Difference between revisions of "EGI-InSPIRE:Jra1 2013-05-07"
m (moved Inspire jr1 2013-05-07 to Inspire jra1 2013-05-07) |
|||
Line 17: | Line 17: | ||
== 2. Critical Issues == | == 2. Critical Issues == | ||
== 3. Major work done during the past week by task == | == 3. Major work done during the past week by task == |
Revision as of 19:16, 12 March 2013
<< JRA1 weekly reports main page
1. Progress on Milestones Deliverables
MS710 - Operational Tools Roadmap
An updated version of the document satisfying reviewers’ comments has been uploaded in the document server: https://documents.egi.eu/secure/ShowDocument?docid=1501
D7.3 - Annual Report on Operational Tool maintenance and development activity
TOC available on the document server: https://documents.egi.eu/secure/ShowDocument?docid=1562.
The first draft will be available by this week.
2. Critical Issues
3. Major work done during the past week by task
3.1 TJRA1.1
- MS710 External Review
- D7.3
- JRA1 meeting: https://indico.egi.eu/indico/conferenceDisplay.py?confId=1344
- Analysis on JRA1 tasks effort used versus plan with data coming from QR11
- Analysis of the MiniProjects proposals VAPOR and GOCDB Scoping Extensions and Management Interface
3.2 TJRA1.2 TJRA1.3 TJRA1.5
3.2.1 SAM
SAM U20: WLCG experiments completed the validation last week. Therefore we are going to update our central installation.
SAM U21 ongoing: integration of the EMI probes
RT2791: It can be supported without any major modifications to SAM given that GOCDB provides a link that would list both locally and globally scoped services for a given region.
3.2.2 GOCDB
Status Update:
- V5 (Doctrine): Aiming to release a test version in next few weeks to test main PI methods (PI now nearly reproduced using Doctrine DB).
- New AAI layer for abstracting different authentication mechanisms integrated into v5 (e.g. x509, un/pw - loosely based on Spring Security3).
- Service type request in progress (‘ARC-CE’ to ‘org.nordugrid.arex’).
- GOCDB Mini-project: Scoping Enhancements + Management Interface.
- GLUE2 XML rendering opened for public comment at OGF 37 (12th March)
- Will be adopted by new GOCDB PI methods (planned)
- Existing PI methods largely unchanged except for the PK changes described at: https://wiki.egi.eu/wiki/Doctrine
- Additional failover to be hosted at Daresbury Labs (UK)
- Hardware found, in prep.
RT Requirements Analysis:
V5 Release (end ~May):
- Support for other RDBMS: https://rt.egi.eu/rt/Ticket/Display.html?id=4516
Number of smaller issues will be addressed in v5 release:
- Output of get_downtime method (https://rt.egi.eu/rt/Ticket/Display.html?id=1017)
- Add link to GOCDB roc object in XML results of 'get_roc_contacts’ (https://rt.egi.eu/rt/Ticket/Display.html?id=1423)
- Blank Roles due to deleted users: (https://rt.egi.eu/rt/Ticket/Display.html?id=4642)
- Use scope pull-down consistently across Site/SE views: https://rt.egi.eu/rt/Ticket/Display.html?id=4466
- Hide EGI Visibility (Scopes for EUDAT)
- https://rt.egi.eu/rt/Ticket/Display.html?id=4595
Post v5 release:
- Add new REST (PI) method to programmatically insert downtimes, EUDAT+PRACE? (https://rt.egi.eu/rt/Ticket/Display.html?id=4935)
- GLUE2 XML Rendering (https://rt.egi.eu/rt/Ticket/Display.html?id=4517)
- Multiple Endpoints per Service: (https://rt.egi.eu/rt/Ticket/Display.html?id=3347)
- Mini-project: Scoping enhancements + Management interface.
