Difference between revisions of "EGI-InSPIRE:Czech Rep-US-QR10"
Line 66: | Line 66: | ||
===2.1. User Support achievements=== | ===2.1. User Support achievements=== | ||
VO auger: | |||
Continuous bulk production. | |||
First discussions about possible use of the DIRAC as a file catalogue | |||
and possible also production system. Tests of file transfers to a new | |||
SE associated with the Prague site but located in Pilsen (aka | |||
distributed Tier2). Demonstration of jobs submition to the test cloud site | |||
during EGI TF demo. | |||
===2.2. Plans=== | ===2.2. Plans=== | ||
VO auger: continue in evaluation of parameter changes on the production efficiency, | VO auger: continue in evaluation of parameter changes on the production efficiency, |
Revision as of 10:30, 2 November 2012
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. User Support achievements
VO auger: Continuous bulk production. First discussions about possible use of the DIRAC as a file catalogue and possible also production system. Tests of file transfers to a new SE associated with the Prague site but located in Pilsen (aka distributed Tier2). Demonstration of jobs submition to the test cloud site during EGI TF demo.
2.2. Plans
VO auger: continue in evaluation of parameter changes on the production efficiency, test DIRAC file cataloque as a possible substitution for the LFC, clean the LFC from obsolete entries (if tools available and well tested), test FTS transfers from and to more sites. LHC VOs atlas and alice: continue with large scale production and analysis on praguelcg2 site, gradually decrease space allocated in the GROUPDISK and reallocate it to DATADISK, participate (at least remotely) in the Tier1,2,3 jamboree, follow recommendations of the DPM Community workshop, support local users VO belle: General support on the site, preparation of accounting reports for local Belle representatives
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|