIM configuration tool
    • Additional topics to propose? Considering that, this training session is targeted to non-highly experienced site managers of small resource centres
  2. Security training for site administrators
    • Thursday 20th September

3.2 Next meetings

Proposed date: July 16th 2012, 14:00 CET