3.2.3 GGUS
Status Update:
GGUS release 2013-02-27
- GGUS web interface
- New "Did you know?" Title: Ticket relation in GGUS
- Explaining status “waiting for reply”
- Decommission of the software release dashboard
- GGUS structure
- Decommission VO «demo.vo.edges-grid.eu»
- Decommission VO «ict.vo.ibergrid.eu»
- Interfaces to other systems
- Implement interface GGUS - IBERGRID RT
- Renew certificate of NGI_PL interface
- Renew certificate of NGI_IT interface
- Mail issues
- Migration of GGUS mail boxes to new infrastructure - Part 2
- Moved ggus.org domain from old mail infrastructure to new infrastructure
- Reporting
- GGUS RG: RG deviation of figures from manual reports
- GGUS RG: Implement SLA report "open tickets by priority
GGUS next release 2013-03-27
Items for next release are not yet defined, open items are recorded at:
- EGI RT: https://rt.egi.eu/rt/Dashboards/2636/GGUS-Requirements
- WLCG Savannah:
- for next release: http://tinyurl.com/cyxwzo4
- all open items: https://savannah.cern.ch/support/?func=browse&set=open&group=esc
3.2.4 Ops Portal
Protoype for A/R VOs based on Lavoisier console with a computation on a hourly basis with an aggregation also per day:
http://cclavoisier03.in2p3.fr:8080/lavoisier/index_dates_vo
3.2.5 Accounting Portal
Status Update:
- Security work
- Solved change on myOSG endpoint
- InterNGI developments
- Fixed US OSG views
- Fixed reptier2 for Brazil federation.
- New endpoint for UserDN publication SAM probe
- Updated links section
- Heavy Core refactoring
- OOP migration
- Regionalization improvements
- Fixed XML endpoints
- New view aggregating all region charts for InterNGI reports (NGI/COUNTRY).
Requirements Analysis:
- #196: NAGIOS probes for Accounting Portal - It is done
- #3210: visibility of historical data for de-commissioned sites in the accounting portal - dependant on gocdb support to mark closed historical sites (as opposed to name changes and test sites).
- #3497: summary view in accounting portal home page – to be done after rewrite.
- #3596: Additional views required in the Accounting Portal - Implemented as part of the InterNGI changes.
- #4609: First implementation of the regional Accounting Portal by Y3 – Covered on the meeting agenda
- #4653: Improve DN publication and the country reporting - Covered by the new SAM probe and publishing campaigns, also work done by SA1 staff, some NGIs refuse by law to make dta available.
- #4741: Decommissioned grid sites in the EGI Accounting Portal - Duplicate of #3210
- #4887: The VO member view of the Accounting Portal should properly list the VO/group/role accounting - Followed on GGUS #89640, originated by the correct way to display and categorize non-existent Role Information accross VOs.
3.2.6 Metrics Portal
Status Update:
- NGI summed metrics for NA2.
- New EGI.eu NGI for management purposes.
- Addition of new SA1 metrics.
- Changes in quarterly views and Excel reports.
- Redundant views removed.
- Changes in the auth system.
- Changes for QR11
- Prep work QR12
- Maintenance
Requirements Analysis:
- #628: Metrics portal provides Project & NGI metrics - It is a meta-ticket, I think it is done, but the scope is too generic.
- #3236: Metrics portal aggregated views - Done
- #4051: New NA2 metrics for Y3 on the Metrics Portal - Done
- #4306: Metrics portal menubar truncates on chrome – Not replicated yet on local chrome and chromium installations.
- #4308: Metrics portal access control - Mostly done, there are still problems with the group functionality
3.3 TJRA1.4 (Accounting for new resource types)
- EMI 3 APEL client certified for release.
- Cloud Accounting - additional cloud resource providers testing SSM v2 and using new Cloud Accounting record sending records to the new cloud accounting database - in preparation for the Community Forum demo.
4. Next Meetings
- Next week: Virtual Meeting for Mini-Project VAPOR
- Next JRA1 meeting at EGI CF 2013