URT:Agenda-04-11-2013
Audio conference link | Conference system is Adobe Connect, no password required. |
Audio conference details | Indico page |
UMD releases status
Status of the products verification/staged rollout
- UI v. 3.0.3 / WN v. 3.0.1
- Canl v. 2.1.4
- Gridsite v. 2.1.3
- CREAM-CE v. 1.16.2
- BLAH 1.20.3
- EMI.arc-ce.sl6.x86_64-3.0.3
- LFC v. 1.8.7
- Emi-cluster v. 2.0.1
- IGE security-integration v. 3.0.0
- IGE globus-default-security v. 5.2.4
- Unicore-hila v. 2.4.0
Ready for the release
- Cream-torque v. 2.1.1
- ProxyRenewal (Px) v. 1.3.34
- Gridway.sl5.x86_64-5.14.1
- Dpm.sl6.x86_64-1.8.7
- Bdii-top.sl5.x86_64-1.1.3
- Bdii-core.sl5.x86_64-1.5.4
Issues found during release preparation
During the verification of the last emi-wn we encountered a problem with the missing 32bits libraries cumming from lcg_utils. This issue was partially solved after the PT sent the list of the update 32bits libraries also update since one of this 32bits libraries asked for a dependency of another 32bits libraries from another PT (grid-site). Conclusion we needed to redo 4 PPA' s (WN, UI, gride-site and lcg_utils) which was time consuming and stressful.
Our release process doesn't automatically fetch all the necessary RPM from EPEL (otherwise we will fetch other dependencies not directly released by the PTs) meaning we always need an correct list of RPM's for each release even the 32 bits (not the full 32 bits list but only the 32bits rpm's needed by the 64 bits version).
Updates from the product teams
This section is directly contributed by the product teams. Please, add under your section the scheduled releases with a short comment about the updates introduced and where they are going to be released (EMI repositories, EPEL, private repositories ecc), linking external pages with these information is ok, but please add at least the expected date of the next release. It is important to discuss, within the URT, changes that may affect directly or indirectly other products. The text will be copied into the agenda of the next URT meeting, PT will just need to check that all the information are up to date. Please, feel free to alter the template if it doesn't feet with your needs.
APEL
- Release version x.y.z Expected: 2013-xx-yy
- Main changes: (including other products affected)
- Other information:
ARC
- Release 13.11 version 4.0.0 Expected: 2013-11-09
- Main changes: Major release, new BDB job storage, new infosys startup scripts, direct DQ2 support, improved WebDAV support, improved proxy handling
- Other information: RC2 expected to be tagged this week
Argus
- Release version w.k.j Expected on: 2013-xx-yy
- Main changes: (including other products affected)
- Other information:
dCache
- dCache Release Schedule
- Main changes: dcap client removed from EMI repos, now all dcap available via EPEL for SL5/SL6
- new Releases for UMD-2 dcache-server 2.2 and UMD-3 dcache-server 2.6 planned
- Other information:
DPM/LFC
- Next releases: 1.8.7 has been released to EPEL
GFAL/lcg_utils
- Release version: 1.16.0 has been released to EPEL
- Main changes: : https://svnweb.cern.ch/trac/lcgutil/wiki/GFALRelease_1_16_0
- Other information: We have proposed to WLCG (still pending approval) that this be the last gfal/lcg_util release and that these utilities be retired in favour of gfal2.
FTS
- Release version FTS3 (v3.1) is available in EPEL
- Main changes:
- FTS 3 is the replacement of FTS 2. It has been a pilot service tested by WLCG for several months and now it is ready to go to production.
- Details: https://svnweb.cern.ch/trac/fts3/roadmap
- Other information:
- Main changes:
BDII
- Release version:
- Main changes:
- Other information:
EMIR
- Release version:
- Main changes:
- Other information:
UNICORE
- Release version w.k.j Expected on: 2013-xx-yy
- Main changes: (including other products affected)
- Other information:
LB
- Release version w.k.j Expected on: 2013-xx-yy
- Main changes: (including other products affected)
- Latest releases
- L&B 4.0.11-1 (EMI-3), released Fri 21 June 2013 through the EMI repos, available officially since July 8 from EMI repos.
