Difference between revisions of "Service Level Target - ROD performance index"
Jump to navigation
Jump to search
Future plans
Line 9: | Line 9: | ||
== How the metrics is calculated? == | == How the metrics is calculated? == | ||
The metric is calculated monthly from the data gahtered by EGI Operations Portal. It does not <span lang="en" | The metric is calculated monthly from the data gahtered by EGI Operations Portal. It does not <span lang="en" class="short_text" id="result_box"><span class="hps">take</span> <span class="hps">into account</span> <span class="hps">weekends</span></span>. | ||
<br> | <br> | ||
Line 15: | Line 15: | ||
'''ROD OLA metric sum of:''' | '''ROD OLA metric sum of:''' | ||
*No. of ticket expired <span lang="en" | *No. of ticket expired <span lang="en" class="short_text" id="result_box"><span class="hps">appearance</span></span> | ||
*No. alarms older than 72h <span lang="en" | *No. alarms older than 72h <span lang="en" class="short_text" id="result_box"><span class="hps">appearance</span></span> | ||
<span lang="en" class="short_text"> | <span lang="en" class="short_text"> | ||
</span> | |||
'''The threshold was set to 10 items.''' Above this value ROD teams has to provide explanation and improvement plan.<br> | '''The threshold was set to 10 items.''' Above this value ROD teams has to provide explanation and improvement plan.<br> | ||
== Future plans<br> == | == Future plans<br> == |
Revision as of 11:58, 27 December 2011
ROD OLA metric
ROD OLA metric was introcuded to track the level of Grid Oversight service delivered according to Resource Provider OLA.
The metric was accepted during Technical Forum 2011 in Lyon and is available on EGI Operations Portal.
How the metrics is calculated?
The metric is calculated monthly from the data gahtered by EGI Operations Portal. It does not take into account weekends.
ROD OLA metric sum of:
- No. of ticket expired appearance
- No. alarms older than 72h appearance
The threshold was set to 10 items. Above this value ROD teams has to provide explanation and improvement plan.
Future plans
In the future the metric will also include no. alarms closed in NON-OK status without explanation. This will need some inplementation effort.
Issues to be implemented:
- Taking into account holidays periods in alarms ageing
- Automatic check if site/node is in downtime while alarm is closing
- Automatic check if node is not in production while alarm is closing