EGI-InSPIRE:Moldova-QR7
Jump to navigation
Jump to search
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
................7 | RENAM | Nicolai ILIUHA |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
23.12.2011 | The Academy of Sciences of Moldova | Lansarea oficială a asocierii la Programul Cadru 7 (Official launching of Moldova Association to FP7) | Representatives from research institutions of the Academy of Sciences, universities of Moldova, representatives from the Goverment and Parliament of the Republic of Moldova, representatives form the European Commission (more than 100 participants) | Dr. Peter Bogatencov from RENAM - NGI_MD coordinator, made a presentration “Participation in European eInfrastructure development projects” |
27.01.2012 | The Technical University of Moldova | Meeting of the Universities’ Rectors of Moldova Council | Rectors, vice-rectors of the universities in Moldova, representatives from research institutios of Moldova (over 50 participants in total) | Prof. Andrei Andries from RENAM - NGI_MD coordinator, presented a report “Dezvoltarea NREN - RENAM pentru promovarea serviciilor TIC în sfera educaţiei, ştiinţei si medicinii: starea actuala şi obiectivele de dezvoltare în anul 2012” where aspects of NGI_MD development were outlined |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
Providing support for the users on the MD-GRID CA operation and certs obtaining
Operation of MD-GRID CA
Participation in Virtual Team EGI Compendium https://wiki.egi.eu/wiki/VT_EGI_Compendium
Prepare 6 servers for first site with Virtualization (XenServer 5.6 was changed with VMware 5.0 hypervisor)
2.2. Main Achievements
Site MD-02-IMI was installed and configured using EMI-1 as grid software.
During installation we opened 2 tickets - first was successfully closed, but second (https://ggus.eu/tech/ticket_show.php?ticket=78797) is currently on hold, so now we are waiting for developers to solve this problem and release a new version of lcg_utils, and then we will continue the certification procedure on first site.
During this we work hard to bring online other 2 sites, where we had hardware difficulties trying to install Virtualization software.
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|