Difference between revisions of "EGI-InSPIRE:Switzerland-QR7"
Jump to navigation
Jump to search
Line 53: | Line 53: | ||
|10.11.2011||Amsterdam||NIL kickoff meeting||1 from Switzerland||https://www.egi.eu/indico/materialDisplay.py?materialId=minutes&confId=659 | |10.11.2011||Amsterdam||NIL kickoff meeting||1 from Switzerland||https://www.egi.eu/indico/materialDisplay.py?materialId=minutes&confId=659 | ||
|- | |- | ||
|28.11. | |28.11.2011||Bern||Swiss Distributed Computing Day 2011||57||http://www.swing-grid.ch/event/516553-swiss-distributed-computing-day | ||
|- | |- | ||
|24.1.2012||Amsterdam||OMB||Two from Switzerland||https://www.egi.eu/indico/conferenceDisplay.py?confId=618 | |24.1.2012||Amsterdam||OMB||Two from Switzerland||https://www.egi.eu/indico/conferenceDisplay.py?confId=618 |
Revision as of 18:47, 17 February 2012
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
PQ7 | NGI_CH | SWITCH | Simon Leinen |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
10.11.2011 | Amsterdam | NIL kickoff meeting | 1 from Switzerland | https://www.egi.eu/indico/materialDisplay.py?materialId=minutes&confId=659 |
28.11.2011 | Bern | Swiss Distributed Computing Day 2011 | 57 | http://www.swing-grid.ch/event/516553-swiss-distributed-computing-day |
24.1.2012 | Amsterdam | OMB | Two from Switzerland | https://www.egi.eu/indico/conferenceDisplay.py?confId=618 |
24.-26.1-2012 | Amsterdam | Sustainability workshop | 1 from Switzerland | https://www.egi.eu/indico/conferenceDisplay.py?confId=709 |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
CSCS
- Preparing the move to the new Lugano building, which is almost ready. New hardware has been ordered and it is expected to move there by mid-april.
PSI
- Received new storage hardware (SGI SI5500 System with 2*60 3TB Disks, ca 270 TB of usable RAID6 space). Currently installing it.
- Further virtualization of services (directory services and central logging)
- Expecting delivery of additional compute nodes.
- new storage and compute nodes require massive restructuring of our network environment. Will be carried out in March.
UZH
- GC3Pie framework and AppPot frameworks have been adapted and used for a comp.chem usecase in collaboration with University of Perugia. Outcomes to be presented at the next EGI Community forum
2.2. Main Achievements
CSCS
- Move of most of production systems to KVM on SSD disks. This has notably increased the performance and reliability of the Grid related VMs.
- Installation of the new Interlagos CPU in 10 WNs, this increased to 32 the number of job slots per machine.
- Deployment of GPFS on previous Lustre hardware. This has notably increased the performance and stability of the scratch filesystem. GPFS seems to be way more performant than Luster for our current setup. Also, metadata is now exclusively on SSDs.
- Re-cabled part of the cluster switches and networks to prepare for the move.
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|---|
CSCS: ARC-CEs seem unable to properly work with gLite BDII | Waiting for new middleware update. |