Difference between revisions of "NGI DE CH Operations Center:Operations Meeting:21102011"
Jump to navigation
Jump to search
Line 55: | Line 55: | ||
* MPI-K | * MPI-K | ||
* MPPMU | * MPPMU | ||
- SAM test mapping issue solved | |||
- upgrading to glite-CREAM > 3.2.13-1 | |||
- Down Time next week | |||
* RWTH Aachen | * RWTH Aachen | ||
* SCAI | * SCAI |
Revision as of 13:28, 21 October 2011
Introduction
- Minutes of last meeting
- SGE Support for cream from EMI Update 9
Announcements
- Meetings/conferences
- Availability/reliability statistics
The Availability/Reliability League statistics for September 2011 have been added to: https://wiki.egi.eu/wiki/Availability_and_reliability_monthly_statistics
UNI-Karlsruhe did not hit the targets and they were requested by Dimitri via email to update the corresponding ticket
- Monitoring
Email from Dimitri on Monday, 17. October 2011 14:17: Dear NGI-DE/NGI-CH sites manager, as you know, nagios SAM tests where using Wen Mei proxy certificates with OPS VO extension to submit SAM tests. This weekend Wen Mei's membershift in OPS VO expired, even her certificate is still vallid. This was cause of weekend failures for nagios SAM tests. Now tests are running under Foued Jrad certificate with OPS VO extension. But still some sites have failed tests. This looks like a mapping problem. So please check the mapping for Foued Jrad. In next days we would exchange this certificate with a robot certificate for SAM nagios tests and inform you.
- Staged rollout/updates
- Quater report August-October
Email from Jie Tao on Tuesday, 18. October 2011 12:36: Jie is collecting information for the coming quarter report (QR 6) covering August, September and October. She is expecting your contribution by October 31. Please send her (email: jie.tao@kit.edu) the report of your site directly. As the last QR, I need infos about: Main achievements Issues and mitigations conference/workshop organized (date, location, title, participants, short report) other conferences attended (date, location, title, participants, short report) Publications (title, journal/conference, volume No., page No., authors) ITWM, LRZ-LMU, JUERLICH: how many staged rollout components do you have for the reported quarter? (i.e. number of patches tested) Thank you in advance.
Round the sites
- NGI-DE
- BMRZ-FRANKFURT (Uni Frankfurt)
- DESY-HH
- DESY-ZN
- FZJuelich
- Goegrid
- GSI
- ITWM
- KIT (GridKa, FZK-LCG2)
FTS Connection problems for Oracle back end dCache OPS failing up to time
- KIT (Uni Karlsruhe)
- LRZ
- MPI-K
- MPPMU
- SAM test mapping issue solved - upgrading to glite-CREAM > 3.2.13-1 - Down Time next week
- RWTH Aachen
- SCAI
- Uni Bonn
- Uni Dortmund
- Uni Dresden
- Uni Freiburg
- Uni Mainz-Maigrid
- Uni Siegen
- Uni Wuppertal
- SwiNG
- CSCS
- PSI
- Switch
Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.
Status ROD
- Any problematic tickets?
- Handover of the ROD shift
42 17.10 23.10 Team3, KIT 43 24.10 30.10 Team4, JUELICH 44 31.10 06.11 Team5, BADW-LRZ 45 07.11 13.11 Team6, CSCS/NGI_CH
- ROD shift schedule https://wiki.egi.eu/wiki/NGI_DE_CH_Operations_Center:Operations_Teams#Shifts_rotation_table
AOB
If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.