- https://github.com/CESNET/glite-lb/wiki/Glite-l%26b-release-page#wiki-LB_40111
- L&B 4.0.11-1 (EMI-2), released Fri 21 June 2013 through the EMI repos, available officially since July 8 from EMI repos.
- https://github.com/CESNET/glite-lb/wiki/Glite-l%26b-release-page#wiki-LB_32111
Gridsite
- Release version:
- Main changes:
- Other information:
Proxyrenewal
- Release version:
- Main changes:
- Other information:
CANL
- Release version:
- Main changes:
- Other information:
gLite- security
- Release version w.k.j Expected on: 2013-xx-yy
- Main changes: (including other products affected)
- Other information:
CREAM
- Plan to release version: Update EMI 2 & EMI 3 - 31 Oct.2013
- BLAH 1.20 4 (EMI 3)
- CREAM SLURM module 1.0.1 (EMI 3)
- CREAM TORQUE module 2.1.2 (EMI 3)
- CREAM 1.14.6 (EMI 2)
- Main changes:
- Other information:
STORM
- Next release: Oct. 2013
- STORM 1.11.3 (EMI 3)
- Main changes:
- Mainly WebDAV issues
- Other information:
VOMS
- Next releases: Oct 2013
- VOMS Clients v. 3.0.4, VOMS API Java v. 3.0.2 (EMI 3)
- VOMS Admin server v. 3.3.0 (EMI 3)
- Main changes:
- Other information:
WMS
- Next releases: EMI 3 - 31 Oct. 2013
- WMS 3.6.1 (EMI 3)
- Main changes:
- Sec. Vulnerabilities
- GGUS #96733 - glite_wms_wmproxy_server prints taint check warnings
- Other information:
Globus
- Release version 5.2.5 Expected "soon".
- Main changes: Bug fixes, most important is the fix for hanging gridftp server processes, http://jira.globus.org/browse/GT-428, also many IGE/EGCF provided patches have been accepted upstream.
- Other information: No tags mad in CVS yet, so it will still take a few days, but the above mentioned bug that was blocking the release is reported fixed.
QCG
- Release version 3.2.0 Expected on: 2013-11-15
- Main changes:
- SHA2 support
- integration with EGI Information System (if we manage to implement this).
- many improvements in QCG-SimpleClient
- configurable columns in qcg-list tool
- new #QCG directive in job description (#QCG include)
- qcg-resub - command
- Other information:
- Main changes:
Other topics
QC Document v6 released
The new QC document is ready to be used in verification. Available on HitHub. This release simplifies the verification process by reducing the number of criteria to check and by letting verifiers decide what functionality to test depending on the available effort and type of release.
Along with the QC document, there is also some complementary information:
- New verification report template.
- Available in doc, ODT and plain txt.
- Verifiers can use any of the formats. The QC document specifies what to report for each criterion.
- The verifier guideline , simplified for the new QC
- Guides on how to test and Specific guide
- Repository with sample tests
- Repository with sample configuration templates
Verifiers should start using them for any new products released. Please use the verifiers (sw-rel-qc@mailman.egi.eu) or the URT mailing list for questions doubts on the process.
Everything is linked from the verifiers guideline, so this is the main link to keep in mind.
AOB
- Next meeting November 18th 2013 15:00 CET
Minutes
Audio conference details
Room link: http://connect.ct.infn.it/egi-inspire-sa1/
Please provide you Name and product team/affiliation as Guest Name.
In left top corner you will find "Meeting->Audio Setup Wizard" Button which will help you to configure your audio.
You can test Your Computer with this link http://connect.ct.infn.it/common/help/en/support/meeting_test.htm
Adobe Connect tutorials: http://tv.adobe.com/show/learn-adobe-connect-8/
Adobe connect is flash-based, please if you have issues with your configuration try Chrome as browser.
Back to the URT agendas list page: URT_meetings_agendas