Difference between revisions of "EGI-InSPIRE:Italy-QR4"
Jump to navigation
Jump to search
Line 55: | Line 55: | ||
| Poznan | | Poznan | ||
| GN3 SA2 T3 kick Off Meeting | | GN3 SA2 T3 kick Off Meeting | ||
| GARR: M.Reale, N.Ciurleo | | GARR: M. Reale, N. Ciurleo | ||
| Formalized participation of EGI Net Sup in PerfSONAR User Panel. Report (protected by GN3 wiki password: [https://intranet.geant.net/sites/Services/SA2/T3/Documents/Meetings%20and%20Calls/ST-GN3-20110215-SA2%20T3%20Feb%202011%20Poznan%20meeting%20minutes.docx] URL: [https://intranet.geant.net/sites/Services/SA2/T3/Meetings/SA2T3meetingFeb2011inPoznan/default.aspx] | | Formalized participation of EGI Net Sup in PerfSONAR User Panel. Report (protected by GN3 wiki password: [https://intranet.geant.net/sites/Services/SA2/T3/Documents/Meetings%20and%20Calls/ST-GN3-20110215-SA2%20T3%20Feb%202011%20Poznan%20meeting%20minutes.docx] URL: [https://intranet.geant.net/sites/Services/SA2/T3/Meetings/SA2T3meetingFeb2011inPoznan/default.aspx] | ||
|- | |- | ||
Line 61: | Line 61: | ||
| VCONF | | VCONF | ||
| Network Support update | | Network Support update | ||
| | | GARR: F. Galeazzi, M. Reale | ||
| Defined long term strategy for Network Support coordination for EGI. Short Report: [https://wiki.egi.eu/w/images/6/6b/EGI_Network_Support_coordination-2011-4-7.doc] | | Defined long term strategy for Network Support coordination for EGI. Short Report: [https://wiki.egi.eu/w/images/6/6b/EGI_Network_Support_coordination-2011-4-7.doc] | ||
|- | |- | ||
Line 67: | Line 67: | ||
| Vilnius | | Vilnius | ||
| EGI UF | | EGI UF | ||
| | | GARR (F. Galeazzi, A. Pagano, M. Reale), INFN (M. Bencivenni, R. Brunetti, D. Cesini, A. Cristofori, E. Fattibene, L. Gaido) | ||
| (1 demo, 1 poster, 1 talk, 2 booths);[http://uf2011.egi.eu/ http://uf2011.egi.eu/] | | (1 demo, 1 poster, 1 talk, 2 booths);[http://uf2011.egi.eu/ http://uf2011.egi.eu/] | ||
|} | |} |
Revision as of 10:11, 28 April 2011
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
QR4 | IGI | <NGI Country> | Paolo Veronesi |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
February 7-8, 2011 | Poznan | GN3 SA2 T3 kick Off Meeting | GARR: M. Reale, N. Ciurleo | Formalized participation of EGI Net Sup in PerfSONAR User Panel. Report (protected by GN3 wiki password: [1] URL: [2] |
April 7, 2011 | VCONF | Network Support update | GARR: F. Galeazzi, M. Reale | Defined long term strategy for Network Support coordination for EGI. Short Report: [3] |
April 11-15, 2011 | Vilnius | EGI UF | GARR (F. Galeazzi, A. Pagano, M. Reale), INFN (M. Bencivenni, R. Brunetti, D. Cesini, A. Cristofori, E. Fattibene, L. Gaido) | (1 demo, 1 poster, 1 talk, 2 booths);http://uf2011.egi.eu/ |
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
2.1.1. GARR
2.1.2. INFN
- Italian NGI (IGI) has been setup and the transition from ROC has been completed.
- Availability/Reliability: Feb (95%/97%), Mar (96%/97%) , Apr (NA).
- Site changes: GRISU-COMETA-UNICT-DIIT and GRISU-ENEA-GRID has been suspended on April for low availability and very long downtime period. The new site INFN-BOLOGNA-T3 has been certified on April.
2.2. Main Achievements
2.2.1. GARR
2.2.2. INFN
- The italian LFC service supports several VOs (argo, ams02.cern.ch, babar, bio, cdf, compchem, comput-er.it, superbvo.org, eticsproject.eu, enea, glast.org, gridit, inaf, infngrid, ingv, libi, pacs.infn.it, pamela, planck, theophys, tps.infn.it, virgo, euchina, enmr.eu, euindia, cyclops, compassit). The setup of this core service has been migrated to a high availability and fault tolerance configuration (two frontends and a dedicated server for the mysql backend, all checked via nagios).
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|