Difference between revisions of "EGI-InSPIRE:Serbia-QR6"
Jump to navigation
Jump to search
Line 108: | Line 108: | ||
===2.1. Progress Summary=== | ===2.1. Progress Summary=== | ||
* Operation of WMS/LB/VOMS/PX/LFC/Pakiti services for NGI_AEGIS, ATLAS and CMS VOs | * Operation of BDII/WMS/LB/VOMS/PX/LFC/Pakiti services for NGI_AEGIS, ATLAS and CMS VOs | ||
* Deployment of OpenFoam software (Open Field Operation and Manipulation) at the AEGIS01-IPB-SCL Grid site | * Deployment of OpenFoam software (Open Field Operation and Manipulation) at the AEGIS01-IPB-SCL Grid site | ||
* Security issues broadcasted by EGI-CSIRT team are dealt in timely manner | * Security issues broadcasted by EGI-CSIRT team are dealt in timely manner | ||
Line 117: | Line 117: | ||
* Regular attendance to Operations Management Board and Operations meetings | * Regular attendance to Operations Management Board and Operations meetings | ||
* Maintenance of CREAMCE, WMS, and LB staged rollout services | * Maintenance of CREAMCE, WMS, and LB staged rollout services | ||
* Contribution to EGI survey: ROD teams survey | * Contribution to EGI survey: ROD teams survey | ||
* Regular updates of NGI AEGIS Nagios box (responsible for NGI_AEGIS and NGI_GE) | * Regular updates of NGI AEGIS Nagios box (responsible for NGI_AEGIS and NGI_GE) | ||
Line 124: | Line 123: | ||
* Deployment of EMI BDII_top at AEGIS01-IPB-SCL Grid site | * Deployment of EMI BDII_top at AEGIS01-IPB-SCL Grid site | ||
* Update of CA RPMs: EGI Trust Anchor release 1.42 | * Update of CA RPMs: EGI Trust Anchor release 1.42 | ||
* Maintenance of NGI_AEGIS Helpdesk | |||
* Operation of AEGIS CA | * Operation of AEGIS CA | ||
Revision as of 23:01, 2 November 2011
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
QR6 | NGI_AEGIS | Institute of Physics Belgrade | Dusan Vudragovic |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
19/09/2011 | Lyon, France | EGI Technical Forum 2011 | 500+ | Central yearly event dedicated to EGI Initiative - EGI Technical Forum 2011 was held in Lyon, France between 19-23 September 2011. Through numerous lectures, training sessions, posters and demonstrations the forum provided a unique overview of the current developments of e-Infrastructure in Europe.
SCL's team, consisted of Antun Balaz, Dusan Vudragovic, Danica Stoljikovic and Vladimir Slavnic participated in this event. Beside their attendance in lecture and training sessions, they have been actively involved in discussions important for efficient functioning of the EGI-InSPIRE. Additionally, they participated in poster session where Toolkit for management of large-scale Monte Carlo applications was presented, and in the NGI's Operational Tools Marketplace session with in-house developed operational tools presentation. More information and presentation is available at: http://www.scl.rs/news/763 |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|---|---|---|
Influence of Interface Roughness Scattering on Output Characteristics of GaAs/AlGaAs Quantum Cascade Laser in a Magnetic Field | J. Phys. D: Appl. Phys. | 44 (2011) 325105; DOI: dx.doi.org/10.1088/0022-3727/44/32/325105 | 1. M. Zezelj 2. V. Milanovic 3. J. Radovanovic Et al. |
Phase Diagram, Energy Scales, and Nonlocal Correlations in the Anderson Lattice Model | Phys. Rev. B | 84 (2011) 115105; DOI: dx.doi.org/10.1103/PhysRevB.84.115105 | 1. D. Tanaskovic 2. K. Haule 3. G. Kotliar Et al. |
Symmetry Reduction in Multiband Hamiltonians for Semiconductor Quantum Dots: the Role of Interfaces and Higher Energy Bands | J. Appl. Phys. | 110 (2011) 053710; DOI: dx.doi.org/10.1063/1.3631048 | 1. S. Tomic 2. N. Vukmirovic |
Charge Transport in a Quantum Dot Supercrystal | J. Phys. Chem. C | DOI: dx.doi.org/10.1021/jp206526s | 1. I. H. Chu 2. M. Radulaski 3. N. Vukmirovic Et al. |
SPEEDUP Code for Calculation of Transition Amplitudes Via the Effective Action Approach | Commun. Comput. Phys. | 11 (2012) 739; DOI: dx.doi.org/10.4208/cicp.131210.180411a | 1. A. Balaz 2. I. Vidanovic 3. D. Stojiljkovic Et al. |
2. ACTIVITY REPORT
2.1. Progress Summary
- Operation of BDII/WMS/LB/VOMS/PX/LFC/Pakiti services for NGI_AEGIS, ATLAS and CMS VOs
- Deployment of OpenFoam software (Open Field Operation and Manipulation) at the AEGIS01-IPB-SCL Grid site
- Security issues broadcasted by EGI-CSIRT team are dealt in timely manner
- Contribution of all NGI AEGIS sites to EGI survey: Survey for site managers on current UMD deployment scenario
- Operational support to NGI_BA and NGI_GE
- Contribution to EGI survey: IPv6 survey for NGIs
- Regular middleware updates on all NGI_AEGIS sites
- Regular attendance to Operations Management Board and Operations meetings
- Maintenance of CREAMCE, WMS, and LB staged rollout services
- Contribution to EGI survey: ROD teams survey
- Regular updates of NGI AEGIS Nagios box (responsible for NGI_AEGIS and NGI_GE)
- AEGIS04-KG Grid site is fully upgraded to gLite-3.2
- Major hardware upgrade of AEGIS05-ETFBG Grid site
- Deployment of EMI BDII_top at AEGIS01-IPB-SCL Grid site
- Update of CA RPMs: EGI Trust Anchor release 1.42
- Maintenance of NGI_AEGIS Helpdesk
- Operation of AEGIS CA
2.2. Main Achievements
- AEGIS04-KG Grid site is fully upgraded to gLite-3.2
- Deployment of EMI BDII_top at AEGIS01-IPB-SCL Grid site
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|